HomeMy WebLinkAboutNCC213190_NOT Closeout Documents_20221222North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Randolph Project: Asheboro- Biscoe 230 KV Structure River basin: Yadkin-PeeDee
Person financially responsible: Duke Energy Progress, LLC - Randy N Veltri, Project #: RANDO-2021-027
Manager, Trans Permitting
Address: 410 South Wilmington Street, NCRH05, Raleigh, NC 27601
1. Project Location: King View Rd., Asheboro
Pictures: Yes -Digital
2. Weather and soil conditions: Cloudy, 30s, workable soil Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES PermitNCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: December 15, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. The plan was approved after April 1, 2019
and termination of coverage under the NPDES General Stormwater Permit for Construction
Activities should be requested by the permittee via Notice of Termination at
https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. If you have any questions, please
contact meat Robby.DeansAncdenr.gov or by phone at (336) 776-9658.
Reported by: Robby Deans Others present:
Date of inspection: December 14, 2022 Time arriving on site: 9:30 AM Time leaving site: 10:00 AM
cc: