Loading...
HomeMy WebLinkAbout20150164 Ver 1_401 Application_20150215ATLANTIC ENVIRONMENTAL CONSULTANTS, LLC P.O. Box 3266, Kitty Hawk, NC 27949 (252) 261 -7707 fax (252) 261 -2965 February 4, 2015 Jennifer A. Burdette NC DWR, 401 Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 RE: Moseley — Nationwide #18 Hatteras Village, Dare County Dear Ms. Burdette, Enclosed is a Preconstruction Notification Form (PCN) for a Nationwide# 18 permit to develop a lot located at 57121 Kohler Drive in Hatteras Village, Dare County, North Carolina. The proposed impact includes wetland fill in Section 404 wetlands to construct a single family residence. Wetland impacts were limited to a total of 0.10 acre, which is covered under a USACE Nationwide 18 General Permit. We request that you initiate the application process and if have questions or need additional information please contact me at 252- 261 -7707. Sincerely, ` Doug Dorman Atlantic Environmental Consultants, LLC cc: Kyle Barnes, USACOE Transmittal Letter February 4, 2015 Atlantic Environmental Consultants, LLC PO Box 3266 Kitty Hawk, NC 27949 252 - 261 -7707 dougdorman @embargmail.com To: NCDWR - Attention: Jennifer A. Burdette 1650 Mail Service Center Raliegh, NC 2699 -1650 ��� Moseley PCN Job Number: - 'Sut�mittad�uantet`y�, 4 VVe,'are's'endi'n9�.You ' ie( Attached ❑ Under Separate Cover via: 4 2/4/15 Shop Drawings ❑ Prints 1 Plans ❑ Other: Ef Copy of Letter ❑ Change Order ❑ Samples ❑ Total Quantity ❑ Reproducible ❑ Specification i - 'Sut�mittad�uantet`y�, Date��- DWG #� _ „ .,a Des'criptiom� 1 4 2/4/15 2015 Site Plan 1 4 2/4/15 i PCN Application 1 1 2/4/15 $240 Check made out to NCDENR ��Tliese;are� #ransmitted'a"s checked. below: For Approval ❑ Approved as Submitted ❑ ❑ For Your Use ❑ Approved as Noted ❑ • As Requested ❑ Returned for Corrections ❑ Resubmit copies for approval Submit [ #] copies for distribution Return [ #] corrected prints • For Review and Comment ❑ Revise and Resubmit /Work May Not Proceed ❑ FOR BIDS DUE: [Type text here] ❑ PRINTS RETURNED AFTER LOAN 'tornrnents: -Copy to: Josh Pelletier, USACOE i Si ure 01/30/2015 02:24PM 2529953825 DENNIS CARROLL PAGE 01/02 Charles & Peggy Moseley 407 -C Freemason Street Oriental, NC 28571 I, authorize Doug Dorman of Atlantic Environmental Consultants, LLC (AEC) to act on my behalf as my agent in the processing of applications and to furnish, upon request, supplemental information in support of the permit application. ' / AUTHORIZATION ' 6A 4, q ATE 01/30/2015 02:24PM 2529953625 DENNIS CARROLL PAGE 01/02 Charles & Peggy Moseley 407 -C Freemason Street Oriental, NC 28571 I, authorize Doug Donnas of Atlantic Environmental Consultants, LLC (AEC) to act on my behalf as my agent in the processing of applications and to furnish, upon request, supplemental information in support of the permit application. .w A ' AUTHORIZATICiN V1 ATE 01/30/2015 02:24PM 2529953825 DENNIS CARROLL PAGE 01/02 Charles & Peggy Moseley 407 -C Freemason Street Oriental, NC 28571 I, authorize Doug Dorman of Atlantic Environmental Consultants, LLC (AEC) to act on my behalf as my agent in the processing of applications and to furnish, upon request, supplemental information in support of the permit application. _ F0.3 M11 01 ' / AUTHORIZATICiN (wm ATE 01/30/2015 02:24PM 2529953825 DENNIS CARROLL PAGE 01/02 Charles & Peggy Moseley 407 -C Freemason Street Oriental, NC 28571 1, authorize Doug Dorman of Atlantic Environmental Consultants, LLC (AEC) to act on my behalf as my agent in the processing of applications and to furnish, upon request, supplemental information in support of the permit application. _ IN mu A 75V EfFff 01/30/2015 02:24PM 2529953825 DENNIS CARROLL PAGE 01/02 Charles & Peggy Moseley 407 -C Freemason Street Oriental, NC 28571 1, authorize Doug Dorman of Atlantic Environmental Consultants, LLC (AEC) to act on my behalf as my agent In the processing of applications and to furnish, upon request, supplemental information in support of the permit application. WA FAR.41,2141 AUTHO-RIZAT16N , 6/m 3v zv�� ATE m Ct GENERAL NOTES 1) THIS PLAT IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BY A FULL AND ACCURATE PRE SEARCH 2) DEED REFERENCE MADE TO DB - JJ5, PG - 4JJ DR - 1736, PG - 125 DARE COUNTY REGIS7RY 3) PROPERTY ZONED R2 -AH 4) FIRM ZONE -AE -/90' SUBJECT TO CHANGE BY F E M A 5) PIN jf 06959517021012 N/F FRANKLIN D BURROUGHS WINONA P BURROUGHS �\\Y O- slo\gGCLI \� v ; EXISTING BARN 1 � r� y� AL AL AL AL PAMLICO SOUND AIL. AL AL AL. Al, FER RY AL AL AkL AIL AL ILL AL AL JIL. AL PARCEL TWO 1.0462 ACRES AL AL .aL JL WETLAND LINE AL r-� PORCH PROPOSED 3 BDRM 7,792 SF HOUSE (UPLANDS) 56 ATLANTIC OCEAN LOCATION MAP NOT TO SCALE I I N/F IDONNIE A WILLIAMS, Jr SUSAN H. WILLIAMS I I I I I LEGEND I I �n PROPOSED FILL AREA (4,300 SF) m y�. Vr1 PROPOSED GRAVEL DRIVEWAY JL AL I y I k Ihk k X k IY z I I� r�i 4•�I � I "1 10,046 SF =,1 n ^ nl� PROPOSED WATER (WETLANDS) / Ir;�' ;.•I / & POWER LINES AL AL I CEMETERY AL JIL —N 71'13'NT / KOHLER DRIVE S R 1237 - 60' RIGHT OF WAY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - — i 1. I i I —1 0C G M 1 D I Z I � Z SURVEY INFORMATION PROVIDED BY I W M MEEKINS JR & ASS, INC 1 SITE PLAN CHARLES & PEGGY MOSELEY HATTERAS VILLAGE HATTERAS TOWNSHIP — DARE COUNTY — NORTH CAROLINA 30' 0' 60' 120' 180' ,4TLANT /C ENV11?0N1W-N1T4Z CONMZT,4 NT5 LLC GRAPHIC SCALE 1 "= 60' P.O. 901r ,3266, K /TTY H,491hf N.C. 27949 (252)291 -7707, e -mail dougdorma17&9e177borgmo17 com FILE 2015 DATE 2/4/15 REVISED m C GENERAL NOTES 1) THIS PLAT IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BY A FULL AND ACCURATE T77LE SEARCH 2) DEED REFERENCE MADE TO DB — 335, PG — 433 DB — 1736, PG — 125 DARE COUNTY REGISTRY 3) PROPERTY ZONED R2 —AH 4) FIRM ZONE -AE -/90' SUBJECT TO CHANGE BY F E M A 5) PIN j' 06959517021012 N/F FRANKLIN D BURROUGHS WINONA P BURROUGHS EXISTING 1 j BARN AIL IL JUL PAMLICO SOUND AILL AL AL AL AL ,k AL FER RY lilk Jllc A AL ALL JL IF` _Nti l Y 'KXXXX�6tu`� AL TE ATLANTIC OCEAN LOCATION MAP NOT TO SCALE I I N/F IDONNIE A WILLIAMS, Jr SUSAN H. WILLIAMS I I I I I LEGEND I PROPOSED FILL AREA (4,300 SF) m "r ' ., •� PROPOSED GRAVEL DRIVEWAY > I k I xx x Ir I I I IIIEL AL ^ 10,046 SF PROPOSED WATER (WETLANDS) Ilk I& CEMETERY / / AL IL PARCEL TWO 1.0462 ACRES _ -N 11'13'091 A, AL - AL AL WETLAND LINE iL KOHLER DRIVE ,IVY , - POFCH� 1*00 PROPOSED �> 3 BDRM 7,792 SF HOUSE �S (UPLANDS)yy- 56 --i Y�,'ti4��,•Y a 2S �� 0C IF` _Nti l Y 'KXXXX�6tu`� AL TE ATLANTIC OCEAN LOCATION MAP NOT TO SCALE I I N/F IDONNIE A WILLIAMS, Jr SUSAN H. WILLIAMS I I I I I LEGEND I PROPOSED FILL AREA (4,300 SF) m "r ' ., •� PROPOSED GRAVEL DRIVEWAY > I k I xx x Ir I I I AL JL AL 1 I I;yjyJrtl ^ 10,046 SF PROPOSED WATER (WETLANDS) &POWER LINES ,IIt< jlL AL yl CEMETERY / / AL A'- 80.69' _ -N 11'13'091 - - - - - KOHLER DRIVE , S R 1237 60' RIGHT OF WAY _ _ — — _- — — — — _ _ _ _ — — N --i 0C G M I D � Z i Z G7 I SURVEY INFORMATION PROVIDED BY I W M MEEKINS JR & ASS, INC 1 1 SITE PLAN CHARLES & PEGGY MOSELEY HATTERAS VILLAGE HATTERAS TOWNSHIP — DARE COUNTY — NORTH CAROLINA 30' o' so' 120' 180' ATL,017C ENtV /I?ONMENTAL CON5LTAN75, LLC GRAPHIC SCALE 1 "= 60' P.O, 90X . 266, K /TTY H,4{W, N.C. 27949 (252)261 -7707, e -ma// 1ougdo,-ma17@embargmc17 com FILE 2015 DATE 2/4/15 REVISED m C! GENERAL NOTES 1) THIS PLAT IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BY A FULL AND ACCURATE T77LE SEARCH 2) DEED REFERENCE MADE TO DS - 335, PG - 433 DB - 1736, PG - 125 DARE COUNTY REGISTRY 3) PROPERTY ZONED R2 -AH 4) FIRM ZONE -AE -/90' SUBJECT TO CHANGE BY F E M A 5) PIN ,¢' 06959517021012 N/F FRANKLIN D BURROUGHS WINONA P BURROUGHS \\ \Y RPµ, l i -� EXISTING BARN \ r� L� AL JL IL AL PAMLICO SOUND ilk ,III AL ,lye AL FER RY A AL AL L AIL AL .r ATLANTIC OCEAN LOCATION MAP NOT TO SCALE I N/F DONNIE A WILLIAMS, Jr I SUSAN H. WILLIAMS II I I �l I LEGEND I PROPOSED FILL AREA (4,300 SF) m_ •rr w., • - �,",,. PROPOSED GRAVEL DRIVEWAY � I x I r I I, N � I ,1 4L J. / IL IL 10,046 n .a � SF �/ PROPOSED WATER (WETLANDS) AIL JL PARCEL TWO AL CEMETERY / jL 1.0462 ACRES I&L AL AILL Ilk, - -N 11'13'09'E- WETLAND LINE AL 'L J1— — - - - - — — — — — — — — — - — — — — — — — — — - — — — KOHLER DRIVE R POCH; �a ^ PROPOSED 3 BDRM 7,792 SF HOUSE (UPLANDS) 56 -- _- .r ATLANTIC OCEAN LOCATION MAP NOT TO SCALE I N/F DONNIE A WILLIAMS, Jr I SUSAN H. WILLIAMS II I I �l I LEGEND I PROPOSED FILL AREA (4,300 SF) m_ •rr w., • - �,",,. PROPOSED