Loading...
HomeMy WebLinkAbout490088_Compliance Evaluation Inspection_20221229Facility Number 77 grDivision of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: �om fiance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ('Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Owner Name: rrival Time: Departure Time:( /220 / (Pr4,C f/11_S• (.9( £4,1 (/v6Owner Email: Mailing Address: Physical Address: Facility Contact: Phone: County: Region: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Integrator: Phone: Certification Number: Certification Number: Longitude: g-Pc7-9-g, Swine Design Current Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle Design Current Capacity Pop. Dairy Cow 649 1tQ- Dairy Calf /SV °i n Dairy Heifer /g'O -18 Dry Cow CO 0 Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a.. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes El NA ❑NE ❑Yes ❑No ❑NA El NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑No ❑NA ❑NE ❑ Yes ['No ❑NA_ ❑NE ❑ Yes [VNo ❑ NA ❑ NE Page 1 of 3 5/12/2020 Continued Facility Number: III - gg Date of Inspection: 2-f2Z- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes Ro ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 L) Identifier: !'I €i4 /yli/k 81r4 New JP Spillway?: Designed Freeboard (in): Z S, 2 2/Z- ( -22. Observed Freeboard (in): j 3 6" CO s f Y 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? IE7Yes ❑ No ❑ NA ❑ NE ❑ Yes ['No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes f'No ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE El Yes [lNo I] NA El NE ❑ Yes dNo ❑ NA ❑ NE ❑ Yes 12No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Outside of Acceptable Crop Window 12. Crop Type(s): 13. Soil Type(s): ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis Soil Analysis I]Rainfall ❑ Stocking ElCrop Yield ❑ 120 Minute Inspections [Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 ❑ Yes INo El NA El NE ❑ Yes g/No ❑ NA ❑ NE ❑ Yes �No ❑NA ❑NE, ❑ Yes dNo ❑ NA ❑ NE ❑ Yes 12/No ❑NA ElNFj ❑ Yes 'No ❑ NA ❑ ❑ Yes dNo ❑ NA El ❑ Other: [v'Yes El No ❑ NA ❑ NE ❑ Waste Transfers ❑ Weather Code ❑ Sludge Survey ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes �No El NA ❑ NE 5/12/2020 Continued 3M ❑ FAN© °N ❑ soA ❑ 3N ❑ VN ❑ °.K./E soA ❑ OZOZ/ZI/S 22O Z• / hZ :auogd gfo £ a2vd :ann;uu2is .'o;oadsuj/tamaina>j :OMEN to;°adsuj/tamaina>j ')'tit i f i d (J J''-i 0 \p-knAa - S2 VQ 0 S �S e uty,ovro IQbs K Q-i-i-b-3f \'"1a kc Ancv rigvmd -lc' 61 Ts' -1'+w) try) 1)Q cJSM` -� innv. sord-k1 s \r1,03 - -aoo -kd •(if znssaaau se sated iuuoi;ippn asn) suoi;un;is upnidxa ia;;aq o; S;gtanj 3o stuzntuip asn •s;uamtuoa .iaq;o fun ao suoi;upuaunuoaai iuuo►;ippn Sue .io/pun s.za,ttsuu sgA Attu uiuidx3 :(# uoijsanb o; .zajai) sivatutuoD aN ❑ �N ❑ dN ❑ VN ❑ VN❑ soA ❑ soA ❑ soA ❑ /,,touogu auzus ogi,tq;!sin dn-mojjoj e azinbat,tlijzouJ alp saoc •i,£ rani;E;uasazda.' alis-uo uu q;im uoiloadsui/main.' ssnoszp o; lluj Joloadsuj/zamaino>J au; pici •££ LdIAImVO zo;iuuad ogjo aouEijduzoo-uou asnEo goigm palou suzajgozd jEuoilippe °tam •Z£ :zag1O ❑ puod aEtols/uooge7 ❑ pja13 uoi, otjddd ❑ VN ❑ oj�j,EI sal, ❑ •mojaq xoq a2Eizdozddu alp �joogo `sail jj �,,ilijiouj aq;;E;sixa surezp au; aoujznsgns oQ ' I £ � (uoi;Eoijddu-Jono `stuojgotd ptuogaatj `aa.'egosip "al) ;iuuad aN ❑ dN ❑ °Nig] sox ❑ ag; 4 pazinba.' sE suotlinlis iiouataum jo a°jjo iEuoi8a21 agl Apou ol jip3 XIijioEJ agl pia •0£ •Aja;uipauzuzi antleluasatdat iiliiuna zid jeuopa.' E louluoo 'min nj aN El FAN ❑ oNA] soA E Luzaouoo ,c4jiEnb ziu zo zopo uu mod iilijiouj ag; pip uoiloadsui alp Jo amp ail ly •6Z /,jeuuou imp zapg atom Imp sale.' AlijEl.'ouz;zodoi puu giq E FAN ❑ oj�j1h soli ❑ ivauznoop to/puu smog bZ gum sjuuijuu peal) jo asodsip Aijtadotd of 11J'ijtouJ ail Pia •8Z l/ �' sanssI ioq;p aN ❑ dN,.n oN Elsox ❑ Luoileotliltao (IVIEDs;uauzssassu ssoj sn.'ogdsogd u °moos of pj 4j1ou3 ail pia •LZ aN ❑ VNN E 09E sox E Loan qo ui toluzado pogniaa ,tjani;ou uu jo uoi;uluomnoop apino.'d of jiu3'2ijiouJ alp pia •9Z :aouegduzoo-uou uiluoipui ,ianzns iszg jo olup puu (s)aznlonzis lsri uoo2uj AIM ui sjanaj apnjs;uegduzoo-uoN ❑ sjanaj apnjs toj yjd E dojanap ol amj!Ed ❑ 'ianzns apnjs jenuuE alajdwoo of ampud ❑ -mop(' (so)xoq a;eiudozddE alp )joago `saX jj i,o pnjs of paleja.' suoilipuoo liuuad q;im aouEijdtuoo Jo ino iC;ijioej agl sI •SZ Lliuuad alp ,tq pazinba.' su luauzdinba uou;uoijddu a;sum aluzgijeo o; iluj' nm.' an Pia •bZ Z/Z•f :uoi;aadsu1Jo a;ua 9 g - 7 :aagtun.j £-11jiaud