Loading...
HomeMy WebLinkAbout20221192 Ver 1_2022-02049 NWP 29 and 18 Tearsheet_20221227 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-02049 County: Lee U.S.G.S. Quad: NC-Sanford GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Forge Investment Group Attn: Mark Lyczkowski Address: 709 Croswell Court Whitsett, NC 27377 Size (acres) ~33.61 Nearest Town Sanford Nearest Waterway UT to Persimmon Creek River Basin Cape Fear USGS HUC 03030003 Coordinates 35.468531, -79.220755 Location description: The project area is located in the southeastern quadrant of the intersection of NC Highway 42 and South Franklin Drive, at 125 South Franklin Drive in Sanford, Lee County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 0.19 acre of riparian non-riverine wetlands (0.008 acre of which are for stormwater management facilities), and the temporary discharge of fill material into 0.026 acre of riparian non-riverine wetlands, necessary to construct access and infrastructure for the Wicker Farm multi-family residential development. Applicable Law(s): ܈Section 404 (Clean Water Act, 33 USC 1344) ܆Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 29. Residential Developments / NWP 18. Minor Discharges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 9/1/2022, additional information submitted via email on 11/18/2022, and the enclosed plans “Wicker Farm” Sheet Nos. CWI-0.0, CWI-1.0, CWI-2.0, CWI-2.01, CWI-2.1, CWI-2.2, CWI-2.3, CWI-2.4, CWI- 2.5, CWI-2.6, CWI-2.7, CWI-2.8, and CWI-2.9 dated 11/14/2022. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 817-2436 or David.E.Bailey2@usace.army.mil. Corps Regulatory Official: _____________________________________________________Date: 12/27/2022 Expiration Date of Verification: 3/14/2026 Date: 2022.12.27 12:14:06 -05'00' SAW-2022-02049 SPECIAL CONDITIONS 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. 2. No discharges of dredged or fill material are authorized by this permit verification for the purposes of installation of utility lines, including sewer. Stream impacts for the sewer line crossing of Stream M must be avoided through the use of trenchless techniques such as jack and bore, as shown on Sheet No. CWI-2.4, CWI-2.5, and CWI-2.6 of the enclosed plans. 3. Groundwater base flow below the authorized impact limits at Impact 1 must be maintained per the “Filter Diaphragm Detail” as shown on Sheet No. CWI-2.9 of the enclosed plans. 4. Surface water flow below the authorized impact limits at Impacts 1, 2A, and 2B must be maintained per culvert outlets as shown on Sheet Nos. CWI-2.1 and CWI-2.2 of the enclosed plans. 5. All authorized temporary wetland impacts, as shown on Sheet Nos. CWI-2.1, CWI-2.2, and CWI- 2.3 of the enclosed plans, must be restored to original grade and contour and stabilized with regionally appropriate native wetland seed mix and natural fiber matting. 6. Please note that the Wicker Farm residential development is considered cumulative with all current and future phases of the of this development with respect to compensatory mitigation and Nationwide Permit thresholds. As such, impacts permitted for this project (SAW-2022-02049) are considered cumulative with impacts proposed for any future phases. Current cumulative impacts to waters of the US for the Wicker Farm single and complete project include a total loss of 0.019 acre of wetlands (0.008 acre of which