HomeMy WebLinkAbout20070676 Ver 1_Acceptance Letter_20070607os~stem ~_
~..'.,Tl 1G~1:. '~',~:i~~'.~~~.
P R06RAM
Mazch 8, 2007
Asa H. Gray III
PO Box 619
Rodanthe, NC 27968
Project: Cedar Hammock Resort Travel Trailer Park
JVI't L' _.~,
County: Dare
The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Pragram (NCEEP) is willing to
accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that.
the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the
applicant to contact these agencies to determine if payment to the NCEEP will be approved.
This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of
the issued 404 Permit/401 Certiirication/CAMA permit within this time frame, this acceptance will expire. It is the
applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit{s) an invoice
will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized
work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and
policies listed at www.nceep.net.
Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the
following table.
Tar-Pamlico
03020105 Stream (feet) Wetlands {acres) Buffer I
(Sq. Ft.) Buffer II
(Sq. Ft.)
Cold Cool Warm Ri azian Non-Ri azian Coastal Mazsh
Impacts 0 0 0 0 0.09 0 0 0
Credits 0 0 0 0 0.18 0 0 0
Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies
require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional
mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The
mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of
Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998.
If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921.
Sincerely,
c~ • ~+'
am D. Gilmore, PE ((JJ ~-
Director
cc: Cyndi Karoly, Wetlands/401 Unit
Tom Steffens, USACE- Washington
Kyle Barnes,DWQ-Washington
Doug Huggett, NCDCM-Morehead City
Cary House, agent (email)
File
t~.PiS~"OYGf2~! ... ~ ~ ... PYD~Gt'!,!'L9 OGLY St-R~Pi
Q~~~odr~ ~
JUN 1 9 2007
DENR -WATER QUAL{TY
YI~TLANDS AND STOFi'AMIl1TtA BRANCH ~~~
A~CD~EFR
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1 852 / 91 9-71 5-0476 / www.nceep.net