Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0043934_Application (FTSE)_20221019
DWR Division of Water Resources NC Dept of Environmental Quality GCT 19 2022 State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Raleigh Regional Office FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: VIP Oa/3 V to be wi. mplered by DWR; All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Clayton (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ Genera! Partnership ❑ Pnvately-Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Joshua Baird, PE per I; A NUM 3]? r .1 i I061;71 Title: Director of Engineering 4. Applicant's mailing address: 111 E. Second Street City. Clayton State: NC Zip: 27520- 5, Applicant's contact information. Phone number: (919) 359-5002 Email Address: Liqmwrville.a stn. arti c&un 11. PROJECT INFORMATION: 1. Project name: Walton Farms Phase 5&6 2 Application/Project status. ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number; WQ00 3. County where project is located: Johnston 4. Approximate Coordinates (Decimal Degrees): Latitude: 39.6966 Longitude:--78.4203 5. Parcel ID (if applicable): 16i02047Z (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: Tim Summerville License Number: 036418 Firm: Stewart Mailing address: 101 West Main Street City: Durham State: NC Zip: 27701- Phone number: (919) 866-4794 Email Address: tsummervillet stewartin.com 1V. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Little Creek Permit Number: NC0025453 Owner Name: Town of Clayton V. RECEIVING DOWNSTREAM SEWER INFORMATION: I. Permit Number(s): WQ0040273 2. Downstream (Receiving) Sewer Information: 8 El Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS 00110 Owner Name(s): Town of Clayton FORM: FTA 06-21 Page ! of 5 I. GENERAL REQUIREMENTS I . lithe Applicant is a Privately -Owned Public Utility. has a Certificate of Public Convenience and Necessity been attached? El Yes ❑No ®N:A ▪ If the Applicant is a Developer of lots to be sold, has a Developer's Operations] Agreement lFORN1: DEVl been attached? ❑ Yes ❑ No ®NSA 3. If the Applicant is a Home:Property Owners' Association, has an 1I0A1POA 0Dsrational Agreement FORM. l lt_lj and supplementary documentation as required by I5A NCAC 02T.01 15(c) been attached? ❑Yes ❑No ®N'A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Residential (Leased) 0 School preschool day care ❑ Food and drink facilities ❑ Businesses offices factories ❑ Retail (stores, centers. malls) ❑ Retail with food preparation/service 0 Medical dental veterinary facilities ❑ Church ❑ Nursing Home 0 Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool.Clubhouse 0 Swimming Pool. Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 °•o Domestic % Commercial % Industrial (See 15,E NCAC 021 .0103{201) If Industrial, is there a Pretreatment Program in effect? ❑ Yes❑ No 6. Has a flow reduction been approved under I5A NCAC :121 to 1 ]4()? ❑ Yes ❑ No If ves, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow'•b No. of Units Flow Residential Single Family 250 gal:day 61 15.250 GPD gal/ GPD gal/ GPD gat/ GPD gale GPD gal:` GPD Tour/ 15,250 GPD a See 15A NCAC 02 f .01 14(bl, Id) felt l,.and {e1I21 for caveats to wastewater design flow rates (i.e.. minimum flow per dwelling: proposed unknown non-residential development uses: public access facilities located near high public use areas: and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G S. 42A-4). b Per I5A NCAC 02T .01 14(c). design flow rates for establishments not identified [in table I5,\ NCAC 021 t: ] i shall be determined using available flow data, water using fixtures. occupancy or operation patterns, and other measured data. R Wastewater generated by project: 15,250 GPD (per 15A NCAC 02 f .0l 14) Do not include future flows or pre%iously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station. Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: 0 Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other(Explain): FORM: I=TA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02 I .0305 & 1IDC (Gray itv Sewers): I Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1807 PVC SDR-95 Section II & IIi of the MDC for Permitting of Gravity Sewers contains infommtion related to design criteria • Section Ili contains information related to minimum slopes for gravity sewer(s) ▪ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations.•Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude:" Longitude; 3. TotaI number of pumps at the pump station: 3 Design flow of the pump station: millions gallons per day (firm capacity) • This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): If any portion ache force main is less than 4-inches in diameter, please identify the me hod of solids reduction per MDCPSFM Section 2.0IC. I,b, ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(hii 1): ❑ Standby power source or ❑ Standby pump Must have automatic activation and telemetry • I 5A NCAC 02T_0305(h)(t )(B)_ • Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day • Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ▪ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-2 I Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(t)): I. Does the project comply with all separationsealternatives found in l sA NCAC 021 .03051011.0r ® Yes ❑ No 15A NCAC 02T.0305(t) contains minimum separations that shall be rovided for sew p Setback Parameter* er systems. Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 2Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B. SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) _ 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) .r_ 36 inches noncompnance witn U• ' t _U ? it) or (g.?_ see Section X. l of this application * 15Q,_NCAC 02T,03051g) contains altematives where separations in 02T.{)305(t) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Class lications welLiass 2. Does this project comply with the minimum separation requirements for water maims? ® Yes ❑ No ❑ NA If no. please refer to I5A NCAC I8C.0406(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE. verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? Please provide supplementary information identifying the areas of non-conformance. • See the Division's draft separation requirements for situations where separation cannot be met. • No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Neuse River If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B 0200' • This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage. authorization under a 404 Nationwide: individual permits or 401 Water Quality Certifications? • Please provide the permit numberpermitting status in the cover letter if coverage authorization is requi ® Yes ❑ No ❑ N'A ❑ No ® Yes ❑ No ❑ Yes ®No red. 6. Does project comply with I5A.NCAC 02 C.01Lc1(6) (additional permttslcertifications)_? ® Yes ❑ No Per 15.E NCAC E u5(c)(6j. directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans. stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 1.'A NCAC 021 f,'402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. If yes. include an attachment with details for each line, including type (aerial line, size, material. and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 1SA NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with 15 1 N{,IC 021. the \lintrtium Design Criteria tier the Permitting ur Puinp Stater and I rrce tains i latest and the Gra% tt\ Sew cr Minimum 1hsiian Criteria ! latest %cr,t,1n) as applicable? Yes [] No If no, for protects requiring a single variance. complete and submit the Variance, Alternative Design Request applicatic (VADC 10-14) and supporting documents for review to the Centrai Office. Approval of the request will be issue concurrently with the approval of the permit, and projects requiring a variance approval may be subject to tonal review times. For projects requiring two or more variances or where the variance is determined by the Division to be si_nificant portion of the project, the full technical review is required. 2. Professional Engineer's Certification: _Timothy Summerville attest that this application for Walton Farms Phase 5&6 (Professional Engineer's name from Application item Hi ! ) (P:ojecs Name from Application Item rl-I} has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans specifications, engineering calculations. and all other supporting documentation to the best of my knowledge. i furthe attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations �itnimutn i)e,iiin Criteria forCiravity Se15er; (latest .erstoni, and the Mlininium D&stun Criteria for the Fast -Trick Permittini of Purim Stations and Force \lain: (latest ieraionl. Although other professionals may have developed certain portions of thi. submittal package. inclusion of these materials under my signature and seal signifies that 1 have reviewed this material anc have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B. any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000. as well as civil penalties up to S25,000 per violation. Misrepresentation of the application information. including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 5thal ) NI, CAR° ,4,,, �0 .17 North Carolina Professional Engineer's seal, signature, and date: ?