are for stormwater management facilities), or a total loss of waters of the US of 0.019 acre. Corps Regulatory Official: ______________ ______ ______ Date: 12/27/2022 Expiration Date of Verification: 3/14/2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Copy furnished electronically: Kate Hefner, Timmons Group, kate.hefner@timmons.com Zachary Thomas, NCDEQ-NCDWR, zachary.thomas@ncdenr.gov Date: 2022.12.27 12:13:49 -05'00' U.S.ARMYCORPSOFENGINEERS WilmingtonDistrict Page 1 of 2 Form Version 10 June 2020_updated CompensatoryMitigationResponsibilityTransferForm  Permittee:ForgeInvestmentGroup,Attn:MarkLyczkowski ActionID:SAWͲ2022Ͳ02049 ProjectName:WickerFarm/125SouthFranklinDrive/Sanford/residentialCounty:Lee  InstructionstoPermittee:ThePermitteemustprovideacopyofthisformtotheMitigationSponsor,eitheranapproved MitigationBankortheNorthCarolinaDivisionofMitigationServices(NCDMS),whowillthensigntheformtoverifythe transferofthemitigationresponsibility.OncetheSponsorhassignedthisform,itisthePermittee’sresponsibilitytoensure thatWilmingtonDistrictProjectManageridentifiedonpagetwoisinreceiptofasignedcopyofthisformbeforeconducting authorizedimpacts,unlessotherwisespecifiedbelow.IfmorethanoneMitigationSponsorwillbeusedtoprovidethe mitigationassociatedwiththepermit,oriftheimpactsand/orthemitigationwilloccurinmorethanone8ͲdigitHydrologic UnitCode(HUC),multipleformswillbeattachedtothepermit,andtheseparateformsforeachSponsorand/orHUCmust beprovidedtotheappropriateMitigationSponsors.  InstructionstoSponsor:TheSponsorverifiesthatthemitigationrequirements(credits)shownbelowhavebeenreleased andareavailableattheidentifiedsite.Bysigningbelow,theSponsorisacceptingfullresponsibilityfortheidentified mitigation,regardlessofwhethertheyhavereceivedpaymentfromthePermittee.Oncetheformissigned,theSponsor mustupdatethebankledgerandprovideacopyofthesignedformandtheupdatedledgertothePermittee,theProject Managerwhoissuedthepermit,theBankProjectManager,andtheDistrictMitigationOffice(seecontactinformationon page2).TheSponsormustalsocomplywithallreportingrequirementsestablishedintheirauthorizinginstrument.  PermittedImpactsandCompensatoryMitigationRequirements:  PermittedImpactsRequiringMitigation*8ͲdigitHUCandBasin:03030003,CapeFearRiverBasin StreamImpacts(linearfeet)WetlandImpacts(acres) WarmCoolColdRiparianRiverineRiparianNonͲRiverineNonͲRiparianCoastal  0.19 *Ifmorethanonemitigationsponsorwillbeusedforthepermit,onlyincludeimpactstobemitigatedbythissponsor.  CompensatoryMitigationRequirements:8ͲdigitHUCandBasin:03030003,CapeFearRiverBasin StreamMitigation(credits)WetlandMitigation(credits) WarmCoolColdRiparianRiverineRiparianNonͲRiverineNonͲRiparianCoastal 0.38  MitigationSiteDebited:NCDMS (Listthenameofthebanktobedebited.Forumbrellabanks,alsolistthespecificsite.ForNCDMS,listNCDMS.IftheNCDMS acceptanceletteridentifiesaspecificsite,alsolistthespecificsitetobedebited).  SectiontobecompletedbytheMitigationSponsor  StatementofMitigationLiabilityAcceptance:I,theundersigned,verifythatIamauthorizedtoapprovemitigation transactionsfortheMitigationSponsorshownbelow,andIcertifythattheSponsoragreestoacceptfullresponsibilityfor providingthemitigationidentifiedinthisdocument(seethetableabove),associatedwiththeUSACEPermitteeandAction IDnumbershown.Ialsoverifythatreleasedcredits(and/oradvancecreditsforNCDMS),asapprovedbytheWilmington District,arecurrentlyavailableatthemitigationsiteidentifiedabove.Further,IunderstandthatiftheSponsorfailstoprovide therequiredcompensatorymitigation,theUSACEWilmingtonDistrictEngineermaypursuemeasuresagainsttheSponsorto ensurecomplianceassociatedwiththemitigationrequirements.  