GRAVEL DRIVEWAY � I x I r I I, N � I ,1 � • / 1 I' ; : h yl j,,;:',i4•I 10,046 n .a � SF �/ PROPOSED WATER (WETLANDS) &POWER LINES illy AL i AL CEMETERY / jL ' .IL 169' - -N 11'13'09'E- J1— — - - - - — — — — — — — — — - — — — — — — — — — - — — — KOHLER DRIVE S R 1237 — 60' RIGHT OF WAY i fTl \ � v I Z 'I � INFORMATION PROVIDED BY ISURVEY W M MEEKINS JR & ASS, iNC SITE PLAN CHARLES & PEGGY MOSELEY HATTERAS VILLAGE HATTERAS TOWNSHIP - DARE COUNTY - NORTH CAROLINA so' o' 60' 120' 180' ATLANT /C ENV /RON#Ll-NTAL CONSULTANTS, LLC GRAPHIC SCALE 1 "= 60' P.O. 901r ,3266, K /TTY 114WK, N.C. 27949 (252)261 -7707, e -moi/ dougdonmon®embargmai/.com FILE 2015 DATE 2/4/15 REVISED m JUL A4 X114 AL AL L I4 A4 AL 194 tl4 AkL GENERAL NOTES 1) 77415 PLAT IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BY A FULL AND ACCURATE 777LE SEARCH 2) DEED REFERENCE MADE TO DB — 335, PG — 433 DB — 1736, PG — 125 DARE COUNTY REGISTRY 3) PROPERTY ZONED R2 —AH 4) FIR M ZONE " AE " / 9 0' SUBJECT TO CHANGE BY F E M A 5) PIN j' 06959517021012 N/F FRANKLIN D BURROUGHS WINONA P BURROUGHS F \\YSwoM�tDWC��� \\ ,A \ \v- Y y 1�13ARNING 1 \ y� ALL ,L .i4 AIL AL AL AL AL Ak AL PARCEL TWO 1 0462 ACRES JL4 WET {AND LINE '�` 'k ,kL7 PORCH I-" PROPOSED 3 BDRM 7,792 SF HOUSE o� (UPLANDS) ® 56 PAMLICO SOUND ATLANTIC OCEAN LOCATION MAP NOT TO SCALE I I N/F IDONNIE A WILLIAMS, Jr SUSAN H WILLIAMS I �I I I I I LEGEND I PROPOSED RLL AREA (4,300 SF) PROPOSED GRAVEL DRIVEWAY _ I z I N 2 I '21 A AL IL ..; I 10,046 SF IYF' API / / do POWER LINES +114 ,L AL I / / ,114 ' ILL _ 80.69' - - - -- - - -- - - - - - -- ��' - -- - - - - - - DRIVE - - - - - - - - - - - -- - SR 1237 - 60'-RIGHT-OF WAY - _ - - - - - - I1 I � D D 1 1 Z Z 1 Z I s NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Ecosystem Enhancement Program Donald R van der Vaart Governor Secretary February 4, 2015 Charles and Peggy Moseley 407 -C Freemason St Oriental, NC 28571 Expiration of Acceptance: August 4, 2015 Project: Moseley Residence County: Dare The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below Please note that this decision does not assure that participation in the NCEEP will be approved by the permit issuing agencies as mitigation for project impacts It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including SL 2009 -337 An Act to Promote the Use of Compensatory Mitigation Banks as amended by S.L 2011 -343. This acceptance is valid for six months from the date of this letter and is not transferable If we have not received a copy of the issued 404 Permit/401 Certification /CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work The amount of the ln- Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www nceep net. Based on the information supplied by you in your request to use the NCEEP, the impacts that may require compensatory mitigation are summarized in the following table The amount of mitigation required and assigned to NCEEP for this impact is determined by permitting agencies and may exceed the impact amounts shown below Im act River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq Ft) Buffer Ii (Sq Ft ) Cold Cool Warn Riparian Non- Riparian Coastal Marsh Tar - Pamlico 03020105 0 0 0 0 020 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation The mitigation will be performed in accordance with the N.0 Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010 Thank you for your interest in the NCEEP If you have any questions or need additional information, please contact Kelly Williams at (919) 707 -8915 Sincerely, Jame Stanfill Asset Management Supervisor cc Kyle Barnes, USACE- Washmgton Doug Dorman, agent 1652 IUa l Service Center, Raleigh North Carolina 27699 -1652 Phone 919- 707 -6976 k Internet www nceep net An Eq -ia; pportdn;:y +Affirmative jcuon Employer— Made in part `•om recycled paper NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Charles and Peggy Moseley 407 -C Freemason St Oriental, NC 28571 Project: Moseley Residence Ecosystem Enhancement Program Donald R van der Vaart Secretary February 4, 2015 Expiration of Acceptance: August 4, 2015 County: Dare The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below Please note that this decision does not assure