Loading...
HomeMy WebLinkAboutWQ0000484_Monitoring - 06-2022_20220718FORM NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page - of Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2022 Field Name: A Field Name: B Field Name: C Field Name: D Field Name: E Area (acres): 8.25 Area (acres): 6.75 Area (acres): 13.6 Area (acres): 3.5 Area (acres): 4.7 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? [I YES ❑ NO Field Loaded? ❑ YES ❑ No Field Loaded? ❑ YES No Field Loaded? YES E NO Field Loaded? ❑ YES ❑ NO a G •° Q > a a Q •° ¢ > v a Q 2 Q > a a Q •° Q > o a Q° Q > 0 Q a m a o @ o a d m a o o n a a o o a a a ,a o a ° a a o Q Nd C J Z E I`d� N C J Z E (�6 d C J Z E N N C J O Z d f�9 d aL-� J Z > U > 0 a s U > C 7 a 3 U > C 7 a U > C E D a E U > C E a o a� v o av 0 v o v > o v o p v > > > a� > a�j > av Month gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac I Ibs/ac gal mg/L Ibs/ac Ibs/ac July 724,500 20.75 15.2 15.2 724,500 20.75 18.6 18.6 1,800,000 20.75 22.9 22.9 20.75 20.75 August 1,215,000 24.33 29.9 45.1 1,215,000 24.33 36.5 551 2,898,000 24.33 43.2 66.1 24.33 24.33 September 936,000 10.5 9.9 55.0 936,000 10.5 12.1 67.2 1,494,000 10.5 9.6 75.8 10.5 10.5 October 733,500 16.12 12.0 67.0 733,500 16.12 14.6 81.9 900.000 16.12 8.9 84.7 16.12 16.12 November 706,500 18.66 13.3 80.3 706,500 18.66 16.3 98.1 0 18.66 0.0 84.7 18.66 18.66 December 769,500 16.31 12.7 93.0 769,500 16.31 15.5 113.6 360,000 16.31 3,6 88.3 16.31 16.31 January 580,500 11.05 6.5 99.5 580,500 11_05 7.9 121.6 324,000 11.05 2.2 90.5 11.05 11.05 February 540,000 15.48 8.5 107.9 540,000 15.48 10.3 131.9 1,224,000 15.48 11.6 102.1 15.48 15.48 March 706,500 10.89 7.8 115.7 715,500 10.89 9.6 141.5 1,908,000 10.89 12.7 114.8 10.89 10.89 April 688,500 12.18 8.5 124.2 796,500 12.18 12.0 153.5 1,530,000 12.18 114 126.2 12.18 12.18 May 765,000 14.11 10.9 135.1 765,000 14.11 13.3 166.9 1,512,000 14.11 13.1 139.3 14.11 14.11 June 630,000 8.26 5.3 140 3 810,000 8.26 1 8.3 175.1 112,340,000 8.26 11.9 151.2 8.26 8.26 12 Month Floating PAN Load /„ (Ibs/ac/yr): 140.3 175.1 151.2 0.0 0.0 Annual PAN Load Limit 350 350.00 264.00�� 350.00 350.00 (Ibs/ac/yr): F '0?� c� FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page -�_ of T1 Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2022 Field Name: F Field Name: G Field Name: H Field Name: I Field Name: J Area (acres): 26.53 Area (acres): 47.489 Area (acres): 14.19 Area (acres): 13.58 Area (acres): 58.22 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES NO Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES 0 NO Field Loaded? ❑ YES E NO Field Loaded? ❑ YES E NO a °CL a a a ' a > a0 4) 'a 21 a 0Qa a CL IL D o a CL 9 0 p � Zd a > J Z a G N d _O y _ Z y d 1 C �. R L O J Z E mc U J ' a E a L C -JE c a c JE ' a o O Ua � o > o 2 U a 2 o > O 2 a o c > jO a o i s 0 O U a > > > > > Month I ga, mg/L 20.75 lbs/ac 35.7 Ibs/ac 35.7 gal 9,570,000 I mg/L 20.75 Ibs/ac 34.9 1 Ibs/ac 34.9 gal 1,266,000 mg/L 20.75 Ibs/ac 15.4 Ibs/ac 15.4 gal 1,662,500 mg/L 20.75 Ibs/ac 21.2 Ibs/ac 21.2 gal 8,207,500 mg/L 20.75 Ibs/ac 24.4 Ibs/ac 24.4 July 7,474,Uu0 August 5,037,000 24.33 38.5 74.2 4,140,000 24.33 17.7 52.6 1,452,000 24.33 20.8 36.2 1,125,000 24.33 16.8 38.0 8,918,000 24.33 31.1 55.5 September 4,071,000 10.5 13.4 87.7 9,960,000 10.5 18.4 70.9 1,506,000 10.5 9.3 45.5 650,000 10.5 4.2 42.2 8,942,500 10.5 13.5 68.9 October 4,577,000 16.12 23.2 110.9 9,120,000 16.12 25.8 96.7 1,080,000 16.12 10.2 55.7 625,000 16.12 6.2 48.4 9,824,500 16.12 22.7 91.6 November 4,301,000 18.66 25.2 136.1 9,090,000 18.66 29.8 126.5 858,000 18.66 9.4 1 65.1 1,525,000 18.66 17.5 65.9 7,325,000 18.66 19.6 111.2 December 4,646,000 16.31 23.8 159.9 9,480,000 16.31 27.2 153.7 930,000 16.31 8.9 74.1 2,037,500 16.31 20.4 86.3 6,541,000 16.31 15.3 126.5 January 4,669,000 11.05 16.2 1 176.1 8,760,000 11.05 17.0 170.7 768,000 11.05 5.0 79.0 1,150,000 11.05 7.8 94.1 7,962,500 11.05 12.6 139.1 February 3,059,000 15.48 14.9 191.0 7,140,000 15.48 19.4 190.1 792,000 15.48 7.2 86.2 1,587,500 15.48 15.1 109.2 6,566,000 15.48 14.6 153.6 March 4,025,000 10.89 13.8 204.8 8,700,000 10.89 16.6 206.7 1,074,000 10.89 6.9 93.1 2,237,500 10.89 15.0 124.1 6,590,500 10.89 10.3 163.9 April 552,000 12.18 2.1 206.9 19,000,000 12.18 19.3 226.0 1,434,000 12.18 10.3 103.4 2,050,000 12.18 15.3 139.5 7,521,500 12.18 13.1 177.0 May 4,554,000 14.11 20.2 227.1 18,280,000 1 14.11 20.5 246.5 900,000 14.11 7.5 110.9 2,250,000 14.11 19.5 159.0 6,517,000 14.11 13.2 190.2 June 4,071,000 8.26 10.6 237.7 2,040,000 8.26 3.0 8.26 5.9 116.8 2,250,000 8.26 11.4 170.4 9,016,000 8.26 10.7 200.9 12 Month Floating PAN Load (Ibs/ac/yr): 237.7 249.5 J249.51,224,000 116.8 170.4 200.9 Annual PAN Load Limit (Ibs/ac/yr): 350 350.00 350.00 350.00 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 3 of I Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2022 Field Name: K Field Name: L Field Name: M Field Name: N Field Name: 0 Area (acres): 9.86 Area (acres): _ 24.94 Area (acres): 23.07 Area (acres): 78.87 Area (acres): 19.9 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES EINO Field Loaded? ` YES F7 NO Field Loaded? ❑ YES EINO Field Loaded? 