Loading...
HomeMy WebLinkAboutWQ0043975_Application (FTSE)_20221117State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION DMslon of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number; W U 004-?`i 7..J (io becompletLdby DWR� All items must be -completed -or the _at> Aication will be returned I, APPLICANT INFORMATION: I . Applicant's name: Durham Count (company, municipality, HOA, utility, etc.) 2. Applicant type: F.! Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® Statc/County ❑ Municipal ❑ Other 3. Signature authority's name: Stephanie Brixey per 15A NC:AC 02T .11 iWi b Title; D r--ut Director/POTW Director 4. Applicant's mailing address. 5926 NC Hi hwa 55 East City: Durham State: NC Zip: 27713 - 5. Applicant's contact information: Phone number: (919) 560-9034 Email Address: sbrixCy.@&onc.Qov H. PROJECT INFORMATION: 1 Project name: Lamle. Road Industrial 2. Application/Project status: ® Proposed (New Permit) ❑ Existing PermiUProject If a modification, provide the existing permit number: WQ00 -. and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number; WQ00 3. County where project is located: Durham 4. Approximate Coordinates (Decimal Degrees)- Latitude; 35.926557' Longitude:-78.810524* 5. Parcel ID (if applicable): 164046 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Justin Beard License Number: 025954 Firm: McAdams Mailing address: 2905 Meridian Parkwa City: Raleigh State: NC Zip: 27713- Phone number: (9_i9) 360-5000 Email Address- beard[aancadamsco.com IV, WASTEWATER TREATMENT FACILITY (WWTF) INFORMA PION: 1. Facility Name: Trian le WWTP Permit Number: NCO026051 Owner Name. Durham Coun V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1 Permit Number(s): WQUnknown 2. Downstream (Receiving) Sewer Information: 8 inch 6� Gravity '-I Force Main 3. System Wide Collection System Permit Number(g) (if applicable); WQCS00038 Owner Name(s): Durham Coun FORM: FTA 06.21 Page l of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes [:]No O N/A 2. If the Applicant is a Developer of lots to be sold, has a Develo.-c:'s O;-erational A reenters FORM: DEV been attached? []Yes ❑ No ® N1A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA O;-. rational A reen,ent +• ORM: HOA and supplementary documentation as required by 15A NCAC 02T.0I 15(c) been attached? ❑ Yes ❑ No ® N/A 4. Origin of wastewater: (check all that apply): ❑ Residential (individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical; dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filler Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater. 100 % Domestic °/a Commercial % Industrial s See ) 5A NCAC 02T .0103- 20 ) If Industrial, is there a Pretreatment Program in effect? ❑ Yes[:] No 6. Has a flow reduction been approved under 15A NCAC 112T .01 141 # 't ❑ Yes ❑ No ➢ If yes provide a copof flow reduction approval letter with this aptllicadoa 7. Summarize wastewater generated by project: Establishment Type (see 02T.0I14(t)) Warehouse General business and office facilities Daily Design Flow' ° No. of Units Flow 100 gallbay 5 500 GPD 25 gai/employeelshifl 82 2,050 GPD gall GPD gal/ GPD gal/ GPD gal/ GPD Total 2,550 GPD a See 15.X NCAC 02T .0 i 14(b). (d). (6111 and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation recitals as defined in G.S. 42A-4 b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 1= A NCAC 02T.0I 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 2.550 GPD (par 15A NCAC 02T .0114 D Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why. ❑ Pump StationlForce Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow ❑ Flow has already been allocated in Permit Number: Issuance Dale: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM. F I'A 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0jQ5 & MDC Gravi Qewerq : 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 69 DIP D Section 11 & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria D Section [Ii contains information related to minimum slopes for gravity sewer(s) D Overdzing lines to meet minimum slope requirements is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC i Pump *tatlenslForce Mahis;: PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name. 2. Approximate Coordinates (Decimal Degrees): Latitude: 0 Longitude: - 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service 4. Operational point(s) per pump(s): gallons per minute (GPM) at _ __. feet total dynamic head (TDH) 5 Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.I.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) . 