Loading...
HomeMy WebLinkAboutSW8900910_Historical File_19901026OK� Project #: 900910 File Name: DET910 Reviewer:ALexis Finn Project Name: CAROLINA OB GYN Date: 10/26/90 ******************DETENTION POND ANALYSIS************************ POND AREA MEASUREMENTS: TRACT I ------------------------------ Total Drainage Area, DA: DA= 40050 ft^2 ## IDA (acre)) / 143560 ft^2/acre)= DA= 0.919421 Acres IMPERVIOUS SURFACE AREA CALCULATIONS: Structure Surface Area, A Runoff Coef., C sf Impervious Surface: 38047.5 1.00 Adjusted Surface Area = A * C = 38047.5 ft^2 ## Green Areas: 2002.5 0.2 Adjusted Surface Area = A * C = 400.5 ft^2 ## TOTAL: 38448 ft^2 ## Percent Impervious, %I: ESA/DA3*100= E 38047.5 / 40050 1*100= %I= 95.00%% Note: If %I < 30% check Density Option. If %I > 30%, require engineered system to minimize non -point stream degradation. POND SIZING: ------------ Minimum Required Storage Volume, VOLreq: note: SA has been multiplied by runoff coefficients ESA (ft^2) * 0 inch of runoff) * 0 ft/12 inch))= E 38448 ft^2 * 1 inch * 0.083333 ft/inch)= VOLreq= 3204 ft^3 ## POND SIZING: ------------ Bottom Elevation, ELb: Permanent Pool Elevation, ELpp: Area of Permanent Pool, App: Storage Pond Elevation, Esp: Area of Storage Pond, Asp: Runoff Storage Depth, d: (via project engineer's design: d ELsp - ELpp) Storage Volume Provided, VOLpro: Side Slope: 3:1 #### Volume 1, V1= App * d = 2730 ft^2 * 1 ft - Volume 2, V2= (Asp - App) * d * 0.5 = VOLpro = V1 + V2 = 2730 ft^3 + 322.5 ft^3 Note: VOLreq > VOLpro; However within 5%, therefore Pond Size is Acceptable. ----- % Excess Storage=(VOLreq / VOLpro) * 100 % Excess Storage = ELb = 5 ft ## ELpp= 10 ft ## App = 2730 ft^2 ## ELsp= 11 ft ## Asp = 3375 ft^2 ## d= 1 ft ## V1= 2730 ft^3 V2= 322.5 ft^3 VOLpro= 3052.5 ft^3 -4.96%< -------- rt� o a a 'c v io8 m r Oti��• a a �a m mmrl� n S -1 �1 30 Coco 0 rt f1 :%m i c "am mama at a ep E1 ^S wH �i 7 m 1� 777� 'Col rt rt rt r! ac cc o 8 8888 �vo'v a w H Epp N r v W pW, 1111����1111 BCD 0 _� 11 11 11 \ � at ro a o�CD%A aC 1�/J ref pV� W pV� W O �'pp M 00 O• a �p N VIA ' �. VI }� �. V�O•0 at pn a a o y. .t e » a. EL n A o g «� ' I'm go oMa pi 31. a 01 a mmm -o u n n rA aaa »** 0nnn as 3011 11 it 11 11 11 N o � NC J AO VIA VNI �O n rrt rat rrt K ram► .�.• NNNN N a! a 4113131 m CD CD m A LR ae I Z fA m 300 % y W 1 N i s 1* -1rt 9a O 1 O ro mm m 'r't 1 O 0 co Q -. � -h < rt w v V It m :; x� {doo <� mr r-- C3 3C 01 g rt 1 n' 0 76 m 'O m m 7^ A i6 O 'lot rrt O « ff01 EL IDS• N�+� am ^OS 11 ,C� a• sm eS. rt � 3� a 3, A*A `0 alee m ' O W N `• '0'O f0 + IF 4) 1 O A V v N VI i N KA LA r i x fR W N n 10 n co n ul ow 11 Or ID m ro II a 6 IGI 'O WW ��ppr 11 11 O 11 II 11 1 N O A�1 Fa VIU 1 1 i i 't"rt PT rtrt It It rt 1 1 yi {N W IV IV 1 1 i i % lk it t o lk 00 00 7 -I. ti. m IeC m IOC o 1g rtrt o 0 o m . m I7 O II %A% NN y vv :n 00 a �� mow m vv uua 1�'c o uua to.. m 3 \ a11 11 nu O O O N m N O u 10 — 00 � � � cm m'' \v MVI rt�3j N rt IA �I O'_' W ^ 1F W 0 ^ IF N ^ N pppp^ppp� N0 O W n -+ co a^ II ' > 01 V � � rt CDI rt CD m u n vai Irl 11 N 0 0 0 0 web g R �o N 8 Ra�° �..,, It -% W rt RR M W N N IV M 00 CO) r �m ``• m v s 6 ca (� �ofD i -a,)»cc c 110 m mmmm z -ra1 m M 0000 i In m v vvvv rt i m mmmm aev oms �rt z 1 � I=r � N 8 8 $000 Dar O -4 + m m m .22 11 11 It N cc� If O rW I .Q v1 11 11 11 11 W N O� A � .O y^j K V w Co LAI 00 �Capl m %M Ln N -+ n o v - n 7_ -WI. A N pppp`G m ; V 'O o m � rt S m I v m i m CY z m O m 'V S o 3 O � 3 p� • - O 5. -,a ow & art C 11 00 ItCD ^ r m 1i i A O rt -w tih rt rt It A 0 m v n w Q 'O O a R O 10 A i e V -• a om n� m- �� a q .nn. �. a 11 II n O '7 O O 9 �zn It q OF r ki- 4 5 ITS SOP kruv, -- L�iv e 7L(v -let nytQ 90% --V)-tAL 5,Af— A,( A -Z � IA I cxl nA., + A4 te n- ahmT!; CIC) 5007� WkL -0 2 s %rcvl L ko. 0 LF- TTER Off` TRANSMITTAL ANDREW & KUSKE CONSULTING ENGINEERS, INC. 202 North Fifth Avenue Wilmington, North Carolina 28401 Telephone: (919) 343-9653 John R. Andrew, P.E. J. A. Kuske, P.E. TO: - Y�PaK- QL1Al1z4 WE ARE SENDING YOU ❑ Shop Drawings ❑ Copy of letter DATE iO-Z4-9b JOB NO. 4:1106a 1 ATTENTION uEXis F w�! SUBJECT: [/J� A-rt� KIWI T l p -.E�ll5E0 evn�T�-A FAX NUMBER 919-343-9604 TOTAL PAGES SENT:: Please call 919-343-9653 should you have difficulty receiving. LrJ Attached ❑ Under separate cover via the following items: (Z"Prints ❑ Plans ❑ Change Order ❑ ❑ Samples ❑ Specifications COPIES DATE NO. = DESCRIPTION at P114-A �Z OETAIL& THESE ARE TRANSMITTED as checked below: For approval ❑ No exceptions taken ❑ For your use [:]Make corrections noted ❑ As requested ❑ Amedd-`and resubmit ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 REMARKS: a � 1990 — D E M 900910 PW,Rftete¢ - See.Remahks ❑ Returned for corrections [] Ret.urn corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US Y i fijFlsfc -T ho (-1 S 2 yOy2 M90 Commca--- &A esxrw QS W try A Md Qli�4rlo►1S oL l�ammP,.iTS. �FAtiUc c c Signed: Date Design Andrew and Kuske LSheetto-n-`to FT 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of Z. Check Job catr0tAA4- b e6'lW'Q- For Job No. ;�M2MWRW_ C,t Les. �H�uNA OB-�yA� �--10I58 NTEATk2&I Rp4b EXn,4-soAA [acT �m�E2V�ous AMA = 95°10 o- nttcA -15 Co.9S Acc�s� = p,`I'�1 AccES 4, 555 FT-' USE 5o� .ptprl4 -7.3 IFo¢. f0kitmAlIWAT fboL, kx- 9001. Te-S tZEnlol4A(- �c)cmac ram- .10-0 gd7rc ,r,0 Row Poor. 11, b 4Ektq C" 9W FT"" a }�a¢MiaL Pool ST " Q-ONOw- a4Em lmpEe (0)s A2.4.A = IlZ x 'o 1 6155 = dEEA 3-2,50 FT3 pftq£- pE.emfq"f"T root- SIDE SwPes -j1iaCAC.ra peiA of P-40 E,c.E,•(. 30= FT" I► a = 3850 'PTI- �JW-O*,L `6W0W- 10,0 4 11,4 = 3000 t Z ` 38GO _ 3¢Z6 FT 3 34M cVIM, � 3-5so Fri oK wU V E 0. V k D } 190 DEM PROJ Date 10-CB-90 Design 9;"r Andrew and Kuske _ 202 N. Fifth Ave, CONSULTING ENGINEERS, INC. Wilmington, N.C. 28409 Sheet 1 Z Of Z, Check Job �q For �q�wc.� Job No. t c s. �4+a O B -Uy�•( �i o lse> rz L Qfr«r Ptwc. u i Q A= aALU- s-ra x-TuM NELIA. • ' �/ `."^> >�.- �- <<r I - y z9 ter' -ICo 3� Fr; v,lo Z�3Z.Zx�•o� _ �0C9z r-rZ Cl - f C �Zy4) = O. I. - (. 3 5ay I �I¢�� VXLLL- zxZ BAQ 4. --� = 4-7 6' F--- to ye. 5w2at C�lf 3 Cl-1)I,c CAI 34 J'�1�5 C - ozz' 3 B ILo+ o.?Z= tvre E�E.Rb� t7155�PfiToR- o'rruET- E,TOXTUcf. as:. d max = O l06 L= At V4= 15•rs' 0g6x-":(-v4 Wf4r- C'.'Y g = al Oki 'jo rrL'o"p14L. DD f! 1990 DEM PRO] 4/0 use 14' x1Co` Y, Iz" State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James G. Martin, Governor Bob Jamieson William W. Cobey, Jr., Secretary Regional ManagerOctober 12, 1990 DIVISION OF ENVIRONMENTAL MANAGEMENT Mr. J. Phillip Norris, P.E. Andrew & Kuske Engineers, Inc. 