that participation in the NCEEP will be approved by the permit issuing agencies as mitigation for project impacts It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including SL 2009 -337 An Act to Promote the Use of Compensatory Mitigation Banks as amended by S L 2011 -343 This acceptance is valid for six months from the date of this letter and is not transferable If we have not received a copy of the issued 404 Permit/401 Certification /CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work The amount of the In- Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep net Based on the information supplied by you in your request to use the NCEEP, the impacts that may require compensatory mitigation are summarized in the following table The amount of mitigation required and assigned to NCEEP for this impact is determined by pe itting agencies and may exceed the impact amounts shown below 1m act River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq Ft) Buffer ii (Sq Ft ) Cold Cool Warm Riparian Non- Riparian Coastal Marsh Tar- Pamlico 03020105 0 0 0 0 1 020 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation The mitigation will be performed in accordance with the N C Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010 Thank you for your interest in the NCEEP If you have any questions or need additional information, please contact Kelly Williams at (919) 707 -8915 Sincerely, Jame Stanfill Asset Management Supervisor cc. Kyle Barnes, USACE- Washington Doug Dorman, agent 1652 Mad Service Center, Ra,eigh North Carolina 27699 -1652 Phone 919 -707 -89761 Internet www,nceep net An Equal Opport,mt,y +Affirmative At Employer — Made in part �om ecycled paper #VAs NR North Carolina Department of Environment and Natural Resources Pat McCrory Ecosystem Enhancement Program Donald R van der Vaart Governor Secretary February 4, 2015 Charles and Peggy Moseley 407 -C Freemason St. Oriental, NC 28571 Expiration of Acceptance: August 4, 2015 Project: Moseley Residence County: Dare The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below Please note that this decision does not assure that panccipation in the NCEEP will be approved by the permit issuing agencies as mitigation for project impacts It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved You must also comply with all other state, federal or local goveinmentpermits regulations or authorizations associated with the proposed activity including SL 2009 -337 An Act to Promote the Use of Compensatory Mitigation Banks as amended by S.L 2011 -343 This acceptance is valid for six months from the date of this letter and is not transferable If we have not received a copy of the issued 404 Permit/401 Certification /CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work The amount of the ln- Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you in your request to use the NCEEP, the impacts that may require compensatory mitigation are summarized in the following table. The amount of mitigation reqwred and assigned to NCEEP for this impact is determined by permitting agencies and may exceed the impact amounts shown below Im act River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq Ft) Buffer II {Sq Ft ) Cold Cool I Warm Riparian Non - Riparian Coastal Marsh Tar - Pamlico 03020105 0 0 0 0 020 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation The mitigation will be performed in accordance with the N.0 Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010 Thank you for your interest in the NCEEP If you have any questions or need additional information, please contact Kelly Williams at (919) 707 -8915 Sincerely, Jame Stanfill Asset Management Supervisor cc Kyle Barnes, USACE- Washington Doug Dorman, agent 1652 Mal Service Center, Ra eigh North Carolina 27699 -1652 Phone 919- 707 -89761 Internet www nceep net An Equai Opportdmty t Affirmative Act on Employer — Made it part `,om ecycled paper #.7A NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Ecosystem Enhancement Program Donald R van der Vaart Governor Secretary February 4, 2015 Charles and Peggy Moseley 407 -C Freemason St Oriental, NC 28571 Expiration of Acceptance: August 4, 2015 Project: Moseley Residence