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1); ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T_0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must he permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(I)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: D Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS -- (02B .0200 & 15A NCAC 02T .0305(t)): 1. Does the project comply with all separations/altematives found in 15A NCAC 02T .0305i Il & (eV., ® Yes [:]No 15A NCAC 02T.0305(f) contains minimum se !aradons that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) ( 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 2Water mains (horizontal) l0 feet Reclaimed water lines (vertical - reclaimed over scwcr) 18 inches I Reclaimed water lines (horizontal - reclaimed over sewer) **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 2 feet I 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IV "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 50 feet ( 10 feet Any building foundation (horizontal) I 5 feet Any basement (horizontal) I_ 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains Any swimming pools Final earth grade (vertical) I 5 feet 1 10 feet 36 inches D If noncompliance with 02T.0305(f) or.Cel see Section X.1 of this application *I 5A NCAC 02T.0305 contains alternatives where separations in 02T.0305( cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpa,,�e 2. Does this project comply with the minimum separation requirements for water mains? ® Yes [-]No ❑ NIA ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ®Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft se aration re uirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Neuse - Lower ❑ No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 0213 .0200? ®Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 213.0202 5. Does the project require coverage/authorization under a 404 Nationwidelindividual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAU 02T_01 M c 6) (additional permiWcertifications)? ® Yes (:]No Per 15A NCAC 02'1'.0105 c 6 , directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7 Does this project include any sewer collection lines that are deemed "high -priority?" [:]Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interferencelconflict boxes require a variance approval. ➢ if yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permtttee or its representative at least once every six -months and inspections documented per I SA NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CIRRT1FICATIONS- Does the submitted system comply with 15A NCAC 02T, the Minimum Desi Criteria for the Permittin • of Pum. Srallons and Force Mains latest version and the Gravi- Sewer Minimum Desi n Criteria latest version as applicable'? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the re uest will be issued concurrently with the approval of the permit, and projects renuirirtk_a variance approval may be subject to longer review times. For projects rertuirinn two or more variances or where the variance is determined bt the Division to be a sit-nilicant portion of the protect, the full technical review is required. 2. Professional Engineer's Certification: 1, 11, attest that this application for l.. u l (`-oero TA%K-1 AIAL- (Professiorta Engineers name from Application Item II1.1.) (Project Name Gi m Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Desi.-n Criteria for Gravi Sewers, latest •-ersion and the Minimum Desi::n Criteria for the fast= Wrack Permittin : r•f Pum. Stations and Force Mains latest version Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina licensed Professional Engineer to referral to the licensing board (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: ot K rAL ' 02595 E Applicant's Certification per 15A NCAC 02T .0106(b): I, f'A aa X ::t5C � _ , attest that this application for _ - tin li_i.' Q S ul�1 (Signature Ailthanty Name from Applidation Item 1-3 ) (Project N me from Application Item It.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the DwLsion of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachmonts are not included, this application package will be returned to me as incomplete. Now. In accordance with General Statutes 143-215.6A and J 43-215.6B, any person who knowingly makes any false statement, representation, or eertificat:on in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000 as well as civil penalties up to $) 5,0-JU per violation Signature:: =JL }may L1 I FORM: FTA 06-21 Page 5 of .5 DWR Divi.skin ut kk!,,iler Itetii.i�f�i State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Durham Count Project Name for which flow is being requested: Lumley Road Industrial More than one FTSE no ay be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Triangle