1 YES F j NO Field Loaded? ❑ YES EINo d Z c Z m Z c Z d Z C Z d Z Z D Z C Z a� a '° a d .io a m B. a y a >� a a° a >� a a- a >� pa, '0 M ,>-,, �° J Q m� >� <p ;? �° J Q m �° M �° J Q m� >�° @ m° J a Q m�T @ >0) 00 J E R V C J j E Z C0) I U C J E Z 1`O V C J E Z C R V C J E Z C,'° V C J E Z > ! C 0 7 a j 0 0- > j 0 a j 0 � a j 0 7 a a V U 0 0 Q V 2 U 0 0 a V 2 U 0 0 a V 2 U 0 0 Q V 2 U gal 3,094,000 mg/L 2015 lbs/ac 21.5 Ibs/ac 21.5 gal 2,832,500 mg/L 20.75 Ibs/ac 21.2 Ibs/ac 21.2 gal 13,200,000 mg/L 20.75 Ibs/ac 29.0 Ibs/ac 29.0 gal 3,060,000 mg/L 20.75 Ibs/ac 26.6 Ibs/ac 26.6 Month gal mg/L Ibs/ac Ih c July 0 20.75 0.0 0.0 August 1,904,000 24.33 39.2 39.2 4,316,000 24.33 35.1 56.6 2,750,000 24.33 24.2 45.4 11,050,000 24.33 28.4 57.4 1,392,000 24.33 14.2 40.8 September 2,031,500 10.5 18.0 57.2 2,665,000 10.5 9.4 65.9 2,475,000 10.5 9.4 54.8 9,999,000 10.5 11.1 68.5 2,796,000 10.5 12.3 53.1 October 1,717,000 16.12 23.4 80.6 3,965,000 16.12 21.4 87.3 2,007,500 16.12 11.7 66.5 9,834,000 16.12 16.8 85.3 2,916,000 16.12 19.7 72.8 November 1,878,500 18.66 29.6 110.3 3,471,000 18.66 21.7 109.0 2,750,000 18.66 18.6 85.1 8,217,000 18.66 16.2 101.5 2,784,000 18.66 21.8 94.6 December 1,173,000 16.31 16.2 126.5 2,600,000 16.31 14.2 123.2 1 1,512,5001 16.31 8.9 94.0 8,052,000 16.31 13.9 115.4 2,472,000 16.31 16.9 1 111.5 January 1,946,500 11.05 18.2 144.7 3,107,000 11.05 11.5 134.6 3,602,500 11.05 14.4 108.4 7,260,000 11.05 8.5 123.8 2,304,000 11.05 10.7 122.1 February 425,000 15.48 5.6 150.2 2,496,000 15.48 12.9 147.6 605,000 15.48 3.4 111.8 8,118,000 15.48 13.3 137.1 2,988,000 15.48 19.4 141.5 March 0 10.89 0.0 150.2 2,756,000 10.89 10.0 157.6 1,430,000 10.89 5.6 117.4 11,385,000 10.89 13.1 150.2 2,832,000 10.89 12.9 154.5 April 1,521,500 12.18 15.7 165.9 3,575,000 12.18 14.6 172.2 0 12.18 0.0 117.4 10,494,000 12.18 13.5 163.8 12,664,000 12.18 13.6 168.1 May 1,088,000 14.11 13.0 178.9 12,652,000 14.11 12.5 184.7 2,860,000 14.11 14.6 132.0 7,392,000 14.11 11.0 174.8 2,304,000 14.11 13.6 181.7 June 11,751,000 1 8.26 12.2 191.1 13,354,000 8.26 9.3 1 193.9 3,300,000 8.26 9.9 1 141.8 1 9,075,000 1 8.26 7.9 1 182.7 112,208,000 1 8.26 7.6 1 189.3 12 Month Floating PAN Load 191.1 193.9 141.8 182.7 189.3 (Ibs/ac/yr): Annual PAN Load Limit 350 350.00 350.00 350.00 350.00 (Ibs/ac/yr): FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page + of 11 Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2022 Field Name: P Field Name: Q Field Name: R Field Name: S Field Name: T Area (acres): 28.64 Area (acres): 23.8 Area (acres): 19.16 Area (acres): 12.74 Area (acres): 6.25 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? [:1 YES NO Field Loaded? ❑ YES E]NO Field Loaded? ❑ YES 0 NO Field Loaded? ❑ YES NO Field Loaded? ❑ YES ❑� NO 9 C C 2 C 'O �o o o °C a o a a a oa n a `C o oa R o ¢a C1 C �� L M J Ez ¢ N" �� �` N m J ¢ C mU >, f0 Sa J ¢ � C �v� �. N J ¢ C R� T <0 J E C cJ 3 a C �� Ez 3 a j �_j Ez 3 a �� Ez 3 a E �� Ez 3 a 3 o > ¢ Q 2 U 3 o > ¢ V p U 3 o C ¢ V p U 3 o C ¢ p U 3 o C ¢ V p U > L) > s/ac > > �j > Month gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ar 3.1 gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac July 5,598,000 20.75 33.8 33.8 420,000 20.75 3.1 720,000 20.75 6.5 6.5 2,666,000 20.75 36.2 36.2 697,500 20.75 19.3 19.3 August 4,734,000 24.33 33.5 67.4 3,465,000 24.33 29.5 32.6 912,000 24.33 9.7 16.2 2,433,500 24.33 38.8 75.0 1,021,500 24.33 33.2 52.5 September 1,548,000 10.5 4.7 72.1 3,585,000 10.5 13.2 45.8 2,892,000 10.5 13.2 29.4 1,875,000 10.5 12.9 87.9 810,000 10.5 11.3 63.8 October 828,000 16.12 3.9 76.0 1,950,000 16.12 11.0 56.8 3,372,000 16.12 23.7 53.0 1,007,500 16.12 10.6 98.5 652,500 16.12 14.0 77.9 November 3,816,000 18.66 20.7 96.7 3,285,000 18.66 21.5 78.3 2,604,000 18.66 21.2 74.2 403,000 18.66 4.9 103.4 517,500 18.66 12.9 90.7 December 3,798,000 16.31 18.0 114.8 2,790,000 16.31 15.9 94.2 2,220,000 16.31 15.8 90.0 1,472,500 16.31 15.7 119.1 868,500 16.31 18.9 109.6 January 3,024,000 11.05 9.7 124.5 2,985,000 11.05 11.6 105.8 2,064,000 11.05 9.9 99.9 1,147,000 11.05 8.3 127.4 675,000 11.05 10.0 119.6 February 4,680,000 15.48 21.1 145.6 3,735,000 15.48 20.3 126.0 1,980,000 15.48 13.3 113.2 1,627,500 15.48 16.5 143.9 585,000 15.48 12.1 131.7 March 3,312,000 10.89 10.5 156.1 3,870,000 10.89 14.8 140.8 2,784,000 10.89 13.2 126.4 1,720,500 10.89 12.3 156.2 679,500 10.89 9.9 141.6 April 3,924,000 12.18 13.9 170.0 4,560,000 12.18 19.5 160.3 3,504,000 12.18 18.6 145.0 1,767,000 12.18 14.1 170.3 774,000 12.18 12.6 154.1 May 3,582,000 14.11 14.7 184.7 