Loading...
HomeMy WebLinkAboutNCG210033_DMR_20221030Semi-annual Stormwater Discharge Monitoring Report for North Carolina DEMLR General Permit No. NCG210000 Date submitted 1-30-22 CERTIFICATE OF COVERAGE NO. NCG210 0 3 3 FACILITY NAME Southern Veneer Specialty Products, L.L.C. COUNTY Chatham PERSON COLLECTING SAMPLES Randall Jarrell LABORATORY WM and ENCO Lab Cert. # 5038 & 591 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2022 SAMPLE PERIOD ❑ Jan -June * July -Dec or ❑ Monthly' October (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA R;" °� ❑Zero -flow ❑Water Supply ❑SA [:]Other NOV 15 U 1''OEN TIAL FILE"') PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A: Stormwater Benchmarks and Monitoring Results (Monitoring is required only if the facility stores exposed accumulations of sawdust, wood chips, bark, mulch, or other similar material on site for longer than seven (7) days.) n No discharge this period?2 Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Chemical Oxygen Demand Total Suspended Solids Benchmarks =__> - - 120 mg/L 100 mg/L or 50 mg/L4 #1 10-1-22 3.64 270 62 #3 10-1-22 3.64 100 26 #4 10-1-22 3.64 71 10 #5 10-1-22 3.64 33 8.2 #6 10-1-22 3.64 98 6.4 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. Permit Date: 8/1/2018-7/31/2023 SWU-245, last revised 8/6/2018 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period:2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks ===> - - 15 mg/L 100 mg/L or 50 mg/L4 #4 10-1-22 3.64 6.4 10 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES M NO ❑■ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES [■ NO ❑ REGIONAL OFFICE CONTACT NAME: Thad Valentine Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 8/1/2018-7/31/2023 (Date) SWU-245, last revised 8/6/2018 Page 2 of 2 4 0 , NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: http://portal ncdenr org/webllr/npdes-stormwaterl Permit No.: N/C/G/ 210000 / -/_/ or Certificate of Coverage No.: Facility Name: Southern Veneer Specialty Products, L.L.C. County: Chatham Phone No. Inspector: Randall Jarrell Date of Inspection: 10-1-22 Time of Inspection: 10:15 Total Event Precipitation (inches): _3.64 919-275-3249 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. ...................... ....... ..............__.......... _ ........ _.__............... ............................................ ........ ......__......................... ._..... _ . By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 1 Structure (pipe, ditch, etc.) Ditch Receiving Stream: Haw River Describe the industrial activities that occur within the outfall drainage area: Wood Production Water 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Brown grey tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): Normal 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 x4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 x2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 x3 4 5 7. Is there any foam in the stormwater discharge? xYes No 8. Is there an oil sheen in the stormwater discharge? Yes xNo 9. Is there evidence of erosion or deposition at the outfall? Yes xNo 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. 'These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit. http://portal.ncdenr.org/web/Ir/npdes-stormwater/ Permit No.: N/C/G/ 210000 /_/_/ or Certificate of Coverage No.: N/C/G/ 2 /1_/0_/ 0 / 3/ 3 / Facility Name: Southern Veneer Specialty Products, L.L.C. County: Chatham Phone No. 919-275-3249 Inspector: Randall Jarrell Date of Inspection: 10-1-22 Time of Inspection: 0955 Total Event Precipitation (inches): _3.64_ Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DW( ............... ................................ -- - Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee Designee) SWU-242, Last modified 10/25/2012 Pagel of 2 1. Outfall Description: Outfall No. 3 Structure (pipe, ditch, etc.) Ditch Receiving Stream: Haw River Describe the industrial activities that occur within the outfall drainage area: Wood Production Water 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): Slightly Musty 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 x2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: x1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 x2 3 4 5 7. Is there any foam in the stormwater discharge? Yes xNo B. Is there an oil sheen in the stormwater discharge? Yes xNo 9. Is there evidence of erosion or deposition at the outfall? Yes xNo 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 .A!4xi'f2;A NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out thisform, please visit. httn://aortal ncdenr org/web jh-/npdes-stormwater/ Permit No.: N/C/G/ 210000 /_/_/ or Certificate of Coverage No.: N/C/G/ 2 /1_/0_/ 0 / 3/ 3 / Facility Name: Southern Veneer Specialty Products, L.L.C. County: Chatham Phone No. Inspector: Randall Jarrell Date of Inspection: 10-1-22 Time of Inspection: 0945_ Total Event Precipitation (inches): _3.64 919-275-3249 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). ._......................._............__._._........... ....---..._.............. Qualitative monitoring requirements vary. Most permits require qualitative monitoring .. .. .. to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee nor Designee) Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 4 Structure (pipe, ditch, etc.) Ditch Receiving Stream: Haw River Describe the industrial activities that occur within the outfall drainage area: Wood Production 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Slight brownish grey tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): Slight Oil 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 x2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: x1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 x2 3 4 5 i. Is there any foam in the stormwater discharge? Yes xNo 8. Is there an oil sheen in the stormwater discharge? Yes xNo 9. Is there evidence of erosion or deposition at the outfall? Yes xNo 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: h tt p://nortal.ncdenr orgjweb j r des-stormwater/ Permit No.: N/C/G/ 210000 /_/_/ or Certificate of Coverage No.: N/C/G/ 2 / 3 / 0 / 3 /3_/ Facility Name: Southern Veneer Specialty Products, L.L.C. County: Chatham Phone No. 919-275-3249 Inspector: Randall Jarrell Date of Inspection: 10-1-22 Time of Inspection: 0925_ Total Event Precipitation (inches): _3.64 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). --- .___... __.......................11 _.._.......... ............... ...................... ........._.............. .. Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. ......._......................... .. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee orbesignee) Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: outfall No. 5 Structure (pipe, ditch, etc.) Ditch Receiving Stream: Haw River Describe the industrial activities that occur within the outfall drainage area: Wood Production 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Slight yellow tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): Normal 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: x1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: x1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 x2 3 4 5 7. Is there any foam in the stormwater discharge? Yes xNo S. Is there an oil sheen in the stormwater discharge? Yes xNo 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe xNo Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 WA A &4 I 'JA AUSENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: http• //portal ncdenr orgJwebJII npdes ctormwa Pr[ Permit No.: N/C/G/ 210000 /_/_/ or Certificate of Coverage No.: N/C/G/ 2 / 1 /0_/0_/ 3/3_/ Facility Name: Southern veneer Specialty Products, L.L.C. County: Chatham Phone No. Inspector: Randall Jarrell Date of Inspection: 10-1-22 Time of Inspection: 0935 Total Event Precipitation (inches): _3.64 919-275-3249 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtainsapp........................................................................... ............ ..................__._ .._. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or D Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: outfall No. 6 Structure (pipe, ditch, etc.) Ditch Receiving Stream: Haw River Describe the industrial activities that occur within the outfall drainage area: Wood Production Water 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light Clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): Normal 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: x1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: x1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 x2 3 4 5 7. Is there any foam in the stormwater discharge? Yes xNo 8. Is there an oil sheen in the stormwater discharge? Yes xNo 9. Is there evidence of erosion or deposition at the outfall? Yes xNo 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012