Wastewater Treatment Plant b. WWTP Facility Permit ##: NC0026051 c. WWTP facility's permitted flow 12 All flows are in MGD d. Estimated obligated flow not yet tributary to the WWTP 1.8055 e. WWTP facility's actual avg. flow 4.028 f. Total flow for this specific request 0.00255 g. Total actual and obligated flows to the facility 5.836 h. Percent of pennitted flow used 48.6 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) Design Average Pump Pump Daily Station Station Firm Flow** (Name or Permit Capacity, * (Firm / pf), Number) No. MGD MGD Stirru Iron W 0039913 6.50 2.60 (B) (C) (D)=(B+C) (E)=(A-D) Approx. Obligated, 'Total Current Not Yet Current Avg. Daily Tributary Flow Plus Flaw, Daily Flow, Obligated Available MGD MGD Flow Capacity*** 1.197 0.525 1.722 0.878 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2,5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Durham County Sewer Downstream Permit Number: W CS00038 Page I of 6 FTS E 10- 18 LQMItr good lndusfrial III. Certification Statement: I dnaAi ' i certify to the best of my knowledge that the addition of the volume of wastewater to be pe iRed in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing O)Ticial Signature Date Page 2 of FTSE 10-18 NC Dept of Environmental Quality IM MCADAMS PRIVATE SS EXT. COVER LETTER > NEY-20010 NOV 17 2M November 16, 2022 Raleigh Regional Ci ice Mr. Jason Robinson, P.E. NCDEQ, Division of Water Resources Water Quality Regional Operations 1628 Mail Service Center Raleigh, North Carolina 27699-1628 RE: Lumley Road Industrial Morrisville, North Carolina NEY-20010 Mr. Robinson, The accompanied Fast -Track Application (FTA 04-16) includes 145 linear feet of 8" PVC public gravity sanitary sewer main located along Lumley Road for the proposed Lumley Road Industrial development located off Lumley Road in Morrisville, NC. This project will consist of approximately 67,200 sf of industrial flex office building and associated parking. The total wastewater flow generated by this project is 1,400 GPD. The anticipated date of the first effluent discharge (certificate of occupancy) from the Lumley Road Industrial development is December 2022. In addition to this Cover Letter, this submittal package includes the following items: • Application Fee - A check for $480 made payable to North Carolina Department of Environmental Quality (NCDEQ) • Fast Track Sewer System Extension (FTA 04-6) application • Flow Tracking/Acceptance Form (FTSE 04-16) • Site Maps: ✓ USGS Topographic Map showing entire project area and closest surface water ✓ Area Map of existing property If any additional information is required, please let me know. We are happy to answer any questions and address comments that may arise during the review process. Sincerely, MCA AMS [- William H. Derks, P.E. - Director, Commercial creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 / 919 361.5000 tiyj� l RR ` 11 �'lFf. i{� �• I.CIy' t3clh b ski pft { w .{ ' nn��{•R.J/�' .'�_. }, �'�. i'..� y�cl'' 4`,x4 � .'c. � �� I 1 {...�1 . � 7 f� o f s, as °/a' i w AP 5~ ♦ r='t�, i!• -r1� 1J��f%.~`�[��'. � i {�1 '} � t4T� l .f►( :� vv;..a,' ,• L' a`x'+' � ��iF.'I-r'' _ i�r. r r I r`c l ' fc�?'t,�r�k�:j _ � ♦ .ley ti Pt �+ 4� 'r M1cSi }ct�w F .h / +4' • d�,� .k r2o� 40 f } ,yi.s,Tivk• ' .//.a nsc,io`Nb.tici Ii{ ri, �� � �J�yF};.y�•!!4�1 �`� �..� f! % rc '�;iiC �^ � C{t• !� `S ti� 3 �� �.i I ilrl!' •�i••'k'c S+•k'6,�r ' �7��n� jii�f l; l 3aj.�' •F-i�'*�yy � � ' �{ "^�: rt, Y � vj�. ������ � .�'� !i� �'�►� > v'7'� r j iclLUMLEY u'��li ROAD, i f r f All �]- _ W 70 8 LPG 51 TE Lake Shore E ! / Y f , N - n x�. EXANDER)DR r SOUTHERN'PKWY gao RIVERWJL WY oo . The John R. McAdamsGlenwood LU M LEY ROAD W'1MF198MA " One Glenwood avenue Suite C2 Raleigh, MC275o3 INDUSTRIAL NC Deft tp PROJECT NO. NEY2001 FILENAME NEY20414-USGS phone919.823 4300 USGS MAP CHECKED BY ACP fax 919 361.2269 license number: G0293, C 167 5513 LUMLEY ROAD NI$YrTzl MC A DA M S DU RHAK NC www mcadamsco.com Raleigh Regional Office NC Dept of Environmental Quality J MCADAMS NOV 17 ?(0 LETTER OF TRANSMITTAL Raleigh Regional Office Date: November 17, 2022 HAND DELIVER To: NCDEQ _ Re: Lumley Road Industrial Raleigh Regional Office Fast Track Sewer System Extension 3800 Barrett Drive Raleigh, North Carolina 27609 Job #: NEY-20010 I am sending you the following items: ❑ Drawings ❑ Letter ❑ Specifications ® Submittal ❑ Plans ❑ Prints Transmitted as checked below: ® For approval ❑ For your use ❑ As requested Remarks: Copy to: ❑ For review + comment ❑ Other ❑ Other ❑ Statement of Qualifications ❑ Other Signature: gL Adam Pike, PE / I Senior Project Manager, Commercial creating experiences through experience 621 Hillsborough Street, Suite 500, Raleigh, NC 27603 / 919. 