3,525,000 14.11 17.4 177.7 2,796,000 14.11 17.2 162.2 1,720,500 14.11 15.9 186.2 666,000 14.11 12.5 166.7 June 3,816,000 8.26 9.2 193.9 3,270,000 8.26 9.5 187.2 2,364,000 8.26 8.5 170.7 1,968,500 8.26 10.6 196.8 630,000 8.26 6.9 173.6 12 Month Floating PAN Load (Ibs/ac/yr): 193.9 187.2 170.7 196.8 173.E Annual PAN Load Limit (Ibs/ac/yr): 350 350.00 350.00 350.00 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 5 of rl Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2022 Field Name: U Field Name: V Field Name: W Field Name: X1 Field Name: X2 Area (acres): 3.65 Area (acres): 14.7 Area (acres): 11.08 Area (acres): 25.83 Area (acres): 11.55 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES [21 NO Field Loaded? ❑ YES [I NO Field Loaded? ❑ YES (] NO Field Loaded? ❑ YES NO Field Loaded? ❑ YES EINO Nn ZQC Z L Z 13 Z Z dZa Z Z � �2 aQ� M � a aa >' �a�a Q � MCL J m •° M °Q � ° 2 Q 'o O ' ° O:+ M a) O n d aC N . � 0 O Of o NJ O Z OZ 3 J -' E 'a E ° J EZ 'a E EZ ' Q E Ea d J EE Q o a M a V U a ° ° Ua Ua °Z Q V ° vaaV ; 0QV2 0; Month gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac July 405,000 20.75 19.2 19.2 3,587,000 20.75 42.2 42.2 2,835,000 20.75 44.3 44.3 0 20.75 0.0 0.0 348,000 20.75 5.2 5.2 August 407,250 24.33 22.6 41.8 2,346,000 24.33 32.4 74.6 2,460,000 24.33 45.1 89.3 3,069,000 24.33 24.1 24.1 1,348,500 24.33 23.7 28.9 September 304,500 10.5 7.3 49.1 2,363,000 10.5 14.1 88.7 2,250,000 10.5 17.8 107.1 3,531,000 10.5 12.0 36.1 1,232,500 10.5 9.3 38.2 October 225,000 16.12 8.3 57.4 2,125,000 16.12 19.4 108.1 1,710,000 16.12 20.7 127.9 3,762,000 16.12 19.6 55.7 1,653,000 16.12 19.2 57.5 November 265,500 18.66 11.3 68.8 2,006,000 18.66 21.2 129.4 1,725,000 18.66 24.2 152.1 3,993,000 18.66 24.1 79.7 1,754,500 18.66 23.6 81.1 December 258,750 16.31 9.6 78.4 2,669,000 16.31 24.7 154.1 213,000 16.31 2.6 154.7 3,630,000 16.31 19.1 98.8 1,595,000 16.31 18.8 99.9 January 220,500 11.05 5.6 84.0 1,955,000 11.05 12.3 166.3 1,725,000 11.05 14.3 169.1 4,026,000 11.05 14.4 113.2 1,769,000 11.05 14.1 114.0 February 297,000 15.48 10.5 94.5 2,176,000 15.48 19.1 185.4 1,920,000 15.48 22.4 191.4 2,738,000 15.48 13.7 126.9 1,783,500 15.48 19.9 134.0 March 342,000 10.89 8.5 103.0 1,802,000 10.89 11.1 196.6 2,025,000 10.89 16.6 208.0 4,290,000 10.89 15.1 142.0 1,580,500 10.89 12.4 146.4 April 274,500 12.18 7.6 110.6 21142,000 12.18 14.8 211.4 1,110,000 12.18 10.2 218.2 3,729,000 12.18 14.7 156.6 1,667,500 12.18 14.7 161.1 May 240,750 14.11 7.8 118.4 2,363,000 14.11 18.9 230.3 0 14.11 0.0 218.2 3,531,000 14.11 16.1 172.7 1,551,500 14.11 15.8 176.9 June 290,250 8.26 5.5 123.9 646,000 8.26 3.0 233.3 300,000 8.26 1.9 220.1 3,333,000 8.26 8.9 181.6 1,464,500 8.26 8.7 185.6 12 Month Floating PAN Load (Ibs/ac/yr): 123.9 233.3 220.1 181.6 185.6 Annual PAN Load Limit (Ibs/ac/yr): 350 350.00 350.00 350.00 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page L, of C Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2022 Field Name: Y Field Name: Z Field Name: Field Name: Field Name: Area (acres): 3.65 Area (acres): 14.7 Area (acres): Area (acres): Area (acres): Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES ❑ No Field Loaded? ❑ YES ❑ No Field Loaded? ❑ YES ❑ No Field Loaded? ❑ D YES ❑ No Field Loaded? ❑ YES ❑ NO m Z Z ¢ Zc ¢ o Z > a Z c ° Z ; Z o ¢¢ z a Zo °c ¢ Z ;Q ao y a % o s e o a ao s ¢7o 0 J -J £ ¢ 0 z, 6 JZ 2J a) . 6 - p JZ ¢ a) �Vd c A M JZ m � z ` d ¢ £ i ¢a C d CCp 0 7¢ a v o v o 0 2 a Uo > > ig/L > > > Month gal mg/L Ibs/ac Ibs/ac gal Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibslac gal mg/L Ibs/ac Ibs/ac July 255,000 20.75 12.1 12.1 20.75 20.75 20.75 20.75 August 506,250 24.33 28.1 40.2 24.33 24.33 24.33 24.33 September 408,750 10.5 9.8 50.0 10.5 10.5 10.5 10.5 October 427,500 16.12 15.7 65.8 16.12 16.12 16.12 16.12 November 495,000 18.66 21.1 86.9 18.66 18.66 18.66 18.66 December 408,750 16.31 15.2 102.1 16.31 16.31 16.31 16.31 January 367,500 11.05 9.3 111.4 11.05 11.05 11.05 11.05 February 311,250 15.48 11.0 122.4 15.48 15.48 15.48 15.48 March 228,750 10.89 5.7 128.1 10.89 10.89 10.89 10.89 April 326,250 12.18 9.1 137.2 12.18 12.18 12.18 12.18 May 401,250 14.11 12.9 150.1 14.11 14.11 14.11 14.11 June 378,750 8.26 7.1 157.3 8.26 8.26 8.26 8.26 12 Month Floating PAN Load (Ibs/ac/yr): 157.3 0.0 0.0 0.0 0.0 Annual PAN Load Limit (Ibs/ac/yr): 350 350.00 ...]ON FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page q of lr� Did the mass loading rates exceed the limits in Attachment B of your permit? [Z Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. IOperator in Responsible Charge (ORC) Certification II Permittee Certification I ORC: Robert Jackson Certification Number: 1008145 Grade: IV OIT Phone Number: 910-359-5275 Has the ORC changed since the previous NDMLR? ❑ Yes [A No Signature By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Permittee: Mountaire Farms Inc Signing Official: David White Signing Official's Title: Director of Processing Phone No.: 910-359-5275 Permit Exp.: 2/28/23 7/1 /22 7/1 /22 Date Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page \ of _r Permit No.: W00000484 Facility Name: Mountalre Farms County: Robeson Month: June Year: 2022 Did irrigation Field Name: A Field Name: B Field Name: C Field Name: D occur Area (acres): 8.2 Area (acres): 6.75 Area (acres): 13.6 Area (acres): 3.5 at this facility? Cover Crop:Coastal/Rye Y a Cover Crop: p� Coastal/Rye e Y Cover Crop: P� Coastal/Rye e Y Cover Crop: P� Coastal/Rye Y e YES NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 78 Weather Freeboard Field Irrigated? YES _j NO Field I rigated?l _ YES _1 NO Field Irrigated? YES 1 NO Field Irrigated? _' YES F11 NO > ° ° U d Y ° a E _ ° 2 U d y R ° N m m w.0 •_ a O N N m y E m ° O a i Q a m °' E i- - rn > c - a O 0 J E rn ° 7 c E o = 0 rZ J d a E d ° O °� i Q ° m E ~ .m _ rn > ,c - -5 p 0 J E rn ° -' ° E 'o = 0 J m° E°r' ° p¢ Q v E �a ~ _ rn - 0 J E rn E o = o J m ° °° Q v E m ~ rn - v 0 E rn E° ;6 = 0 °F in ft ft gal min in in gal min in in gal min in in , d min in in 1 C 98 8 2 C 99 8 3 C 90 8 360,000 600 0.97 010 4 CL 87 8 135,000 900 0.61 0.04 135,000 900 0.74 0.05 5 C 88 8 6 C 90 8 7 C 93 8 8 R 90 1 7 99,000 660 0.44 0.04 99,000 660 0,54 0.05 9 R 91 0.5 7 432,000 720 1.17 0.10 10 C 86 7 90,000 600 0.49 0.05 11 CL 87 7 12 R 92 0.5 7 13 C 99 7 14 C 98 7 15 C 95 6 85,500 570 0.38 0.04 85,500 570 0.47 005 16 R 93 0.3 6 252,000 420 0.68 0.10 17 R 99 0.2 6 18 C 91 6 468,000 780 1,27 0.10 19 C 84 7 20 C 87 7 21 C 91 7 94,500 630 0.42 0.04 94,500 630 0.52 0.05 22 R 100 0.25 7 396,000 660 1.07 0.10 23 C 92 8 24 C 93 8 90,000 600 0.49 0.05 25 C 93 8 117,000 780 0.53 0.04 117,000 780 0.64 0.05 26 C 93 8 27 CL 88 8 99,000 660 0.44 0.04 99,000 660 0,54 0.05 28 CL 89 7 432,000 720 1.17 0.10 291 R 86 1 7 30 CL 91 7 31 Monthly Loading: 630,000 2.83 810,000 4.42 2340000 6.34 0 0.00 12 Month Floating Total (in): 40.16 50.70 i 44.11 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ,�, of C Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 Did irrigation Field Name: E Field Name: F Field Name: G Field Name: H occur Area (acres): ----- 4.7 Area (acres): 26.53 Area (acres): 47.489 Area (acres): 14.19 at this facility? Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye ❑� YES 1 NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 91 Annual Rate (in): 91 Weather Freeboard Field Irrigated? YES NO Field Irrigated? 0 YES NO Field 11 rigated?l YES NO Field Irrigated? ] YES ❑ NO m O d d o O m am > � - °£ 7 E E O @y O a E K O d•v Ed > E E o O @= N�a E•E > Q E v JE E 'E ofrnc0 KE Oa =TJJ °F in ft ft gal min in in gal in in gal min in in gal min in in 1 C 98 8 437,000 570 0.61 006 540,000 540 0.42 0.05 2 C 99 8 3 C 90 8 460,000 600 0.64 0.06 4 CL 87 8 180,000 900 0.47 0.03 5 C 88 8 6 C 90 8 7 C 93 8 8 R 90 1 7 506,000 660 0.70 0.06 132,000 660 0.34 0,03 9 R 91 0.5 7 156,000 780 0.40 0.03 10 C 86 7 460,000 600 0.64 0,06 660.000 660 0.51 0.05 11 CL 87 7 108,000 540 0.28 0.03 12 R 92 0.5 7 13 C 99 7 14 C 98 7 15 C 95 6 437,000 570 0.61 0.06 16 R 93 0.3 6 322,000 420 0.45 0.06 17 R 99 0.2 6 840,000 840 0,65 0.05 18 C 91 6 120,000 600 0.31 0.03 19 C 84 7 20 C 87 7 21 C 91 7 483,000 630 0.67 0.06 22 R 100 0.25 7 132,000 660 0.34 0.03 23 C 92 8 120,000 600 0.31 0.03 24 C 93 8 460,000 600 0.64 0.06 25 C 93 8 156.000 780 0.40 0.03 26 C 93 8 27 CL 88 8 506,000 660 0.70 0.06 120,000 600 0.31 0.03 28 CL 89 7 29 R 86 1 7 30 CL 91 7 31 Monthly Loading: 0 0.00 4,071,000 5.65 2,040,000 1.58 1,224,000 3.18 12 Month Floating Total (in): 0.00 68.08 73.89 34.47 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of ' Permit No.: W00000484 Facility Name: MOuntalre Farms County: Robeson Month: June Year: 2022 Did irrigation occur Field Name: I Field Name: J Field Name: K Field Name: L this facility? Area (acres): Y`« Area (acres): 58.22 - Area (acres): 9.86 Area (acres): 24.94 at Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye ❑� YES ❑ NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 91 Annual Rate (in): 91 Annual Rate (in): 91 Annual Rate (in): 91 Weather Freeboard Field Irrigated? ❑ YES ❑ NO Field Irrigated? YES ❑ NO Field Irrigated? ❑YES ❑ NO Field Irrigated? 0 YES ❑ NO o o Uy N .