County: Dare The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below Please note that this decision does not assure that participation in the NCEEP will be approved by the permit issuing agencies as mitigation for project impacts It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved You must also comply with all other state, federal or local government permits regulations or authorizations associated with the proposed activity including SL 2009 -337. An Act to Promote the Use of Compensatory Mitigation Banks as amended by S L 2011 -343. This acceptance is valid for six months from the date of this letter and is not transferable If we have not received a copy of the issued 404 Permit/401 Certification /CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP, Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work The amount of the In- Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep net Based on the information supplied by you in your request to use the NCEEP, the impacts that may require compensatory mitigation are summarized in the following table The amount of mitigation required and assigned to NCEEP for this impact is determined by pe itting agencies and may exceed the impact amounts shown below. Impact River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq Ft) Buffer i i (Sq Ft ) Cold Cool Warm Riparian Non - Riparian Coastal Marsh Tar - Pamlico 03020105 0 0 0 0 020 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation The mitigation will be performed in accordance with the N C Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010 Thank you for your interest in the NCEEP If you have any questions or need additional information, please contact Kelly Williams at (919) 707 -8915 Sincerely, Jame Stanfill Asset Management Supervisor cc Kyle Barnes, USACE - Washington Doug Dorman, agent 1652 Mail Service Center, Raleigh North Carolina 27699 -1652 Phone 919 - 707 -89761 Internet www nceep net An Equal vpport,inity %Affirmative Action Employer — Made in part f om,ecycled paper `^ I 4 ..roams r! � iM ` 1 ( - S , 2 0 1 5 0 1 6 4 Office Use Only Corps �Qtaon n _ DWQ p,8Ject no Form Vernon 1 ec 10 2008 Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version Pre - Construction Notification PC Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 18 or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corpse ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ® Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a Name of project Moseley Property 2b County Dare 2c Nearest municipality / town Hatteras 2d Subdivision name None 2e NCDOT only, T I P or state project no N/A 3. Owner Information 3a Name(s) on Recorded Deed Charles & Peggy Moseley 3b Deed Book and Page No 1736/0125 3c Responsible Party (for LLC if applicable) none FEB 0 9 3d Street address _201S 407 -C Freemason Street 3e City, state, zip Oriental, NC 28571 401 & B1 FER RESOURCES 3f Telephone no 3g Fax no N/A 3h Email address Peggydmoseley @yahoo com Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant is ® Agent ❑ Other, specify 4b Name 4c. Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5. Agent/Consultant Information (if applicable) 5a Name Doug Dorman 5b Business name (if applicable) Atlantic Environmental Consultants, LLC 5c Street address PO Box 3266 5d City, state, zip Kitty Hawk, NC 27949 5e Telephone no 252 - 261 -7707 5f Fax no 252- 261 -7707 5g Email address dougdorman @embargmail com Page 2 of 11 PCN Form — Version 1 3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) 959517021012 lb Site coordinates (in decimal degrees). Latitude 35 221830 Longitude - 75 68451 (DD DDDDDD) ( -DD DDDDDD) 1c Property size 1 046 acres 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Pamlico Sound proposed project 2b Water Quality Classification of nearest receiving water SA 2c River basin Pamlico Sound 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Undeveloped single family lot Property located in developed residential area of Hatteras Village 3b List the total estimated acreage of all existing wetlands on the property 0 86 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property None 3d Explain the purpose of the proposed project