MitigationSponsorName:  NameofSponsor’sAuthorizedRepresentative:   SignatureofSponsor’sAuthorizedRepresentativeDateofSignature  CESAW-RG (File Number, SAW-2022-02049) ConditionsforTransferofCompensatoryMitigationCredit: • OncethisdocumenthasbeensignedbytheMitigationSponsorandtheDistrictisinreceiptofthesignedform,the Permitteeisnolongerresponsibleforprovidingthemitigationidentifiedinthisform,thoughthePermitteeremains responsibleforanyothermitigationrequirementsstatedinthepermitconditions. • Constructionwithinjurisdictionalareasauthorizedbythepermitidentifiedonpageoneofthisformcanbeginonlyafter theDistrictisinreceiptofacopyofthisdocumentsignedbytheSponsor,confirmingthattheSponsorhasaccepted responsibilityforprovidingthemitigationrequirementslistedherein.WhenNCDMSprovidesmitigationforauthorized impactsconductedbytheNorthCarolinaDepartmentofTransportation(NCDOT),constructionwithinjurisdictionalareas mayproceeduponpermitissuance;however,acopyofthisformsignedbyNCDMSmustbeprovidedtotheDistrict within30daysofpermitissuance.NCDOTremainsfullyresponsibleforthemitigationuntiltheDistricthasreceivedthis form,confirmingthattheSponsorhasacceptedresponsibilityforprovidingthemitigationrequirementslistedherein. • SignedcopiesofthisdocumentmustberetainedbythePermittee,MitigationSponsor,andintheUSACEadministrative recordsforboththepermitandtheBank/ILFInstrument.ItisthePermittee’sresponsibilitytoensurethattheDistrict ProjectManager(addressbelow)isprovidedwithasignedcopyofthisform. • Ifchangesareproposedtothetype,amount,orlocationofmitigationafterthisformhasbeensignedandreturnedto theDistrict,theSponsormustobtaincaseͲbyͲcaseapprovalfromtheDistrictProjectManagerand/orNorthCarolina InteragencyReviewTeam(NCIRT).Ifapproved,highermitigationratiosmaybeapplied,aspercurrentDistrictguidance andanewversionofthisformmustbecompletedandincludedintheDistrictadministrativerecordsforboththepermit andtheBank/ILFInstrument.  Comments/AdditionalConditions:AletterfromNCDMS,confirmingtheyarewillingandabletoaccepttheapplicant’s compensatorymitigationresponsibility,dated11/15/2022wasincludedwiththepreconstructionnotification.  ThisformisnotvalidunlesssignedbelowbytheDistrictProjectManagerandbytheMitigationSponsoronPage1.Once signed,theSponsorshouldprovidecopiesofthisformalongwithanupdatedbankledgerto:1)thePermittee,2)the DistrictProjectManagerattheaddressbelow,3)theBankManagerlistedinRIBITS,and4)theWilmingtonDistrict MitigationOffice,3331HeritageTradeDrive,Suite105,WakeForest,NC27587(orbyemailtoSAWMIT@usace.army.mil). QuestionsregardingthisformoranyofthepermitconditionsmaybedirectedtotheDistrictMitigationOffice.  USACEProjectManager:DavidE.Bailey USACEFieldOffice:RaleighRegulatoryOffice USArmyCorpsofEngineers 3331HeritageTradeDrive,Suite105 WakeForest,NorthCarolina27587 Email:David.E.Bailey2@usace.army.mil    12/27/2022 USACEProjectManagerSignatureDateofSignature  CurrentWilmingtonDistrictmitigationguidance,includinginformationonmitigationratios,functionalassessments,and mitigationbanklocationandavailability,andcreditclassifications(includingstreamtemperatureandwetlandgroupings)is availableathttp://ribits.usace.army.mil. Date: 2022.12.27 12:13:34 -05'00' JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ VICINITY MAP1" = 500' ENVIRONMENTAL IMPACTS SOUTH FRANKLIN DRIVE, SANFORD, LEE COUNTY, NORTH CAROLINA WICKER FARM CWI-0.0 CO V E R S H E E T 1" = 500' ENVIRONMENTAL IMPACTS SITE SO U T H F R A N K L I N D R HW Y 4 2 NO R T H F R A N K L I N D R WE S T E R N H I L L S D R Sheet List Table Sheet Number Sheet Title CWI-0.0 COVER SHEET CWI-1.0 EXISTING CONDITIONS CWI-2.0 OVERALL ENVIRONMENTAL IMPACTS CWI-2.01 ENVIRONMENTAL IMPACT TABLE CWI-2.1 ENVIRONMENTAL IMPACT 1 CWI-2.2 ENVIRONMENTAL IMPACT 2 CWI-2.3 ENVIRONMENTAL IMPACT 3 CWI-2.4 OFFSITE SEWER PLAN AND PROFILE (1 OF 2) CWI-2.5 OFFSITE SEWER PLAN AND PROFILE (2 OF 2) CWI-2.6 JACK AND BORE STREAM CROSSING PLAN AND PROFILE CWI-2.7 WETLAND B HYDROLOGIC INFORMATION CWI-2.8 WETLAND K HYDROLOGIC INFORMATION CWI-2.9 NOTES AND DETAILS 408.92 IE B 15" CPP408.92 IE E 15" CPP 407.07IE B 18" RCP 406.94 IE E 18" RCP 404.54 IE B 15" RCP 404.21IE E 15" RCP 400.93IE B 18" RCP 398.13 IE E 18" RCP 397.43 IE B 18" INV RCP 396.13IE E 18" INV RCP X X X X X X X T T 60037396.64FH C T W S S UF O UG T W W W W W W W W W W W JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ SITE DATA TOTAL AREA: 33.61 AC (1,462,876 SF) TOTAL WETLANDS: 2.02 AC (87,933 SF) TOTAL STREAMS: 790 LF TOTAL OPEN WATER: 2.53 AC (110,394 SF) 0 SCALE 1"=300' 600'300' NA D 8 3 NOTES: 1. BOUNDARY TAKEN FROM SURVEY BY TIMMONS GROUP DATED JANUARY 29, 2021. 2. TOPOGRAPHIC INFORMATION TAKEN FROM LEE COUNTY GIS AND TOPOGRAPHIC SURVEY BY TIMMONS GROUP DATE JANUARY 21, 2021. 3. THIS SUBJECT PROPERTY LIES IN ZONE 3200, PER FIRM MAP 3710 PANEL 9632J. EFFECTIVE DATE SEPTEMBER 6, 2006. 4. ENVIRONMENTAL INFORMATION TAKEN BY TIMMONS GROUP DATED JANUARY 22, 2021. EXISTING WETLAND EXISTING STREAM EXISTING STREAM EXISTING STRUCTURE TO BE REMOVED EXISTING GRAVEL ROAD TO BE REMOVED EXISTING FENCE TO BE REMOVED EXISTING OVERHEAD UTILITY TO BE REMOVED EXISTING STRUCTURE TO BE REMOVED SITE BOUNDARY SITE BOUNDARY EXISTING POND CWI-1.0 EX I S T I N G C O N D I T I O N S 1" = 300' LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM X X X X X X T T 60037396.64FH C T S S UF O UG T W W W S S S S S S S S S S S S S S S S S S S S S S S S S S D S S S S JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ 0 SCALE 1"=300' 600'300' NA D 8 3 CWI-2.0 OV E R A L L E N V I R O N M E N T A L I M P A C T S 1" = 300' CWI-2.1 CWI-2.2 CWI-2.3PERMANENT WETLAND - GREEN TEMPORARY WETLAND - MAGENTA IMPACT LEGEND JACK AND BORE STREAM CROSSING APPROX. 84 LF 16" STEEL ENCASEMENT PIPE ASTM A139, GRADE B LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ CWI-2.01 EN V I R O N M E N T A L I M P A C T T A B L E NTS ROA D C (50' P U B L I C R / W , 2 7 ' B - B ) SAN S S SAN FES 400 385 390 HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 IMPACT 1 WALL CROSS SECTION PROFILE 370 375 380 385 390 395 400 370 375 380 385 390 395 400 162 LF 24" RCP @ 0.77% 3 8 0 . 0 3 7 9 . 4 3 8 0 . 7 3 8 2 . 3 3 8 0 . 5 3 8 0 . 6 3 8 2 . 1 38 0 . 7 2 38 4 . 5 1 38 8 . 7 3 39 1 . 4 3 38 9 . 8 4 38 7 . 1 5 9+50 10+00 11+00 12+00 13+00 13+50 TOP OF RETAINING WALL EXISTING GRADE HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 IMPACT 1 OUTFALL PROFILE 370 375 380 385 390 395 370 375 380 385 390 395 3 7 8 . 9 3 8 0 . 3 3 8 2 . 2 3 8 4 . 0 3 8 7 . 1 38 9 . 3 8 38 9 . 8 9 38 8 . 