= d 3 d O. E F o Q •V d a m `�° O N �, m n T `-' �6 Q Q N 0_ ar a d 'Q O Q � Q N O E F, .L - rn T C v 0 J E rn O i C E v X 0 o f6 i J d a E d a O Q � Q v N E H _ rn C `o 0 J E T rn 3 L C E a X O J m 2 2 y a E y a ?0 CL Q a d w E m ~ - rn A C @ a J E rn O` C E X O J co 2 2 m a E d a i0 CL Q E is F•- - rn a 0 0 J E rn E 'v X O O m 2 J °F in ft ft g al min in in gal min in in gal min in in gal min in in 1 C 98 8 237,500 570 0.38 0.04 441,000 540 0.28 0.03 234,000 540 0.35 0.04 2 C 99 8 539,000 660 0.34 0.03 187,000 660 0.70 0,06 286,000 660 0.42 0.04 3 C 90 8 250,000 600 0.40 0.04 490,000 600 0.31 0.03 260,000 600 0.38 0.04 4 CL 87 8 735,000 900 0.46 0.03 255,000 900 0.95 0.06 5 C 88 1 1 8 6 C 90 8 7 C 93 8 588,000 720 0.37 0.03 204,000 720 0,76 0.06 312,000 720 0.46 0.04 8 R 90 1 7 539,000 660 0.34 0.03 9 R 91 0.5 7 300,000 720 0.48 0.04 1 221,000 780 0.83 0.06 338,000 780 0.50 0.04 10 C 86 7 1 539,000 1 660 0.34 0.03 11 CL 87 7 441,000 540 0.28 0.03 234,000 1 540 0.35 0.04 12 R 92 0.5 1 7 13 C 99 7 14 C 98 7 15 C 95 6 237,500 570 0.38 0.04 490,000 600 0.31 0.03 170,000 600 0.63 0.06 260,000 600 0.38 0.04 16 R 93 0.3 6 17 R 99 0.2 6 686,000 840 0.43 0.03 364,000 1 840 0.54 1 0.04 18 C 91 6 325,000 780 0.52 0.04 490,000 600 0.31 0.03 170,000 600 0.63 0.06 260,000 600 0.38 0.04 19 C 84 7 20 C 87 7 21 C 91 7 22 R 100 0.25 7 275,000 660 0.44 0.04 539,000 660 0.34 0.03 187,000 660 0.70 0,06 286,000 660 0.42 0.04 23 C 92 1 1 8 1 1 1 490,000 600 0.31 0.03 24 C 93 8 490,000 600 0.31 0.03 260,000 600 0.38 0.04 251 C 93 8 325,000 780 0.52 0.04 637,000 780 0.40 0.03 221,000 780 0.83 0.06 26 C 93 8 27 CL 88 8 490,000 600 0.31 0.03 260,000 600 0.38 0.04 28 CL 89 7 300,000 720 0.48 0.04 392,000 480 0.25 0.03 136,000 480 0.51 0.06 29 R 86 1 7 30 CL 91 7 31 Monthly Loading: 2,250,000 3.59 9,016,000 5.70PM-1-,751,000 6.54 3,354,000 4.95 12 Month Floating Total (in): 51.91 59.42 VffM 58.49 51.37 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page LA of 4> Permit No.: W00000484 Facility Name: Mountalre Farms County: Robeson Month: June Year: 2022 Did irrigation Field Name: M Field Name: N Field Name: O Field Name: P occur Area (acres): 23.07 Area (acres): 78.87 ---------- Area (acres): 19.9 Area (acres): 28.64 at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: P� Coastal/Rye e Y Cover Crop: p� Coastal/Rye a Y Cover Crop: p� e Coastal/Rye Y ❑ YES ❑ NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 52 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? YES , j NO Field Irrigated? ❑ YES ❑ NO Field Irrigated? YES ❑ No Field Irrigated? ❑✓ YES ❑ No o v U y d Q f4 ° E N r ° a u y a m I O U) t m (n .0 n (p a Q (a � w v m y E °' a O a J Q a ° d E F .` rn > c 'm Q p J E rn c 3 'n m 2 0 J V -o E m a O a i Q v m m E ~ r- _ rn c v Q 0 J E rn C E @ 2 0 J m'a E 2 a D a % Q v m m E is 1- 'o' _ rn m o Q 0 J E rn c E v = 0 J m y E m a ° J Q an d E A F rn _ rn c v Q 0 J E rn T E a m= 0 J � °F in ft ft gal min in in gal min in in gal min in in gal (in 378,000 630 in in 1 C 98 8 252,000 630 0,47 0.04 0,49 0.05 2 C 99 8 605,000 660 0.97 0.09 3 C 90 8 550,000 600 0.88 0.09 660,000 600 0.31 0.03 4 CL 87 8 990,000 900 0,46 0.03 540,000 900 0.69 0.05 5 C 88 8 6 C 90 8 7 C 93 8 792,000 720 0.37 0.03 288,000 720 0.53 0.04 8 R 90 1 7 605,000 660 0.97 0.09 342,000 570 0.44 0.05 9 R 91 0.5 7 858,000 780 0.40 0.03 10 C 86 7 240,000 600 0,44 0.04 11 CL 87 7 594,000 540 0.28 0.03 324,000 540 0.42 0.05 12 R 92 0.5 7 13 C 99 7 495,000 450 0.23 0.03 14 C 98 7 726,000 660 0.34 0.03 264,000 660 0.49 0.04 15 C 95 6 550.000 600 0.88 0.09 288,000 480 0.37 0.05 16 R 93 0.3 6 594,000 540 0.28 0.03 17 R 99 0.2 6 276,000 690 0.51 0.04 18 C 91 6 660,000 600 0.31 0.03 360,000 600 0.46 0,05 19 C 84 7 20 C 87 7 21 C 91 7 360,000 900 0.67 0.04 540,000 900 0.69 0.05 22 R 100 0.25 7 23 C 92 8 550,000 600 0.88 0.09 660,000 600 0.31 0.03 24 C 93 8 216,000 540 0.40 004 324,000 540 0.42 0.05 25 C 93 8 726,000 660 0.34 0.03 26 C 93 8 27 CL 88 8 726,000 660 0.34 0.03 396,000 660 0.51 0.05 28 CL 89 7 440,000 480 0.70 0.09 312,000 780 0.58 0.04 29 R 86 1 7 594,000 540 0.28 0.03 324,000 540 0.42 0.05 30 CL 91 7 31 Monthly Loading: 12 Month Floating Total (in): 3,300,000 rg= 5.27 41.71 9,075,000 4.24 53.27 2,208,000 4.09 56.85 3,816,000 4.91 54.86 l FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W00000484 Facility Name: MOuntalre Farms County: Robeson Month: June Year: 2022 Did irrigation Field Name: Q Field Name: R Field Name: S Field Name: T occur Area (acres): - 23.8 Area (acres): 1916 Area (acres): 12.74 Area (acres): 6.25 at this facility? Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye J YE S LINO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? YES ;i NO Field Irrigated? I YES LINO Field Irrigated? _- YES NO Field Irrigated? 