202 North Fifth Street Wilmington, North Carolina 28401 Subject: Additional Information Stormwater Project No. 900910 Carolina OB GYN New Hanover County Dear Mr. Norris: The Wilmington Regional Office received a Stormwater submittal for the Carolina OB GYN on September 25, 1990. A preliminary review has determined that the submittal for the subject project is not complete. The following information is needed to continue our review: As Tract II is less than 1 acre, it is considered an outparcel by this Office. Therefore, either restrictive covenants are needed or Tract II must be included in the sizing of the detention pond. Per the Third Directive (copy attached) the detention pond sizing would account for the ultimate build -out potential (i.e. 100% impervious coverage), thus, the detention pond is undersized as it is now designed. ✓ 2. The Professional Engineer stamp on the plans must be signed and dated. / 3. A vicinity map is requested. Continued 7225 Wrightsville Avenue, Wilmington, N.C. 28403-3696 0 Telephone 919-256-4161 0 Fax 919-256-85T). Mr. Norris October 12, 1990 Page Two ---------------- This information should be received by this Office no later than November 12, 1990, or the subject file will be closed and construction may experience subsequent delay. If you have any questions, please call me at telephone number (919) 256-4161. sincerely, Alexis I. Finn Environmental Engineer AIF: 900910.00T cc: Bill Mills (2) Alexis Finn Central Files ENGINEERING WYATT E. BLANCHARD, P.E. County Engineer October 5, 1990. NEW HANOVER COUNTY ENGINEERING DEPARTMENT 414 CHESTNUT STREET WILMINGTON; NORTH CAROLINA 28401 TELEPHONE (919) 341-7139. Mr. Reuben A. Allen, Jr. Reuben Allen and Associates 1920 Tradd Court Wilmington, NC 28401 RE: Grading Permit G.P. 34-90 Carolina Ob-Gyn Dear Mr. Allen: p ECEIV1 UD 1 4 1991 OEM rRoJ 0 This office has reviewed the subject sedimentation and. erosion control plan. We find the plan to be acceptable. HOWEVER; ,THIS IS NOT A GRADING PERMIT. Please be advised that a copy of the approved soil erosion plan and a copy of issued grading permit must be available at all times at the site. New Hanover County's Soil Erosion and Sedimentation control program is performance oriented. Requiring protection of the natural resources and adjoining properties. If following the commencement of the project it is determined that the plan is inadequate to meet the requirements of the New Hanover' County Soil Erosion and Sedimentation Control Ordinance, this office may require revisions in the plan and its implementation to insure compliance with the ordinance. Recognizing the desirability of early coordination of sedimentation and erosion control, I would like to arrange a pre -construction conference with owner/agent, grading contractor, engineer, and myself. Proceed with the placement of the planned erosion control measures; these will be inspected at the pre -construction conference. Please contact this office to set the date of the pre -construction conference at which time you shall be issued the grading permit. However, this permit will not preclude any other permits or approvals necessary for beginning or completing this development. t RECEIVED OCT 10199U Wilmington 9.60 OI use OEM 11 