0 9 9+50 10+00 11+00 12+00 13+00 PROPOSED GRADE DI 401B TOP 387.69 INV IN 382.90 (FR DI 403) INV IN 382.90 (FR DI 402) INV OUT 382.40 (TO DI 401A) 98 LF 24" RCP @ 0.50% 25" DI 401A TOP 389.83 INV IN 381.91 FR (DI 401B) INV OUT 380.92 TO (FES 400) 64 LF 24" RCP @ 0.76% 4" JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ SCALE 1"=50' 100'50'0 NA D 8 3 CWI-2.1 EN V I R O N M E N T A L I M P A C T 1 PERMANENT WETLAND IMPACT 1 FOR ROAD FILL 7,670 SF, 0.176 AC TEMPORARY WETLAND IMPACT 1 FOR 5' CONSTRUCTION BUFFER 843 SF, 0.019 AC PERMANENT WETLAND - GREEN TEMPORARY WETLAND - MAGENTA IMPACT LEGEND PROFILE SCALE 0 0 50 5 PERMANENT WETLAND IMPACT 1 FOR DISSIPATION PAD 68 SF, 0.002 AC DISSIPATION PAD Contractor will follow the following construction sequence: ·Contractor shall notify the Lee County 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to the start of work, contractor shall have all materials and equipment on-site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install proposed storm water bypass piping and storm water conveyance ditch upstream of proposed storm water. ·During construction storm water conveyance a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Lee County specifications ·Contractor shall restore channel and seed and stabilize any disturbance with native species within 24-hours of start of work. H: 1" = 50' V: 1" = 5' RETAINING WALL, TYP. TO BE DESIGNED BY OTHERS SEE DETAIL ON SHEET CWI-2.9 FOR APPROXIMATE DESIGN LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM FILTER DIAPHRAM SEE SHEET CWI-2.9 FOR DETAIL (2) 6" PERFORATED PIPE TO DROP INLET 2.75' 5' EXISTING GRADE (2) 6" PERFORATED PIPE WRAPPED IN #57 WASHED STONE & MIRAFI 140N GEOSYNTHETIC FABRIC WITH 18-INCH OVERLAP AT ALL SEAMS TO DROP INLET SA N SA N HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 IMPACT 2B PROFILE PROFILE 375 380 385 390 395 400 405 410 375 380 385 390 395 400 405 410 3 8 3 . 2 3 8 7 . 0 3 9 1 . 5 3 9 5 . 8 3 9 9 . 2 4 0 2 . 6 4 0 4 . 2 38 8 . 0 9 38 9 . 8 4 39 0 . 4 8 38 9 . 8 8 38 8 . 8 1 40 3 . 6 1 9+00 10+00 11+00 12+00 13+00 14+00 35" DI 301 (4'X4') TOP 388.54 INV IN 384.10 FR (DI 302 (4'X4')) INV IN 384.60 FR (DI 305) INV OUT 383.60 TO (FES 300) 251 LF 36" RCP @ 0.50% HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 IMPACT 2A CROSS SECTION PROFILE 375 380 385 390 395 375 380 385 390 395 3 8 5 . 0 3 8 4 . 2 3 8 5 . 3 38 5 . 0 0 38 7 . 4 4 9+00 10+00 11+00 11+50 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ SCALE 1"=50' 100'50'0 NA D 8 3 LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM CWI-2.2 EN V I R O N M E N T A L I M P A C T 2 1" = 50' TEMPORARY WETLAND IMPACT 2A FOR DRAINAGE CONSTRUCTION 107 SF, 0.002 AC PERMANENT WETLAND IMPACT 2A FOR ROAD FILL 102 SF, 0.002 AC PERMANENT WETLAND - GREEN TEMPORARY WETLAND - MAGENTA IMPACT LEGEND RETAINING WALL, TYP. TO BE DESIGNED BY OTHERS SEE DEATIL ON SHEET CWI-2.9 FOR APPROXIMATE DESIGN PERMANENT WETLAND IMPACT 2B FOR DISSIPATION PAD 42 SF, 0.001 AC TEMPORARY WETLAND IMPACT 2B FOR DRAINAGE CONSTRUCTION 115 SF, 0.003 AC PERMANENT WETLAND IMPACT 2A FOR DISSIPATION PAD 59 SF, 0.001 AC EXISTING GRADE PROPOSED GRADE TEMPORARY WETLAND IMPACT 2A FOR 5' CONSTRUCTION BUFFER 24 SF, 0.001 AC PROPOSED GRADE EXISTING GRADE DISSIPATION PAD PROFILE SCALE 0 0 50 5 X X X X X X X X JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ 0 SCALE 1"=20' 40'20' NA D 8 3 LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM CWI-2.3 