361, 5000 Robinson, Jason From: Darner, Elyssa <edarner@dconc.gov> Sent: Monday, December 12, 2022 9:07 AM To: 'Adam Pike'; Wyatt Bone; Clay Guernier; Robinson, Jason; Brixey, Stephanie; Kurtz, Cassidy, Manuel, Vanessa Cc: Ron Nestico; Clay Guernier; Justin Beard; Chirichella If, Vincent J. Subject: [External] RE: Lumley Road Industrial Attachments: Lumley Rd Industrial Signed Permit Application.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Adam/Jason — The information in the application Adam attached is for private ownership which is incorrect. Please see the attached revised application package which lists the correct linear feet and map. Thanks! ELYSSA DARNER I PROJECT COORDINATOR U + DURHAM COUNTY 'Lon�ins*tinC altir; 5926 NC Highway 55 East Durham, North Carolina 27713 Office: (919) 560-9052 1 Fax: (919) 544 8590 Durham County I Utilities Division I Development From: Adam Pike <pike@mcadamsco.com> Sent: Thursday, December 8, 2022 4:55 PM To: Wyatt Bone <WBone@neyer.com>; Clay Guernier <CGuernier@neyer.com>; Robinson, Jason <jason.t.robinson@ncdenr.gov>; Brixey, Stephanie <sbrixey@dconc.gov>; Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; vanessa.manuel@ncdenr.gov Cc: Ron Nestico <rnestico@neyer.com>; Clay Guernier <CGuernier@neyer.com>; Justin Beard <beard@mcadamsco.com>; Darner, Elyssa <edarner@dconc.gov>; Chirichella ll, Vincent J. <vchirichella@dconc.gov> Subject: RE: Lumley Road Industrial Afternoon Jason, I looked over your comments and have addressed the cover letter. The application was correct and the cover letter needed updating. That is done in the attached PDF. I also added the needed information you requested for the USGS map. Please let me know if you have any questions. Thanks! Adam Pike PE Senior Project Manager office 919. 287.0857 mobile 919. 395. 2272 pike@mcadamsco.com 621 Hillsborough Street, Suite 500 Raleigh, NC 27603 www.mcadamsco.com Join Our Team M, V co *Our Raleigh office has moved! We can't wart to see you there soon. From: Robinson, Jason <jason.t.robinson@ncdenr.eov> Sent: Thursday, December 8, 2022 3:34 PM To: Ron Nestico <rnestico@never.com>; Clay Guernier <CGuernier@never. com>; Brixey, Stephanie <sbrixey@dconc.eov>; Beard, Justin <beard@mcadamsco.com> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.Rov>; Manuel, Vanessa <vanessa.manueI(a)ncdenr.gov>; Vinson, Scott <scott.vinson@ncdenr.gov>; Thomas, Zachary T <zachary.thomas@ncdenr.gov>; Chirichella II, Vincent J. <vchirichella dconc. ov>; Darner, Elyssa <edarner@dconc.gov> Subject: RE: Lumley Road Industrial ***This message is from an EXTERNAL sender*** Justin & Stephanie, We've done a quick preliminary review of the referenced application and have the following initial questions/comments: -The length of line and the design flow that are shown in the application (Items V1.7 and V11.1) do not match the lengths and flow that is provided in the narrative. Please explain this discrepancy. -Instruction F requires that the infrastructure (lines and PSs) be approximately shown on the USGS Topo Map. ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates" 1Ciri l}..i :;eel fr ii ii 14 Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Robinson, Jason Sent: Thursday, December 1, 2022 1:16 PM To: Ron Nestico <rnestico@neyer.com>; Clay Guernier <CGuernier@neyer.com> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov> Subject: RE: Lumley Road Industrial Ni Ron, I assume that 6-inch line isn't included in the application that was submitted? I'm assuming it meets on of the Permitted by Regulation Requirements of 15A NCAC 02T .0303(a)(1)? As required by .0303(a)(1), it must be approved by the local building inspector to be in compliance with the NC Plumbing Code. If that and all other requirements of .0303 are met (and it's not included in the application), then it doesn't need our (State) approval to be installed. -Jason ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919 791 4200 "Subscribe to Collection System $ Sewer Permitting Updates" D7 1E Departmont of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Ron Nestico <rnestico@never.com> Sent: Thursday, December 1, 2022 10:48 AM To: Clay Guernier <CG uernierPneyer.com>; Robinson, Jason <iason.t.robinson(@ncdenr.gov> Subject: RE: [External] Lumley Road Industrial CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Soam. Hi Jason, Wanted to thank you for taking time to talk this morning. Appreciate you doing whatever you can to help push this along since we are in a bad spot with Durham with them holding the permit due to the pump station capacity. I do understand you all are overwhelmed with the amount of applications coming, so again appreciate you taking time to talk and help out whatever way you can. One other quick note referencing Clay's email below about the sewer on the property side of the ROW, Durham is waiting for DEQ approval before we are able to set up the precon meeting. Is this something we can proceed at our own risk? We are talking about the area highlighted below in green. I - /-- — — — — — --"- -- — ----—— VIIEITy EEGFNU ——----—--— ———————— _ - Y ra a:.:•.:r4• r•.w�cs[•� :.rx: .>-.....n VIE `:!�.!'.i :r-la GENERAL NOTES* N �a„t. Sibs. '.F ArrE .M f •.J•EJ.4..*.— .�..�:4 vct l.!+:M E+a r+[!.nl w:hJM nN.! � — N— rv— ..-m. ., E w l uni.rsc••..Ir�y., � ME V Fa Al NWA I FST. Ii:4 Ron Nestico Director, Design -Build 4509 Creedmoor Rd., Suite 500, Raleigh, NC 27612 Mobile: 919-895-2854 www.never.com Of in 125 WORK KACES 2021 From: Clay Guernier <CGuernier@neyer.com> Sent: Thursday, December 1, 2022 7:54 AM To: Robinson, Jason <iason.t.robinson@ncdenr.gov> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Ron Nestico <rnestico@neyer.com>; Manuel, Vanessa <vanessa.manuel ncdenr. ov>; Vinson, Scott <scott.vinson ncdenr. ov>; Wyatt Bone <WBone@never.com>; Bob Brooks <bbrooks@never.com> Subject: RE: [External] Lumley Road Industrial Good morning Jason, thanks for the below information. I wanted to follow up to see if we could get a conditional approval to at least install the sewer service on our side of the ROW for this project. For the past 12 months we have been on hold while DCO performed their analysis for the pump station that serves this project, the state confirmed Durham's findings, and we were allotted capacity and thus our building permit was reissued to resume construction. As of today, I am erecting steel but am unable to start sitework. Based on the below approval timeline and then holding a precon meeting to start sewer work we are likely unable to perform sewer related activities until the end of January. I would like to request the permission to install sewer service on our side of the ROW and no further until the permit is issued, is this something that you could entertain? Please let me know if you would be open to discussing our options. I really appreciate the help. Thanks Clay Guernier MUMN Al NEVER i ESt.1894 Clay Guernier Project Manager, Design -Build 4509 Creedmoor Rd., Suite 500, Raleigh, NC 27612 Direct: 336-420- 5680 www.never.com V f in 125 k re�uts From: Robinson, Jason <0ason.t.robinson6@ncdenr.gov> Sent: Wednesday, November 30, 2022 4:34 PM To: Adam Pike <pike@mcadamsco.com> Cc: Clay Guernier <CGuernier ne er.com>; Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Manuel, Vanessa <vanessa.manuel@ncdenr.gov>; Vinson, Scott <scott.vinson@ncdenr.gov> Subject: RE: [External] Lumley Road Industrial ***This message is from an EXTERNAL sender*** Hi Adam, We received that application on 11/17. Due to the volume of applications we receive, our other duties, and being short- staffed, it's currently taking around 8 weeks to review and issue permits. We will get to it as quickly as we can, and we apologize for the delay. -Jason Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates** D7 E N J 4 (i-f ::APe iE it JA Q Department of Environmenfai puailty Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Adam Pike <pike@mcadamsco.com> Sent: Tuesday, November 29, 2022 11:05 AM To: Robinson, Jason <4ason.t.robinson ncdenr. ov> Cc: Clay Guernier <CGuernier@neyer.com> Subject: (External) Lumley Road Industrial CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Morning Jason, I have another fast track into your office. Probably was delivered two weeks ago or so. I've shared with the client that it can vary between 4 to 8 weeks and its first come/first serve for the review. This one took longer than expected due to challenges with DCO's regional lift station. As a result the project is under construction and this is a hot item. The client (copied) knows that this doesn't give them precedence to be skipped ahead. What I was hoping to gather was a approx. timeline for where it stood. It's more for the client to schedule with their sub of expected date for release of construction. If you could let me know when you get a chance that would be awesome. Thanks as always for the help! Adam Pike PE senior project manager ,,%4CA I.►A N1 office 919. 287. 0857 mobile 919. 395. 2272 pike@mcadamsco.com 621 Hillsborough Street, Suite 500 Raleigh, NC 27603 www.mcadamsco.com Join Our Team C) c *Our Raleigh office has moved! We can't wait to see you there soon. Caution: Do not click links or open attachments unless you recognize the sender and know the content is safe.