0 YES ❑ NO >. p O U t d f0 m CL E N C f0 .. a U y f� y m ¢ U ]_ a a 0 L E d o O O_ J Q d ��., F •� _ >. C @@ O J E m 3 6 C E N 2 0 J m -a E N a O % Q N d E ~� _ M >, C R m O J E m =` C E o° cx0 2 0 J m o E d 3 a O O- Q y 01 E m ~ _ rn ), c m o 0 J E m 7 -' C E o fx0 2 0 cC J m y E y a O O. % Q v N O E m ~ C _ M C v 0 J E m O �` C E 3 v cx0 2 0 J °F in ft ft gal min in in gal min in gal min in in gal min in in 1 C 98 8 315,000 630 0.49 0.05 2 C 99 8 3 C 90 8 4 CL 87 8 360,000 900 0.69 0.05 135,000 900 0.80 0.05 5 C 88 8 6 C 90 8 7 C 93 8 360,000 720 0.56 0,05 288,000 720 0.55 0.05 108,000 720 0.64 0.05 8 R 90 1 7 294.500 570 0.85 0.09 9 R 91 0.5 7 117,000 780 0.69 0.05 10 C 86 7 300,000 600 0.46 0.05 240,000 600 OA6 0.05 11 CL 87 7 1 279,000 540 0.81 0.09 12 R 92 0.5 7 13 C 99 7 14 C 98 7 330,000 660 0.51 0.05 264,000 660 0.51 0.05 341,000 660 0.99 0.09 15 C 95 6 240.000 480 0.37 0.05 16 R 93 0.3 6 81,000 540 0.48 0.05 17 R 99 0.2 6 345,000 690 0.53 0.05 276,000 690 0.53 0.05 18 C 91 6 310,000 600 0.90 0.09 19 C 84 7 20 C 87 7 21 C 91 7 450,000 900 0.70 0.05 360,000 900 0.69 0.05 22 R 100 0.25 7 23 C 92 8 90,000 600 0.53 0.05 24 C 93 8 270,000 540 0.42 0.05 25 C 93 8 264,000 660 0.51 0.05 341,000 660 0.99 0.09 26 C 93 8 27 CL 88 8 99,000 660 0.58 0.05 28 CL 89 7 390,000 780 0.60 0.05 312,000 780 0.60 0.05 403,000 780 1.17 0.09 291 R 86 1 7 270,000 540 0.42 0.05 30 CL 91 7 31 L630,000 Monthly Loading: 3,270,000 5.06]�2,364,000�_74 ' 1,968.500 5.69 3.71 12 Month Floating Total (in):1 59.13 54.23 5727 50.54 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 1s of c S Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 Did irrigation Field Name: U ------- Field Name: V Field Name: W Field Name: X1 occur Area (acres): 3.65 Area (acres): 14.7 Area (acres): 11.08 Area (acres): 25.83 at this facility? Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye YES n NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? 17! YES [] NO Field Irrigated? =1 YES F1 NO Field Irrigated? _ `, YES _; NO Field Irrigated? YES ❑ NO f6 o o = m y m E E d o Q v N fn m a m � .e - Q. CL O m u) w m a E �' _ a 0 Q. Q d E ~ •� _ rn > c m 0 J E T rn c E _'v N 2 0 J d o E °' _ a Q Q m m _ m E ~ _ rn c v 0 J E T rn c_ c E �'a 2 0 J d v E °' _ a Q � Q m ;; E m ~ _ rn c v 0 J E T rn c E a v M 2 0 J m o E 2 _3 a O Q 1 Q M E F _ m �v cu 0 .J E T rn v E �cu cc= 0 J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 98 8 2 C 99 8 627,000 570 0.89 0.09 3 C 90 8 300,000 600 1.00 0.10 4 CL 87 8 67,500 900 0.68 0.05 5 C 88 8 6 C 90 8 7 C 93 8 8 R 90 1 7 42,750 570 0.43 0.05 9 R 91 0.5 7 858,000 780 1.22 0.09 10 C 86 7 11 CL 87 7 40,500 540 0.41 0.05 12 R 92 0.5 7 13 C 99 7 255,000 450 0.64 0.09 14 C 98 7 15 C 95 6 16 R 93 0.3 6 594,000 540 0.85 0.09 17 R 99 0.2 6 391,000 690 0.98 0.09 18 C 91 6 45,000 600 0.45 0.05 19 C 84 7 20 C 87 7 21 C 91 7 22 R 100 0.25 7 23 C 92 8 45,000 600 0.45 0.05 660,000 600 0.94 0.09 24 C 93 8 25 C 93 8 26 C 93 8 27 CL 88 8 49,500 660 0.50 0.05 28 CL 89 7 29 R 86 1 7 594,000 540 0.85 0.09 30 CL 91 7 31 Monthly Loading: 290,250 2.93 646,000 1.62 300,000 1.00 3,333,000 4.75 12 Month Floating Total (in): 35.60 65.r 67.11 56.54 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page -3- of c� Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 Did irrigation occur Field Name: X2 Field Name: Y Field Name: Z Field Name: Area (acres): 11.55 Area (acres): 3.21 Area (acres): ------- 7.1 Area (acres): at this facility? Cover Crop:Coastal/Rye Y a Cover Crop: p� Coastal/Rye e Y Cover Crop: p� Coastal/Rye e Y Cover Crop: p� e Coastal/Rye Y YES ( NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? ❑ YES ❑ NO Field Irrigated? ❑: YES NO Field Irrigated? ❑ YES [] NO Field Irrigated? ❑ YES ❑ NO o o U ami a) E F c ° n. m d aO M ,i, •� E 2 Q a)a rn >c J E a S 2J O % _ J E > 0 J E O > Q _ J E c = J a E a > m m J2 E rnc Ea 0rO> J °F in ft ftv g al min in in gal min in in gal min in in gal min in in 1 C 98 8 2 C 99 8 275,500 570 0.88 0,09 71,250 570 0.82 0.09 3 C 90 8 4 CL 87 8 5 C 88 8 6 C 90 8 7 C 93 8 8 R 90 1 7 9 R 91 0.5 7 377,000 780 1,20 0.09 97.500 780 1.12 0.09 10 C 86 7 11 CL 87 7 12 R 92 0.5 7 13 C 99 7 14 C 98 7 15 C 95 6 16 R 93 0.3 6 261,000 540 0.83 0.09 67,500 540 0.77 0.09 17 R 99 0.2 6 18 C 91 6 19 C 84 7 20 C 87 7 21 C 91 7 221 R 100 0.25 7 23 C 92 8 290,000 600 0.92 0.09 75,000 600 0.86 0.09 24 C 93 8 25 C 93 8 26 C 93 8 27 CL 88 8 281 CL 89 7 29 R 86 1 7 261,000 540 0.83 0.09 67,500 540 0.77 0.09 30 91 1 17 31 Monthly Loading: 1,464,500 E467 378,750 4.35 0 0.00 0 0.00 12 Month Floating Total (in): , 51.80 0.00 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page '3 of'? Did the application rates exceed the limits in Attachment B of your permit? ❑ Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? n Compliant ❑ Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? E Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? ❑ Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑ Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification ORC: Robert Jackson Certification No.: 1008145 Grade: IV OIT Phone Number: 910-359-5275 Has the ORC changed since the previous NDAR-1? Lj Yes No 7/1/2 Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Permittee Certification Permittee: Mountaire Farms Signing Official: David White Signing Official's Title: Director Of Processing Phone Number: 910-359-5275 Permit Exp. V zz/v t G 2/28/23 7/ 1 /221 Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 PPI: 005 Flow Measuring Point: ❑ Influent ❑ Effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑' Groundwater Lowering ❑ Surface Water Parameter Code —► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 >, m Q F ~ O C Ct £" H to U 0 O O LL = CL j y C 0 O m @ O E E Q d w, c v O a 'o ~ 7 N rn u 2 m "= LL U L R C d Y o :�+ Z o � ID y Z M m J _ELO E U i .