Mr. Reuben A. Allen, Jr. Page Number Two October 5, 1990 Erosion control measures to be installed prior to grading: (1) All slopes to be on 3' (run) to 1' (rise) ratio. (2) All State drainage requirements are adhered to. (3) Silt fence to be installed as needed and a buffer must be maintained. (4) Construction exit to be located where construction traffic encounters a paved surface,(per plans). I look forward to working with you on this project. Sincerel , Jim Craig Cam ervation Engine r New Hanover County JC/dal cc: Phil Tripp, A & K'Engineers Steve Saieed, Miller Building Alexis Finn, D.E.M. Jeff Richter, Corps of Engineers Karen Williamson, City Parks and Rec Chuck Holden, City Zoning Jimmy Parker, City Engineering Karen Daniels, Inspections a LAO ti �,, s �-4 -C,T �orC� _.�c� to �IeVA�l.ofl cz,+) V:, C',:,41 �}--1VT1�F-�o�a 1GL2.� �• ✓ ,�V.a.�� r 1�.c..� Y 'Yt r2cXLo - Andrew & Kuske CONSULTING ENGINEERS, INC. 202 North Fifth Avenue P.0, 9 Box Box 28888 28459 Wilmington, North Carolina 28401 John R. Andrew, P.E. Telephone: 919/343-9653 Telephone: 919/754-5900 J. A. Kuske, P.E. Facsimile: 919/343-9604 September 19, 1990 North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management Water Quality Section 7225 Wrightsville Ave. Wilmington, NC 28403 Attn: Ms. Alexis Finn Re: Carolina Ob Gyn Wilmington, NC A&K Project No. 90158 Stormwater Management Plan Dear Ms. Finn: Enclosed please find one print of the subject plan, calculations and stormwater maintenance schedule. We have also enclosed the name and address of the owner. We have submitted the erosion control plan to New Hanover County for approval. Please review for approval and contact me should you have any questions or comments. Thank you for your assistance on this project. Sincerely, ANDREW & KUSKE CONSULTING ENGINEERS, INC. a--o ff, , Phillip G. Tripp Project Engineer PGT/jmc enclosure cc: Steve Saieed/Miller Bldg 0. E ill, -° Cao9io LU 1. 2. STORMWATER MAINTENANCE SYSTEM MAINTENANCE PROCEDURES FOR CAROLINA OB-GYN A & K Project No. 90158 RESPONSIBLE PARTY A. The project will be built and maintained by: Tidewater II Partnership 2215 Canterwood Drive Wilmington, NC 28401 (919) 343-1031 DETENTION POND A. The detention pond will be checked after every major storm event to insure that the outlet structure is working properly and is not clogged with debris. Remove any accumulated sediment or debris. Any signs of erosion or deterioration of the pond side slopes or any other feature must be repaired before the next storm event. B. The depth of the pond will be checked every six months to determine the depth of the permanent pool. The pond will be cleaned out when silt deposits reduce the depth of the permanent pool below 3 ft. 3. CERTIFICATION The Owner will submit to the Department of Environment Health and Natural Resources an Engineer's Certification that the stormwater facilities were constructed in accordance with approved plans. signature date fir. D.6 • '8"un1 D E M it �,� Andrew and Kuske CONSULTING ENGINEERS, INC. 202 North Fifth Avenue Wilmington, North Carolina 28401 John R. Andrew, P.E. J. A. Kuske, P.E. Telephone 919/343-9653 September 19, 1990 TO: N.C. Division of Environmental Management attn: Ms. Alexis Finn RE: Carolina Ob Gyn Wilmington, NC A&K Project No. 90158 Please note the following name and address for the Owner of the subject project. TIDEWATER CORPORATION 2215 Canterwood Drive Wilmington, NC 28401 0PhA1 G. Trip Project Engineer PGT/jmc ��� .. L�1 Il U l5 i Liu k")EM Date Design � Andrew and Kuske Sheet 90 . 