HomeMy WebLinkAboutSW6211207_Email_20230103DeBerry, Margie
From: DeBerry, Margie
Sent: Tuesday, January 3, 2023 2:09 PM
To: Scott Brown; jamal@jandkbuilders.com; dan@jandkbuilders.com
Cc: Lawyer, Mike; Farkas, Jim J
Subject: RE: Faircloth Gas Station; Intersection of US 401 & Johnson Mill Road near Raeford
Good afternoon,
The Division of Energy, Mineral and Land Resources received and accepted a State Stormwater Management Permit
Application for the subject project on December 29, 2021 and requested additional information on February 28, 2022. A
review of the file and delivery logs indicates that, as of this date, the information requested on February 28, 2022 has
not been received in this Office within the stipulated timeframe. Per the requirements of Title 15A NCAC 02H
.1042(3)(a)(ii) of the Stormwater Management Rules, this Office is hereby returning the subject application as
incomplete. The $505.00 application fee has been forfeited and a new fee will need to be provided if you choose to
resubmit this application in the future.
The original signed letter is being mailed to the Applicant, Mubarak Shahbain, at:
Mubarak Shahbain
Johnson Mill Shops, LLC
645 Laurinburg Highway
Raeford, NC 28376
Thank you,
Margie DeBerry
Environmental Specialist, Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9209
margie.deberrv@ncdenr.gov
D- E
NORTH CAROLINA
Department of Environmenlal Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: DeBerry, Margie
Sent: Thursday, December 15, 2022 2:05 PM
To: Scott Brown <sbrown@4dsitesolutions.com>; jamal@jandkbuilders.com; dan@jandkbuilders.com
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Subject: RE: Faircloth Gas Station; Intersection of US 401 & Johnson Mill Road near Raeford
Good afternoon,
The requested information for the subject project is past due. Please provide a status update (with anticipated
resubmission date) or the requested information, no later than close of business on 12/23/2022, otherwise we will need
to close out the project due to inactivity.
Thank you,
Margie DeBerry
Environmental Specialist, Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9209
margie.deberrv@ncdenr.gov
�D- E
NORTH CAROLINA :.� Q
(Department of Environmenial Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Monday, February 28, 2022 3:28 PM
To: Scott Brown <sbrown@4dsitesolutions.com>; iamal@iandkbuilders.com; dan@iandkbuilders.com
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: RE: Faircloth Gas Station; Intersection of US 401 & Johnson Mill Road near Raeford
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
for the subject project on December 29t", 2021. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free
to contact me. My contact information is listed below.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources — Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkasgncdenr.gov
" D E
Oyi7 W [ � �MiYYM�I 8rw�
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Wednesday, December 29, 2021 12:31 PM
To: Scott Brown <sbrown@4dsitesolutions.com>; iamal@iandkbuilders.com; dan@iandkbuilders.com
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: RE: Faircloth Gas Station; Intersection of US 401 & Johnson Mill Road near Raeford
Good Afternoon,
We received your post -construction stormwater permit application for the above mentioned project on 12/29/2021.
Reviews under the standard permitting process generally take 30 — 45 calendar days, but can take up to 90 calendar
days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review will probably be closer to
45 days than 30). Please upload all documents that you mailed into our office through the link provided below. Be sure
to choose the Central Office as the Primary Contact office.
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the "Add Another Post -Construction File Upload" link directly below the
"State Stormwater Information Uploads" section of the form. Please do not upload entire plan sets through this form,
but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures
that the files are properly named in the electronic repository and it helps expedite the review process.
Please type in permit #: SW6211207
If you have any questions, please contact Jim Farkas Jim. Farkas@ncdenr.gov 919-707-3646.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources — Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkaskncdenr.gov
- -Ox Q � E
CAFh
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Monday, December 13, 2021 1:01 PM
To: Scott Brown <sbrown@4dsitesolutions.com>; iamal@iandkbuilders.com; dan@iandkbuilders.com
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: Faircloth Gas Station; Intersection of US 401 & Johnson Mill Road near Raeford
Good Afternoon,
We received your application for a new post -construction stormwater permit on 12/13/2021. At this time, the
submission is not administratively complete and cannot be accepted for review in its current condition. Please provide
the following submittal items within 30 calendar days (by close of business on 1/12/2021) so that we may accept the
project and begin the review process, otherwise, the project will be returned as administratively incomplete.
2x hard copies of a full-sized plan sheet showing the following (NOTE: Only updated plan sheets need to be
provided, we do not require brand new sets of plans):
o Drainage area map for the proposed wet pond. This item is required per Section VI, 8o of the Application
and 15A NCAC 02H .1042(2)(g)(iv).
o Wetland delineation or a note on the plans stating that there are no wetlands located on -site. This item
is required per Section VI, 8m of the Application and 15A NCAC 02H .1042(2)(g)(iii).
o Cross-section of the proposed wet pond showing the forebay of the wet pond (It is noted that there is a
cross-section of the wet pond on plan sheet C-5.3 however this cross-section does not include the
forebay). This item is required per Section VI, 81 of the Application and 15A NCAC 02H .1042(2)(h).
NOTE: This is an administrative completeness review, not a detailed engineering review. The following items were noted
during this review, but do not need to be addressed for this submission to be administratively complete and accepted
for review (but these issues, and possibly others, will probably be brough up during the engineering review):
- The drainage area to the proposed wet pond (257,003 sf) is larger than the project area (5.0 ac) which implies
that part of the drainage area to the proposed wet pond will be off -site drainage area. Please ensure that this
off -site drainage area is shown in Section IV, 10 of the Application and in the Supplement-EZ Form.
- Any off -site portions of the drainage area to the proposed wet pond that are not bypassed must be accounted
for at their full build -out potential (typically 100% BUA) per 15A NCAC 02H .1003(3)(b).
If these items are received within the stipulated timeframe, we can accept the project and begin the review process.
Once accepted, reviews under the standard permitting process generally take 30 — 45 calendar days, but can take up to
90 calendar days per statute (one of our two reviewer positions is currently vacant so this review will probably be closer
to 45 days than 30).
Hard copies should be mailed to the following address:
For Fed Ex/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
If you have any questions, please contact Jim Farkas Jim. Farkas@ncdenr.gov 919-707-3646.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources — Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkasgncdenr.gov
e::ew- —Ox D; � E
W ri7iY[ � bwY M��IYI 6r1�T��
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.