HomeMy WebLinkAboutSW4220201_Application Form_20230103IV. PROJECT INFORMATION
1. In the space provided below, briefl summarize how the 5tormwater runoff will be treated.
RMbv-12 lQgNoFF -iro � 1� G�iaffN17 OU fl UNP�E �2vaND
�c� GQvk�r TEfRov f/ 6���� Drrvlt�5.
41 0m( ow cfl Cflr4� i 5 4�0
Ve 7 7� f6a�S #Ayx r ! '2�7V lr v�Po2/kii`a. Low Dr�usr Aet:�ES /,uCoilPC2A��
2. a. If .claiming vested rights, identify the supporting documents provided and the date they were approved:
Approval of a Site Sp Specific Development Plan or PUD Approval Date:
ro
NI�F-1 Valid Building Permit Issued Date:
[] Other: Date:
b.If claiming vested rights, identify the regulations) the project has been designed in accordance with:
Coastal SW - 1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the A.
dk; n r« Pee- River basin.
4. Total Property Area: � • b3 acres 5. Total Coastal Wetlands Area:
acres
6. Total Surface Water Area, acres
7. Total Property Area (4) - Total Coastal Wetlands Area (3) - Total Surface Water Area (6) = Total Project
Area 8j acr--s
f)t rl larol ct [x7'eR 4rx11 !7,-, cllculxt :.I to _,-,Jude tits Il�7ztrfrt fire rt��rrrttx{ pvnl rr{.r f1�V}tti�zt �rrr l�arr!ftil{r I+�rrtrr
betuv'err the banks of 1rc'aIw; Bird rt Hers, the ffrea betlon !iu orrrt rl Ifi�lt VVZLline.
,1 g
(1l� MH V) line. and coa5tal uyetlaails I'r+rda,ard front. the rVH1 V {sir MH1M lir�.G- T1tI ra:5tritrtrt.t project irH is Ime td
Calculate 011erall..per'crnt built a{port zrwa (BfIA). jMv-coastal arretlawls laf?11U1rzt'-
' UC the NHIV V roc A [Hti�7 lute rrrrrt�
be vtclu,Iet-1 in the' total project area. %
8. Project percent of impervious area, (Total Impervious Area / Total Project Area) X 100
9. How naanY drainage areas does the project have? 7 (For higlr d0tsiti. =_,,rant 1 for each pr�ptrsecl e�tgr'rreerect
5torrlrrvirter-13,14P. For Iort• r eu3ihl and othgrprojects, use I for Ote who(O' Prc'I7e)-t1J zrelr)
10. Complete the fol[owing information for each drainage area identified it Prrsject Information item 9. Lf there
are more than four drainage areas in the project, attach an additional sheet with the information For each area
provided in the same format as below.
Basin Information Drama e Area Drama e Area Z Draina e Area 3 Drama- e Area
Receiving Stream Name ��/j �a rn-ttr ► f/ �r-Gnclz j�,// ranch .l � %�� w�h
Stream Class
Stream Index Number ?y 5 !Z-fll- 5
Total Drainage Area (sf) �j3 5°!. $o /if ail• 6� qD 9��• Ztl� 5yZ• `fo
'/o
Ga3 �5�1 So 03j. �l • 2° 2! 5Nz •
Z
On -site Drainage Area (sf) 00 a O
Off -site Drainage Area (sf) TJ o
Proposed Irn ery ions Area** (sf) 10Y pQ. P D
Iai ervious Area** (total) q2,af �G•ol /.�� �/'2�
Im ervious** Surface Area Draina Area 1 Draina e Area , Draina e Area 3 Drainage Area
On -site Buildings/Lots (sf) qq 5314 /1 2 2l3
On -site Streets (sf)
O d � b
On -site Parking (sf) Iq 501 � 8p
2310. �o
On -site Sidewalks (sty
Other on -site (5f) O O
Future (30 b D D
OFF -site (5f) 0 d
Existing BUA*** (50
Total (sf):
l0£t 900.oa &�l y68,go Z+ 03, 20 �0 boy.$v
Strearii CIaSs afld llidel NitrltbeY Curl be [ etL'ri;rrned at: +!'_''1"t�tl-1i��i�
Int ervious area is defined as the built upon area including, but riot limited to, buildings, roads, parking areas,
sidezoalks, gravel areas, etc.