EN V I R O N M E N T A L I M P A C T 3 1" = 20' TEMPORARY WETLAND - MAGENTA PERMANENT WETLAND - GREEN IMPACT LEGEND PERMANENT WETLAND IMPACT 3 FOR GRADING 340 SF, 0.008 AC TEMPORARY WETLAND IMPACT 3 FOR 5' CONSTRUCTION BUFFER 61 SF, 0.001 AC TOP OF STREAM BANK X X X X S S W W W W S S S S S S S S S S S MH 14 (5' DIA) MH 5A MH 5 MH 6 MH 4A (5' DIA) MH 4 (5' DIA) MH 3 MH 2 MH 1 EX MH 9 + 5 0 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 1 5 + 0 0 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 1 9 + 0 0 2 0 + 0 0 2 1 + 0 0 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 26 + 0 0 2 7 + 0 0 2 8 + 0 0 2 9 + 0 0 3 0 + 0 0 3 0 + 2 4 . 8 4 9 + 5 0 1 0 + 0 0 1 1 + 0 0 1 1 + 5 3 . 6 3 8" PVC SDR - 26 8" PVC SDR - 26 8" PVC SDR - 26 8" PVC SDR - 26 8" PVC SDR - 26 8" DIP 8" PVC SDR - 26 8 " P V C S D R - 2 6 8" PVC SDR - 26 HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 OFFSITE SEWER (MH14 - MH5) PROFILE 335 340 345 350 355 360 365 335 340 345 350 355 360 365 MH 14 (5' DIA) TOP 362.46 INV IN 350.50 (FR MH 15 (5' DIA)) INV OUT 350.30 (TO MH 5) 93 LF 8" PVC SDR - 26 @ 2.14% MH 5 TOP 356.20 INV IN 348.31 (FR MH 5A) INV IN 348.31 (FR MH 14 (5' DIA)) INV OUT 348.11 (TO MH 4A (5' DIA)) 3 6 2 . 9 3 6 1 . 2 3 5 9 . 0 3 5 5 . 2 3 5 6 . 5 36 2 . 8 1 8+50 9+00 10+00 11+00 11+50 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ 0 SCALE 1"=200' 400'200' NA D 8 3 LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM CWI-2.4 OF F S I T E S E W E R P L A N A N D P R O F I L E ( 1 O F 2 ) 1" = 200' PROFILE SCALE 0 0 50 5 CONNECT TO EXISTING MANHOLE JACK AND BORE APPROX 84 LF 16" STEEL ENCASEMENT PIPE ASTM A139, GRADE B SEE SHEET CWI-2.6 FOR DETAILS HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 OFFSITE SEWER (MH6 - EXMH) PROFILE 315 320 325 330 335 340 345 350 355 360 365 370 375 380 315 320 325 330 335 340 345 350 355 360 365 370 375 380 EX MH TOP 335.75 INV IN 326.76 (FR MH 1) 260 LF 8" PVC SDR - 2 6 @ 2.07% MH 1TOP 342.38 INV IN 332.33 (FR MH 2) INV OUT 332.13 (TO EX MH) 388 LF 8" PVC SDR - 26 @ 0.50% MH 2 TOP 347.44 INV IN 334.47 (FR MH 3) INV OUT 334.27 (TO MH 1) 355 LF 8" PVC SDR - 26 @ 0.50% MH 3 TOP 348.93 INV IN 336.45 (FR MH 4 (5' DIA)) INV OUT 336.25 (TO MH 2) 149 LF 8" DIP @ 2.32% 268 LF 8" PVC SDR - 26 @ 0.99% MH 5 TOP 356.20 INV IN 348.31 (FR MH 5A) INV IN 348.31 (FR MH 14 (5' DIA)) INV OUT 348.11 (TO MH 4A (5' DIA)) MH 5A TOP 360.09 INV IN 352.98 (FR MH 6) INV OUT 352.78 (TO MH 5) 330 LF 8" PVC S D R - 2 6 @ 3.00% MH 6 TOP 372.51 INV IN 363.08 (FR MH 7 (5' DIA)) INV OUT 362.88 (TO MH 5A) 172 LF 8" PVC SDR - 26 @ 3.00% 112 LF 8" PVC SDR - 26 @ 4.00% 330 LF 8" PVC S D R - 2 6 @ 3.00% MH 4A (5' DIA) TOP 359.01 INV IN 342.95 (FR MH 5) INV OUT 342.75 (TO MH 4 (5' DIA)) 3 3 3 . 1 3 3 4 . 4 3 3 6 . 0 3 3 8 . 2 3 4 1 . 5 3 4 0 . 9 3 4 0 . 1 3 4 1 . 9 3 4 2 . 3 3 4 1 . 8 3 4 1 . 7 3 4 2 . 2 3 4 4 . 3 3 4 5 . 4 3 4 4 . 1 3 4 2 . 6 3 4 5 . 2 3 4 6 . 0 3 4 6 . 2 3 4 7 . 0 3 4 7 . 0 3 4 6 . 2 3 4 7 . 8 3 5 1 . 9 3 5 4 . 9 3 5 6 . 1 3 5 6 . 9 3 5 6 . 5 3 5 6 . 1 3 5 7 . 9 3 5 6 . 5 3 5 5 . 9 3 5 5 . 2 3 5 5 . 8 3 5 9 . 0 3 6 0 . 4 3 6 1 . 9 3 6 2 . 8 3 6 4 . 4 3 6 6 . 1 3 6 9 . 0 3 7 2 . 