Loading...
HomeMy WebLinkAboutNCC213190_NOT Closeout Documents_20221222North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Randolph Project: Asheboro- Biscoe 230 KV Structure River basin: Yadkin-PeeDee Person financially responsible: Duke Energy Progress, LLC - Randy N Veltri, Project #: RANDO-2021-027 Manager, Trans Permitting Address: 410 South Wilmington Street, NCRH05, Raleigh, NC 27601 1. Project Location: King View Rd., Asheboro Pictures: Yes -Digital 2. Weather and soil conditions: Cloudy, 30s, workable soil Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES PermitNCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: December 15, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. The plan was approved after April 1, 2019 and termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination at https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. If you have any questions, please contact meat Robby.DeansAncdenr.gov or by phone at (336) 776-9658. Reported by: Robby Deans Others present: Date of inspection: December 14, 2022 Time arriving on site: 9:30 AM Time leaving site: 10:00 AM cc: