Loading...
HomeMy WebLinkAboutSW8900910_Current Permit_199010300 State -of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James G. Martin, Governor William W. Cobey, Jr., Secretary October 30, 1990 Bob Jamieson Regional Manager DIVISION OF ENVIRONMENTAL MANAGEMENT Dr. D. G. Bunn, M.D. Tidewater II Partnership 2215 Canterwood Drive Wilmington, North Carolina 28401 Subject: Certification of Compliance with Stormwater Regulations Stormwater Project No. 900910 Carolina OB-GYN New Hanover County Dear Dr. Bunn: This Certification is pursuant to the application for Carolina ON-GYN received on September 25, 1990, with additional information received on October 25, 1990. Based on our review of the project plans and specifications, we have determined that the stormwater control system complies with the Stormwater Regulations set forth in Title 15A NCAC 2H.1003(i). The runoff will be treated in two detention ponds which are sized to achieve 90% reduction in Total Suspended Solids. The detention pond for Tract II has been designed with volume sufficient to receive the first inch of runoff from a built out potential of 95% of the Tract. A revised plan must be provided and a revised Certification of Compliance issued by the Division of Environmental Management prior to development of Tract II. This Certification shall be effective from the date of issuance until rescinded. The project shall be constructed and maintained in accordance with the final plans and specifications approved by the Wilmington Regional Office. A professional engineer must certify that the stormwater system has been installed in accordance with the approved plans and specifications. The attached certification should be received by this Office within 30 days of completion of construction. Continued 7225 Wrightsville Avenue, Wilmington, N.C. 28403-3696 • Telephone 919-2564161 • Fax 919-256-8.72 A I- I !l . . Dr. Bunn October 30, 1990 Page Two -------------------- If you have any questions concerning this matter, please call Alexis Finn or me at (919) 256-4161. Sincerely, e Adkins Water Quality Regional Supervisor Attachment DA/AIF: 900910.APP cc: Phillip Tripp, Project Engineer Ron Covil John Parker, DCM Bill Mills Jim Herstine Alexis Finn Wilmington Regional Office Central Files DIVISION OF ENVIRONMENTAL MANAGEMENT Evaluation of Stormwater Treatment and Disposal System Draining to Waters Other Than Class SA PROJECT DATA Project Name: Carolina OB-GYN Project No.: 900910 Location (County, Township/Municipality, Address): Wilmington, North Carolina New Hanover County Applicant Name: Dr. D. G. Bunn, M.D. Tidewater II Partnership 2215 Canterwood Drive Wilmington, North Carolina 28401 Submittal Date: September 25, 1990 Water Body Receiving Stormwater Runoff: Greenfield Lake Classification of Water Body: "C" Swamp DETENTION POND EVALUATION 1. 2. 3. 4. 5. 6. Yes No The design storage is for the runoff from all impervious surfaces resulting from 1-inch of rainfall and is located above the permanent pool. Yes No The permanent pool is designed for 90% TSS removal. Therefore, no vegetative filter is required. Yes No The runoff completely draws down to the permanent pool in 5 days, but not less than 2 days. Yes No The mean depth of the permanent pool is a minimum of 3 feet. Yes No The inlet structure is designed to minimize turbulence and short circuiting. Yes No An appropriate operation and maintenance plan has been provided for the system. Continued WET DETENTION POND EVALUATION CONTINUED 7. Yes No THIS PROJECT MEETS THE STORMWATER CONTROL REQUIREMENTS OF 15A NCAC 2H.1003 (g), (i), (k), and (1) (For Yes, 1 through 7 must all be circled Yes.) Brief Explanation: Two detention ponds have been designed to remove 90% TSS without a vegetative filter. Prior to development of Tract II, a revised set of plans must be provided and a revised Certification of Compliance issued by the Division of Environmental Management. The runoff from Tract II will be routed to a detention pond which has been sized to receive the first inch of runoff resulting from 95% coverage of built upon surfaces. DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Wilmington Regional Office (iuw Date �— Individual Evaluating Form/Plans i • w Regional Supervisor cc: Applicant/WiRO/Mills/CF Engineer's Certification as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Proj ect ) for the hereby state that, to (Project Owner) the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date