8 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+0030+50 MH 4 (5' DIA) TOP 353.99 INV IN 340.11 (FR MH 4A (5' DIA)) INV OUT 339.91 (TO MH 3) ST R E A M C E N T E R L I N E CWI-2.5 OF F S I T E S E W E R P L A N A N D P R O F I L E ( 2 O F 2 ) JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ PROFILE SCALE 0 0 50 5 JACK AND BORE APPROX 84 LF 16" STEEL ENCASEMENT PIPE ASTM A139, GRADE B 58" H: 1" = 50' V: 1" = 5' S S HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 STREAM CROSSING PROFILE 325 330 335 340 345 350 355 360 325 330 335 340 345 350 355 360 MH 4 (5' DIA) TOP 353.99 INV IN 340.11 (FR MH 4A (5' DIA)) INV OUT 339.91 (TO MH 3) 149 LF 8" DIP @ 2.32% MH 3 TOP 348.93 INV IN 336.45 (FR MH 4 (5' DIA)) INV OUT 336.25 (TO MH 2) 3 5 3 . 5 3 5 0 . 5 3 4 6 . 0 3 4 6 . 6 3 4 7 . 2 8+50 9+00 10+00 11+00 12+00 12+50 58" CR E E K C E N T E R L I N E JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ 0 SCALE 1"=20' 40'20' NA D 8 3 LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM CWI-2.6 JA C K A N D B O R E S T R E A M C R O S S I N G P L A N A N D P R O F I L E 1" = 20' EXISTING GRADE PROFILE SCALE 0 0 50 5 20' PUBLIC SANITARY SEWER EASEMENT JACK AND BORE APPROX. 84 LF 16" STEEL ENCASEMENT PIPE ASTM A139, GRADE B JACK AND BORE APPROX. 84 LF 16" STEEL ENCASEMENT PIPE ASTM A139, GRADE B MH 4 (5' DIA) 8" DIP MH 5 TOP OF STREAM BANK OH U OH U OH U X X T D FES 300 385 39 0 395 400 39 039 540 040 5 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ 0 SCALE 1"=60' 120'60' NA D 8 3 LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM CWI-2.7 WE T L A N D B H Y D R O L O G I C I N F O R M A T I O N 1" = 60' PERMANENT WETLAND - GREEN TEMPORARY WETLAND - MAGENTA IMPACT LEGEND WETLAND B ORIGINAL FLOWPATH ANALYSIS POINT B CONTRACTOR TO INSTALL PERMANENT DITCH AND STORM WATER BYPASS NETWORK EARLY IN GRADING DEVELOPMENT FOR PHASE 1 OF EROSION AND SEDIMENTATION CONTROL. STORM WATER BYPASS WILL ALLOW FOR CONTINUOUS FLOW INTO WETLAND B UFO UFO UFO UFO UG T UGT UGT UGT W W W W FES 400 385 390 395 390 390 395 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ 0 SCALE 1"=60' 120'60' NA D 8 3 LEGEND EXISTING CONTOUR PROPOSED CONTOUR PROPOSED DRAIN EASEMENT WETLANDS EXISTING POND EXISTING STREAM CWI-2.8 WE T L A N D K H Y D R O L O G I C I N F O R M A T I O N 1" = 60' PERMANENT WETLAND - GREEN TEMPORARY WETLAND - MAGENTA IMPACT LEGEND WETLAND A ORIGINAL FLOWPATH ANALYSIS POINT A CONTRACTOR TO INSTALL PERMANENT DITCH AND STORM WATER BYPASS NETWORK EARLY IN GRADING DEVELOPMENT FOR PHASE 1 OF EROSION AND SEDIMENTATION CONTROL. STORM WATER BYPASS WILL ALLOW FOR CONTINUOUS FLOW INTO WETLAND A JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N YO U R V I S I O N A C H I E V E D T H R O U G H O U R S . Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . 11/14/2022 WI C K E R F A R M SO U T H F R A N K L I N D R I V E , S A N F O R D , L E E C O U N T Y , N O R T H C A R O L I N A 40869       54 1 0 T r i n i t y R o a d , S u i t e 1 0 2 | R a l e i g h , N C 2 7 6 0 7 TE L 9 1 9 . 8 6 6 . 4 9 5 1 F A X 9 1 9 . 8 3 3 . 8 1 2 4 w w w . t i m m o n s . c o m TH I S D R A W I N G P R E P A R E D A T T H E RA L E I G H O F F I C E 331 331 MVZ CWI-2.9 NO T E S A N D D E T A I L S NTS Typical Reinforced Wall Section (Designed By Others, Subject to Change) Reinforced Soil Retained Soil Foundation Soil De s i g n H e i g h t KEYSTONE CAP UNIT KEYSTONE STND.UNIT Unit Drainage Fill(3/4" Crushed Rock or Stone) Finished Grade Unreinforced Concrete or Crushed StoneLeveling Pad ApproximateLimits ofExcavation 4" Perforated PVCDrainage Tile 8" Min. Low Permeable Soil 1" - 1 