��wt, 3■44: ttttfnirin t ri,,tve 3 Applicant's Certification per 15A NCAC 02T .0106i b): (' I _ii©S '.Lt-t G 4c attest that this application tt_,r ( 4141vi rG/Ms rive. G -6 n lure t.,';...n•v Name fir ifn .La' r i . •- ; : ) t °inject \amc from Application item II I) attest that this application has been reviewed by me and is accurate and complete to the best of iffy knowledge. I understand that if all required parts of this application are not competed and that if all required supporting documentation and attachments are not included. this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief anti or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated 1 also understand that if all required parts of this application. package are not completed and that if all required supporting information and attachments are not included. this application package will be returned to me as incomplete NOTE — In accordance with General Statutes 143-215 6A and 143-215 t,B. any person who knowingly snakes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S10.000 as well as civil penalties up to S25.000 per 'iolation. Signature: Date: l 9/A)-/2 0 A FORT FTA 06-21 Paste 5 of 5 Division of Water Resources NC Dept of Environmental Qualit) GCT 19 Raleigh Regional Office Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) State of North Carolina Department of Environmental Quality Division of Water Resources Entity Requesting Allocation: Town of Clayton Project Natne for which flow is being requested: Walton Farms Phase 5&6 More than one FTSE ma) • be required for a single project if the owner of the Wi3TP is not responsible for all pump stations along the route of the proposed wastewater flow 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Little Creek b. WWTP Facility Permit #: 0025453 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD LCWRF 2.5 + JoCo 1.4 + Raleigh 1.75 = 5.65 MGD 0.8434 2.992 0.0153 3.8507 68.2% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Firm Capacity, * MGD NuesePS 1 1.080 (A) Design Average Daily Flow* * (Firm pt), MGD (B) (C) (D)=(B+C) (E)=(A-D) Obligated. Approx. Not Yet Total Current Current Avg. Tributary Flow Plus Daily Flow. Daily Flow, Obligated Available MGD MGD Flow Capacity*** 0.4320 0.2090 0.0208 0.2298 0.2022 ClaytonRal 2.5200 1.0080 0.3440 0.2881 0.6321 0.3759 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is . 0. Downstream Facility Name (Sewer): Riverwood Gravity Downstream Permit Number: WQ40273 Page 1 of 6 FTSl_ 04-!6 Certification Statement: I Joshua B. Baird _ certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. 1.; 7/2?-4()).z_ Signing Official Signature Date Page 2 of 6 I 'I'S E 04- 16 -11 STEWART STRONGER BY DESIGN Walton Farms, Phase 5&6 Town of Clayton, Johnston County, North Carolina The referenced site is located along the West side of Covered Bridge Road near the intersection of Loop Road in Clayton, NC. The sanitary sewer extension is to be built to serve a single-family residential community of 61 units constructed in 2 phases. Below is a table estimating the flows for this system at the ultimate build - out. The following flow rates have been determined the allocation that has been approved for the Town of Clayton: TOTAL PHASE USE # UNIT G/D/SF FLOW (gal/u/d) (gal/day) Single Family 5 Residential 33 Lot 250 8250 Single Family Residential 28 Lot _ 250 7,000 Sub Total 15,250 gal/d. The flows generated from all phases is what is being requested at this time. 101 WEST MAIN ST. T 919.380.8750 DURHAM. NC 27701 F 919.380.8752 in NISI in ME OW. Yse.• II,S. DEPARTMENT O%TNE INTERIOR U.S. GEOLOGICAL SURVEY e. �wrw ;: US Topo WAIL 1-1+00u ?VC Dept OfEnvironmental Quality GCT 19 2022 11 ion Int T. inn IMO ONO goo IS 14. tuYTON QUADRANGLE NOINTICIAOLIIIA I.f._nE SEINES IMO (E1YE¢� 144 1Ew 1r1 rwou STEWART STRONGER BY DESIGN LETTER OF TRANSMITTAL TO NC Dept of Environmental Quality CCT 1 9 2022 Raleigh Regional Office FROM NCDEQ - DWR TIM SUMMERVILLE FTSE PERMITTING AND REVIEW 3800 Barrett Drive (919) 866-4794 Raleigh, NC 27609 DATE SENT VIA 10.19.2022 Hand Delivery PROJECT NUMBER PROJECT NAME L21048 WALTON FARMS PHASE 5&6 COPIES DATE DESCRIPTION COMPLETED FTSE APPLICATION 1 FLOW TRACKING APPLICATION 1 COVER LETTER 1 STREET LEVEL MAP 1 USGS MAP CHECK FOR $480 For approval ❑ For review & comment C Returned for corrections For your use ❑ Approved as submitted C Returned after review As requested ❑ Approved as noted C Resubmit copies for approval COMMENTS Please find enclosed Fast Track Sewer Application and all supporting documents including plans and submittal fee. Contact me at 919.740.3397 or tsummervilleiAstewminc,com if additional information is required. SIGNED COPIED TO File 101 WEST MAIN ST. T 919.380.875C DURHAM, NC 27701 IE 919.380.8752