A home is to be constructed on the vacant lot and some wetlands need to provide setbacks to septic system 3e Describe the overall project in detail, including the type of equipment to be used Project includes Fill in one (1) area of Section 404 wetlands (0 10 ac) Equipment utilized for this project to include an excavator or backhoe, a dump truck will bring in fill material During construction silt fence will be placed at the wetland interface to prevent intrusion of fill material into wetlands not permitted for fill 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments Meeting with Corp 2/18/15 4b If the Corps made the jurisdictional determination, what type ❑ preliminary ❑ Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Atlantic Environmental Consultants, LLC Name (if known) Doug Dorman Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Kyle Barnes - Metttng set to confirm on 2/18/15 5. Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 4 of 11 PCN Form — Version 1 3 December 10, 2008 Version C Proposed Impacts Inventory 1 Impacts Summary 1 a Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of Jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ®P ❑ T 404 wetland fill Scrub shrub Yes ® No ® Corps ® DWQ 010 W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0 035 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 5 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments S. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 511 Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. ❑ Neuse ❑Tar- Pamlico F] Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? ❑Yes B1 ❑P ❑T ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 PCN Form —Version 1 3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Due to the limited area of uplands on the lot it is difficult to avoid any impacts to the wetlands. The septic system has been placed as far away from the wetlands as possible and a bed septic system will be used which reduce the size of the drainfield by 50% 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The adjacant property owners are allowing the Moseley's to use there existing driveway and construct a driveway extension through there property to further avoid additional impacts to the wetlands Constructing a bed septic system will reduce the size of the dramfield by 50% 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ® Yes ❑ No 2b If yes, mitigation is required by (check all that apply). ® DWQ ® Corps 2c If yes, which mitigation option will be used for this projects ❑ Mitigation bank ®Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ® Yes 4b. Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested 0 20 acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 8 of 11 PCN Form — Version 1 3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 5% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Exisitng residential lot Stormwater rules do not apply 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Dare County ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ® Other County Standards 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the El Yes ® No use of public (federal /state) land? 1 b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Ripanan Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Bed wastewater system Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Contacted a Biologist with the USFWS Field office 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? The wetland area would not support Essential Fish Habitat 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Contacted Lee Abbott, Assistant State Archeologist for a determation 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ® Yes ❑ No 8b If yes, explain how project meets FEMA requirements Construction be elevated above designated flood plain requirements for this location and approved by local municapalities prior to construction 8c What source(s) did you use to make the floodplain determination? Dare County flooplain maps Doug Dorman 2/4/15 Applicant/Agent's Printed Name Date icant/Acient's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided } Page 11 of 11 PCN Form — Version 1 3 December 10, 2008 Version