1' 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of Check Job - =ForJob No. 2-aaMp `rbTat_ ImPEeVlnds XUA = 161} Opp 5F AyA��aecE Flo �1rcfFt a klo"w- PO&— Clara = 8.q M EEC -.O tDEffH FO�C. jMrcoMpg&t.T pow pat 9C)aje TSS (Zfr+^ 13r I " (Zu►.br4 At*^ = If lz- x 5 0W = .�. Z50 p--1 1 � �fW �,ZBO a3 eooL� 51100- 6w.£s = 3:l 6 UUALt 1i LCA E v4 10.0 = 4640 Sr- 1% N It It H 6dV1 6F 6Th"(.;�E y0Lu(& . i?,�rweE,,.l IG . D I I � a = 4540 - 48cz PT 3 L. .Abu,- FT-- > 54'a' ok Lu DEEM Date Design Andrew and Kuske meet 9N.C. $ 90T 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.28409 Of 3 Check. Job For Job No. ITIQ 6orcm(AatlEjC &LC.s. &6um oa-&Y" 901% z PAY pcAwCOMI _ lZzf aco SEe Foy _ AZaso rr3 d. 0051 " o,iv P �40 W 71CdT- d = (dosl ) � O' 08 OUTLET STLVGT4t &ECk u5PO, Z—'xz cAs"M F6e moue- = L- e Q = 8-Z C,Fs • Fec, Id le, 5raevi L- QI ,` ) t,s H = (Q13L) Pik ELE-v, 0,5 = 11.5 act ,L�o FL0001AJ& iL 0 E Wl Date Design Andrew Lind Kuske I Sheet :a f>II ,- 202 N. Fifth Ave. CONSULTING ENGINEERS, INC, Wilmington, N.C. 28401 3 Of Check Job For Job No. Tell 6 Toecmwev6c. &L615, 64m4m-p CIO vs Ekl" -p+--'6-1v-AlW. 5{zIµ+, OUT(XT lTWau(f, C�= S�Z Cis PIPS S�zE. = IS 0 5{-I L c'+T g Soto{ 3 , dtrnx = 1.5CC-4 = Q.h DI Fq.of W 6WA4.f, P� 5►zE _ �Sa J 'sr' = 0.5 JrngX p . 5 nv-�e-Na"E -rc) i 040 4 = 5.1 CFs (OIPE ,,(SIZE = 15 11 u6i� &A'm S.O(0.3 a'w s o.3 t L= lam{ TN ick�lESh = tZ{{ uSE. 1 O1 >< I& K. I." Z {{ use IZ x I , V u645- 10 k 10°_K tO� D E M Project #: 900910 File Name: DET910 Reviewer:ALexis Finn Project Name: CAROLINA OB GYN Date: 10/10/90 ******************DETENTION POND ANALYSIS************************ POND AREA MEASUREMENTS: ------------------------------ TotaL Drainage Area, DA: DA= 65740 ft^2 ## [DA (acre)] / [43560 ft^2/acre]= , DA= 1.509182 Acres IMPERVIOUS SURFACE AREA CALCULATIONS: Structure Surface Area, A Runoff Coef., C sf Buildings: 12908 1 Adjusted Surface Area = A * C = 12908 ft^2 ## Parking/sidewalks/streets: 36315 0.95 Adjusted Surface Area = A * C = 34499.25 ft^2 ## Green Areas: 16517 0.2 Adjusted Surface Area = A * C = 3303.4 ft^2 ## TOTAL: 50710.65,ft^2 ## Percent Impervious, %I: note: SA=(BUILDING + PARKING..)= 49223 sf 11tiv1' 40 0 (SA/DAI*100= ( 49223 / 65740 3*100= %I= 74.88%% Note: If %I < 30% check Density Option. POND SIZING: If %I > 30%, require engineered system to minimize non -point stream degradation. Minimum Required Storage Volume, VOLreq: note: SA has been multiplied by runoff coefficients ESA (ft^2) * (1 inch of runoff) * (1 ft/12 inch)]= ( 50710.65 ft^2 * 1 inch * 0.083333 ft/inch]= VOLreo= 4225.887 ft^3 POND SIZING: ------------ Bottom Elevation, ELb:. ELb = 6 ft ## Permanent Pool Elevation, ELpp: ELpp= Area of Permanent Pool, App: App = Storage Pond Elevation, Esp: ELsp= Area of Storage Pond, Asp: Asp = Runoff Storage Depth, d: (via project engineer's design: d = ELsp - ELpp) d= Storage Volume Provided, VOLpro: Side Slope: 3:1 #### Volume 1, V1= App * d = 4724 ft^2 * 1 ft V1= Volume 