Form SWU-101 Version Oct. 31, 2013 Page 3 of 6
IV, PROJECT INFORMATION
1. In the space provided below, tdtUy summarize how the stormwater runoff will be treated. o�N�
WRY t2vNOFF �Lf�B 6R l(?VtiN'� '�tlrtvr✓ t{ (%RJrf]
pIG Nrr,�-! PAS .tea/See
vC��� f�.4e314
�VE �So $,�► �iVf.�RPoR-moo. �w ae-usit?ts �iUCoRPoZ .
a If claiming vested rights, identify the supporting documents provided and the date they were approved:
Q
Approval roval of a Site Specific Development Plan or PUD Approval Date: `
NJA ❑ Valid Building Permit Issued Date:
❑ Other: Date:
b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
N P A ❑ Coastal SW - 1995) ❑ Ph II - Post Construction
River basin.
3. Stormwater runoff from this project drains to the
I�d�►�
4. Total Property Area. � I 3 acres 3. Total Coastal Wetlands Area: b acres
6. Total Surface Water Area: b acres
7. Total Property Area (4) - Total Coastal Wetlands Area (3) - Total Surface Water Area (6) = Total Project
Areal: • �� acres
- T.�t:rl pro(rvt tre:z sir,r[d l,t, ial tr[ r ed to e,_rc11fJ� the fblll rr,rrrg: the r!rrnrral trocq o r.rrc urr..rt:fW:I-Er'rt,tur!s, the area
between tile: banks Of �tr�arn� air i ritrYrs, t1n :rre:r h L7:t> lire ti' �r rrr rl Hr.'gt� '�yirt�r f �'�? ti'} Irrr or ;ect a r a is sefl o
frLl!fbV1 l7Fre,.r:r+[��i'�cerzil(tr�iItlrrtis 7nnlrr'etward r o+rNon-coastal (or
i ' l Luis 1zi+tclrr�z The
�i cif t1lel ti 1V}( r�44rI 1[ i lirrelway
calculate � �� .l � t
l7e r.rt lu:fecf In t1ir total project rtrerr..
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 2.55 9/0
9. How many drainage areas does the project have?__7 (For lriglr density, cortrrt 1 for Cacti proposed errgirreered
stormwater BMP. For low density and other projects, use I,for fire zolroie property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.r '4ePLst
Basin Information Draina e Area S Draina e Area / Draina e Area l Draina e Area _
Receiving Stream Name rlt+ JJ 8rgndc
Stream Class *
Stream Index Number 12-9y 5 /�-9 5 12` � 15
Total Drainage Area (so 2! 908.'/° yL� Za r � 3 1• �
On -site Drainage Area (sf) 3�l 9a�• �/o 3S9 3
Off -site Drainage Area (st) d
Proposed impervious Area** st} /23 �to��o (pv 54 2
% irncervkmis. Area** (total) 38,�f3 35• I5 /q I.
Im Surface Area
Draina e Area
Draina e Area
Dram � Area Of
Drainage Area
rvious'
On -site Buildings/Lots (sf)
fs5 Ive1
3� 599
On -site Streets (sf)
3� n, f
01
On -site Parking (sf)
0_
Q
O
On -site Sidewalks (sf)�9
Other on -site (50
d
O
0
Future (sf)
b
Off -site (sf)
O
d
Existing S[.TA` {s*
Total s
( ��
/23 '/0.`/0
�p0 'rJ�2
35 045
Stream Class and bidet NlrIII ber
can be detemun«l at:
IrrF>>:. ortr!•.rr dejo..".r
• h1c
, - ,y :tirr•.I�r,;rpri,rrr.rr�
r
lrri}}rennotts area is defined as the
built upon area including, but not limited to, buildings, roads, parking areas,
sir.�l wanks, gravel areas, etc.
A
Form SWU-101 Version Oct. 31, 2013 Pale 3 of 6