@., C O a F- p a- to O U Y Z C c_ N 24-hr hrs GPD su mg/L mg/L mg -IL mg/L #1100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0600 10 6,110 2 0600 10 582 3 0600 10 8,883 4 0800 4 0 5 7,069 6 0600 10 4,761 7 0600 10 4,673 8 0600 10 2,005 9 0600 10 20,766 10 0600 10 71,597 11 0800 4 0 12 0 13 0600 10 12,861 14 0600 10 11,746 15 0600 10 10,312 161 0600 10 15,200 17 0600 10 15,379 18 0800 4 0 19 65,893 20 0600 10 80,900 21 0600 10 14,491 22 0600 10 11,336 23 0600 10 10,357 24 0600 10 0 25 0800 4 0 26 21,531 27 0600 10 6,649 28 0600 10 4,260 29 0600 10 5,403 301 0600 10 4,042 31 Average: 13,894 Daily Maximum: 80,900 Daily Minimum: 0 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit:I 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of N Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑� Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes D No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 7/1/2022 7/1/2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page I of Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 PPI: 004 Flow Measuring Point: ❑ Influent [:�] Effluent ❑ No flow generated Parameter Monitoring Point: [ ' Influent I_ Effluent Groundwater Lowering [] Surface water Parameter Code —► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 Q N O F O C N _ d H N O 3 tL 2 �' N m m p E Q _ 16 C 'O H N fn _ M 8 li O U L Ca d o Y •� o Z t— jp .J Z a � 2 E U N 2 fp r a F y r a j p to 7 U Y Z U c n1 24-hr hrs GPD su mg/L mg/L mg/L mg/L #/100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0600 10 2,870,000 7.1 2 0600 10 2,970,000 6.7 48 3 0600 10 2,880,000 6.7 4 0800 4 320,000 5 290,000 6 0600 10 2,730,000 6.8 7 0600 10 2,820,000 7.1 8 0600 10 2,910,000 7 9 0600 10 2,900,000 7.2 10 0600 10 2,930,000 7 11 0800 4 515,000 12 225,000 13 0600 10 2,730,000 7.3 14 0600 10 2,830,000 6.8 151 0600 10 2,840,000 6.9 16 0600 10 2,800,000 6.9 17 0600 10 2,980,000 6.4 18 0800 4 310,000 19 430,000 20 0600 10 2,850,000 6.9 21 0600 10 2,940,000 7.1 22 0600 10 2,960,000 7 23 0600 10 2,860,000 7.2 24 0600 10 3,040,000 7.2 25 0800 4 370,000 26 440,000 27 0600 10 2,720,000 7.3 28 0600 10 2,840,000 7.8 29 0600 10 2,970,000 7 30 0600 10 2,810,000 7.2 31 Average: 2,202,667 48.00 Daily Maximum: 3,040,000 7.80 48.00 Daily Minimum: 225,000 6.40 48.00 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page �_ of .2- Sampling Person(s) Certified Laboratories Name: Robert Jackson Name: Cameron Testing Name: Joshua Simmons Name: TBL Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 0 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Official's Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ yes [I] No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 1 7/1 /2022 7/ 1 /2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of_X_ Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 PPI: 003 Flow Measuring Point: Influent Effluent ❑ No flow generated Parameter Monitoring Point: ❑Influent Effluent ❑Groundwater Lowering 1_1 Surface Water Parameter Code -i 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 cu 0 la O Q E U f- O C O d E d F y U O 3 ° LL a E (� m O m 16 CO E E Q M C a o a'o F N !n rn _ £ M O aa)i LL. O U t N Y 2 - 10 Z o = Z v ,J 7 E U N ` f0 0 o a F O a O a O C 7 N U Z c_ N 24-hr hrs GPD su mg/L mg/L mg/L mg/L #1100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0600 10 25,300 7.1 2 0600 10 25,000 6.7 3 0600 10 24,800 6.7 4 0800 4 7,800 5 8,400 6 0600 10 24,000 6.8 7 0600 10 25,900 7.1 8 0600 10 27,200 7 9 0600 10 25,300 7.2 10 0600 10 24,300 7 11 0800 4 7,800 12 17,400 13 0600 10 24,700 7.3 14 0600 10 24,900 6.8 15 0600 10 24,900 6.9 16 0600 10 24,100 6.9 17 0600 10 24,800 6.4 18 0800 4 7,800 19 6,700 20 0600 10 24,600 6.9 21 0600 10 25,900 7.1 221 0600 10 25,600 7 23 0600 10 26,500 7.2 24 0600 10 24,300 7.2 25 0800 4 6,700 26 9,700 27 0600 10 24,100 7.3 28 0600 10 25,400 7.8 29 0600 10 26,400 7 30 0600 10 25,500 7.2 31 Average: 20,860 Daily Maximum: 27,200 7.80 Daily Minimum: 6,700 6,40 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit:I 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly F2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -,;L- of Sampling Person(s) Certified Laboratories Name: Robert Jackson Name: Cameron Testing Name: Joshua Simmons Name: TBL Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 0 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective dUrrUr 1kbj ld RCr 1. MUdUrI duUIUUr Idi Sr rCCrS rr Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes 0 No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 7/1 /2022 7/1 /2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -I- of Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 PPI: 002 Flow Measuring Point: I Influent ❑ Effluent L J No flow generated Parameter Monitoring Point: Influent ❑ Effluent ❑ Groundwater towering ❑ Surface Water Parameter Code 0. 