HomeMy WebLinkAboutSWA000179_Supplement-EZ Form_20230103SUPPLEMENT-EZ COVER PAGE
ORMS LOADI
PROJECT INFORMATION
1 Project Name
Youngsville Academy
2 Project Area ac
13.55
3 Coastal Wetland Area ac
0
4 Surface Water Area ac
0
5
Is this project High or Low Density?
High
6
Does this protect use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
6'
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
1 Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration S stem
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
113ayfilter
IFilterra
25
26
FORMS LOADED
DESIGNER CERTIFICATION
27 IName and Title:
Street address:
City, State, Zip:
Phone number(
Email:
Jim Roth, PE
Cole & Associates
2701 E Camelback Rd
Phoenix, AZ 85016
602-795-4111 Ext 1401
iroth(a)colestl.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided
here-
1
`.`���� •C A R0���'%
• SEAL
038197
,''9� 1111111►�0 ``\`
12/05/2022
Seal
Signature of Designer
Date
12/5/2022
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this roject have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft
798890
638,590
6
Onsite drainage area (sq ft
798890
738,590
7
Offsite drainage area (sq ft
0
0
8
Total BUA in project (sq ft)
190287 sf
190287 sf
9
New BUA on subdivided lots (subject to
ermitting) (sq ft
sf
10permitting)
New BUA not on subdivided lots (subject to
s
190287 sf
190287 sf
11
Offsite BUA (sq ft
sf
12
Breakdown of new BUA not on subdivided lots:
194713.2
194713.2
- Parking (sq ft
36700 sf
36700 sf
- Sidewalk (sq ft
10500 sf
10500 sf
- Roof (sq ft
25000 sf
25000 sf
- Roadway s ft
118087 sf
118087 sf
- Future (sq ft
sf
- Other, please specify in the comment box
below (sq ft)
sf
13
New infiltrating permeable pavement on
Isubdivided lots (sq ft
sf
14
New infiltrating permeable pavement not on
subdivided lots (sq ft)
sf
15permitting)
Existing BUA that will remain (not subject to
s ft
sf
16
Existing BUA that is already permitted (sq ft
sf
17
Existing BUA that will be removed (sq ft
sf
18
IlPercent BUA
24%
24%
19
IDesign storm inches
2.9 in
2.9 in
20
IDesign volume of SCM cu ft
27302 cf
27302 cf
21
lCalculation method for design volume
SCS
SCS
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
� J
WET POND
Drainage area number
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
HRT
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
419.50
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
420.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
424.90
23
Elevation of the permanent pool (fmsl)
424.90
24
Elevation of the top of the vegetated shelf (fmsl)
426.00
25
Elevation of the temporary pool (fmsl)
427.94
26
Surface area of the main permanent pool (square feet)
11977
27
Volume of the main permanent pool (cubic feet)
41736 cf
28
Average depth ofthe main pool (feet)
3.48'
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
8354 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
29 in
35
Design volume of SCM (cu ft)
22751 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
3 in
38
If weir, weir height (inches)
39
Ifweir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.65
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
41 in
44
Depth of forebay at exit (inches)
35 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
No
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Bermuda
54
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 3 5:39 PM 12/6/2022