2, V2= (Asp - App) * d * 0.5 = V2= VOLpro = V1 + V2 = 4724 ft^3 + 694.5 ft^3 "fmppoue Note: VOLreq 4-1pic, zx dss Storage is avaiLabh Q, tr^refcre Pon-j Size is Acceptable. ----- % Excess Storage=(VOLreq / VOLpro) * 100 % Fxaea tarage DETENTION POND ANALYSIS CONTINUED: PAGE TWO PERMENANT POOL: Perm. Pool at Normal Level= 10 ft Bottom of Pond = 6 ft Depth Provided, D = 4 It <----- Okay, depth > OR = 3 ft. SA/DA CALCULATION: By Chart #4; 8 90% TSS: Depth, D = 4 ft % impervious = 74.88% DA = 1.509182 Acres SA/DA % = 6.5 #### Area of Permanent Pool Required = (SA/DA %) * DA 10 ft ## 4724 ft^2 ## 11 ft ## 6113 ft^2 ## 1 ft ## 4724 ft^3 694.5 ft^3 5419,5 ft"3 Area of Permanent Pool Required = 6.5 * 1.509182 Acres Area of Permanent Pool Required = 0.098096 Acres Area of Permanent Pool Required = 4273.1 ft^2 Area of PERMANENT POOL Required-- 4273.1 sf < provided area of ORIFICE / OUTLET SIZING: VOLpro = 5418.5 Orifice outflow, 2 Day Drawdown = Volpro/[(2 day) * (86400 sec/day)] Orifice outflow, 2 Day Drawdown = 5418.5 ft^3 / 172800 sec = Orifice C.S. Area, A: A= 0/[Cd((2gh)^0.5))3 4724 sf <--OKAY: sufficient storage area Q2= 0.031357 cfs A= 0.031357 / [0.6*((2*32.2*1.0)AO.5))3= A2= A2= Pipe diameter, d: d2= Note: Head, h = maximum pond level - permanent pond level = Coeficient of Discharge, Cd = 0.6 Orifice outflow, 5 Day Drawdown = Volpro/[(5 day) * (86400 sec/day)] Orifice outflow, 5 Day Drawdown = 5418.5 ft^3 / 432000 sec = 05= Orifice C.S. Area, A: A= Q/[Cd((2gh)AD .5))] 0.006512 ft^2 0.937785 inch^2 1.092714 inch 1 ft 0.012542 cfs A= 0.012542 / [0.6*((2*32.2*1.0)^0.5))3= A5= 0.002604 ft^2 A5= 0.375114 inch^2 Pipe diameter, d: d5= 0.691093 inch UKK� e dpravidzdd < Q7 0,7 < ?.0 < `lot <------ OKAY ... a Orifice is sized correctly. LETTER OF TRANSMITTAL ANDREW & KUSKE CONSULTING ENGINEERS, INC. 202 North Fifth Avenue " Wilmington, North Carolina 28401 lephone: (919) 343-9653 John R. Andrew, P.E. J. A. Kuske, P.E. TO: D,C—. K. DATE r ,5 �(�� JOB NO. ATTENTION % SUBJECT: FAX NUMBER 919-343-9604 TOTAL PAGES SENT: Please call 919-343-9653 should you have difficulty receiving. WIE ARE SENDING YOU Attached ❑ Under separate cover via ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples [] Copy of letter ❑ Change Order ❑ the following items: ❑ Specifications r%r-Av►r-n rrw: COPIES DATE NO. DESCRIPTION JAN 19 1993 Wilmington Regionai office DEM JAN 2 ' 1993 DEIV] qcc) 910 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your use ❑ As requested ❑ For review and comment ❑ FOR BIDS DUE REMARKS: ❑ No exceptions taken ❑ Make corrections noted ❑ Amend and resubmit' - El 19 ❑ Rejected See Remarks ❑ Returned for corrections ❑ Return corrected prints L1 PRINTS RETURNED AFTER LOAN TO US c c . <-::; Z Signed: A '► Engineer's Certification I, PHILUP �. 12►f+P , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically the construction of the project, &O.OUI'An p6-�Yr,l (Project) 6alm►�ML �AGUT1{S- _ �f oo91p) for the I IMV4 Ty- M Hqe--r'-*�%p hereby state that, to (Project Owner) the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature ' Registration Number li 3Z� Date I. 1� • G CRRO Il�,�9ePs K ' SEAL � a .11374. o o '1 J°aa E' r' eee•Q� e d� jj� °�sa.00ceoa `0� Je}'�FtiO+llCL���, U L6 U is u ti L4 bu UA JAN 2 1 1993 D E M