1/4" 8" Note: When site conditions require, wrap drainagetile in 3/4" aggregate and filter fabric withdrainage composite or aggregate back drainsystem, as directed by geotechnical engineer. Grid Depth CONCRETE POST FOOTING HE I G H T P E R D E S I G N E R NON-WIND LOADED FENCE(WALL DESIGNER TO DETERMINE WHETHERFENCE INSTALLATION IS REQUIRED OR NOT) NOTE: THIS REINFORCED WALL DETAIL IS FOR REFERENCE ONLY. CONTRACTOR TO BUILD RETAINING WALLS FROM SPECIFIC DETAILED DESIGN PLANS BY OTHERS FOR THIS PROJECT NOT TO SCALE FILTER DIAPHRAGM DETAIL SECTION VIEW FLOW CONCRETE PLAN VIEW PROPOSED GRADE #57 WASHED STONE MIRAFI 140N GEOSYNTHETIC FABRIC WITH 18-INCH OVERLAP AT ALL SEAMS (TYP) FLOW CONCRETE 6" PERFORATED PVC TO DOWNSTREAM STORMWATER STRUCTURE #57 WASHED STONE 6" PERFORATED PVC COLLECTOR PIPE COLLECTOR PIPE TO BE CAPPED ON BOTH ENDS 2' VARIES 2' 2' VARIES 2.75' 2.75' Action ID Number: SAW-2022-02049 County: Lee Permittee: Forge Investment Group (Attn: Mark Lyczkowski) Project Name: Wicker Farm / 125 South Franklin Drive / Sanford / residential Date Verification Issued: 12/27/2022 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ ______________________ Signature of Permittee Date SAW-2022-02049 A. Determination of Jurisdiction: 1. ܈ There are waters, including wetlands on the above-described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ܆ There are Navigable Waters of the United States within the above-described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 3. ܆ There are waters, including wetlands within the above-described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 4. A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. ܆ The jurisdictional areas within the above-described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID: . B. Basis For Determination: See the Preliminary Jurisdictional Determination form dated 12/27/2022. C. Remarks: D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps’ Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin, Appeal Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 AND PHILIP.A.SHANNIN@USACE.ARMY.MIL In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: ______________________________________________________ David E. Bailey Date of JD: 12/27/2022 Expiration Date of JD: Not applicable Date: 2022.12.27 12:13:21 -05'00' NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Forge Investment Group (Attn: Mark Lyczkowski) File Number: SAW-2022-02049 Date: 12/27/2022 Attached is: See Section below ܆ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ܆ PROFFERED PERMIT (Standard Permit or Letter of permission) B ܆ PERMIT DENIAL C ܆ APPROVED JURISDICTIONAL DETERMINATION D ܈ PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 If you only have questions regarding the appeal process you may also contact: MR. PHILIP A. SHANNIN ADMINISTRATIVE APPEAL REVIEW OFFICER CESAD-PDS-O 60 FORSYTH STREET SOUTHWEST, FLOOR M9 ATLANTA, GEORGIA 30303-8803 PHONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PHILIP.A.SHANNIN@USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation, and will have the opportunity to participate in all site investigations. ________________________________________ Signature of appellant or agent. Date: Telephone number: For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: David E. Bailey, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137