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 Q E 0 c F N O ° a ° c rn O m c E E Q N o Q.o I— N (n N E m °= V- ° U t m Y 2 ^-' ° Z m b Z m J E E U a O o a t... ON r a E N E u Z N 24-hr hrs GPD su mg/L mg/L mg/L mg/L #1100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0600 10 2,870,000 7.1 2 0600 10 2,970,000 6.7 3 0600 10 2,880,000 6.7 4 0800 4 320,000 5 290,000 6 0600 10 2,730,000 6.8 7 0600 10 2,820,000 7.1 8 0600 10 2,910,000 7 9 0600 10 2,900,000 7.2 10 0600 10 2,930,000 7 11 0800 4 515,000 12 225,000 13 0600 10 2,730,000 7.3 141 0600 10 2,830,000 6.8 15 0600 10 2,840,000 6.9 16 0600 10 2,800,000 6.9 17 0600 10 2,980,000 6.4 18 0800 4 310,000 19 430,000 201 0600 1 10 2,850,000 6.9 21 0600 10 2,940,000 7.1 22 0600 10 2,960,000 7 23 0600 10 2.860,000 7.2 24 0600 10 3,040,000 7.2 25 0800 4 370,000 26 440,000 27 0600 10 2,720,000 7.3 28 0600 10 2,840,000 7.8 29 0600 10 2,970,000 7 30 0600 10 2,810,000 7.2 31 Average: 2,202,667 Daily Maximum: 3,040,000 7.80 Daily Minimum: 225,000 6.40 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _kI, of, Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑J Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Official's Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes 0 No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 7/1 /2022 7/1 /2022 � j Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page_ of Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 PPI: 001 Flow Measuring Point: nfluent Effluent E No flow generated Parameter Monitoring Point: [ Influent '_1 Effluent L Groundwater Lowering ] Surface Water Parameter Code -► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 p > U 0 C d E (D p N U 0 3 LL a fN c m 0 O m p E E a _ l0 C 'O a 0 _ /6 8 ti - U L M d C) Y Q 'z 0 *_ z D 7 a M V) ` _ f0 r Fo C o a > o N > m U Y u z U N 24-hr hrs GPD su mg/L mg/L mg/L mg/L #/100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0600 10 2,870,000 7.1 2 0600 10 2,970,000 6.7 2.97 19.7 20.7 22.7 1040 22.5 0.05 0.001 0,0001 0.69 146 4.09 0,0109 0.0462 3 0600 10 2,880,000 6.7 4 0800 4 320,000 5 290,000 6 0600 10 2,730,000 6.8 7 0600 10 2.820,000 7.1 8 0600 10 2,910,000 7 9 0600 10 2,900,000 7.2 32.9 6.34 27.3 8560 19 0.05 0.735 10 0600 10 2,930,000 7 11 0800 4 515,000 121 225,000 13 0600 10 2,730,000 7.3 14 0600 10 2,830,000 6.8 15 0600 10 2,840,000 6.9 16 0600 10 2,800,000 6.9 17 0600 10 2,980,000 6.4 181 0800 4 310.000 19 430,000 20 0600 10 2.850,000 6.9 21 0600 10 2.940,000 7.1 22 0600 10 2,960.000 7 23 0600 10 2,860,000 7.2 241 0600 10 3,040,000 7.2 25 0800 4 370,000 26 440,000 27 0600 10 2,720,000 7.3 28 0600 10 2,840,000 7.8 29 0600 10 2,970,000 7 30 0600 10 2,810,000 7.2 31 Average: 2,202,667 2.97 26.30 13.52 25.00 2.983.69 20.75 0.05 0.00 0.00 0.71 146.00 4.09 0,01 0.05 Daily Maximum: 3,040,000 7,80 2.97 32.90 20.70 27.30 8,560.00 22.50 0.05 0.00 0.00 0.74 146.00 4.09 0.01 0.05 Daily Minimum: 225,000 6.40 2.97 19.70 6.34 22.70 1,040.00 19.00 0.05 0.00 0.00 0.69 146.00 4.09 0.01 0.05 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly I Monthly 2xMonthly 2xMonthly I 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON DISCHARGE MONITORING REPORT (NDMR) Page.„ of Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2022 PP 00, Flow Measuring Point: - Influent Effluent No flow generated Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑ Groundwater Lowering ❑ Surface water Parameter Code --► 50050 01042 00931 WQ09 70300 50060 00940 00600 o ' N U H 0 O c O E F Ua O LL a7 a p U o E p -0 p iC o(n tnQ d o � a) 10 O a M QZ a)m ) N p p ►- y to 6 a, c p m e �U a)c U N o Z 24-hr hrs GPD mg/L Ratio mg/L mg/L mg/L mg/L mg/L 1 0600 10 2,870,000 0.29 2 0600 10 2,970,000 0.00904 13,21 10.76 0 22.5 3 0600 10 2,880,000 0 4 0800 4 320,000 0 5 290,000 0 6 0600 10 2,730,000 0 7 0600 10 2,820,000 0.31 8 0600 10 2,910,000 0.14 9 0600 10 2,900,000 5.75 0.19 19 10 0600 10 2,930,000 0.26 11 0800 4 515,000 0 121 225,000 0 13 0600 10 2,730,000 0 14 0600 10 2,830,000 0 15 0600 10 2,840,000 0.16 16 0600 10 2,800,000 0.89 17 0600 10 2,980,000 0.3 181 0800 4 310,000 0 19 430,000 0 20 0600 10 2.850,000 0.61 21 0600 10 2,940,000 0.43 22 0600 10 2,960,000 0.22 23 0600 10 2,860,000 0.57 241 0600 10 3,040,000 0.15 25 0800 4 370,000 0 26 440,000 0 27 0600 10 2,720,000 0.21 28 0600 10 2,840,000 0.49 29 0600 10 2,970,000 0.16 30 0600 10 2,810,000 0.12 31 Average: #REF! #REF! 13.21 8.26 0.18 20.75 Daily Maximum: #REF! #REF! 13.21 10.76 0.89 22.50 Daily Minimum: #REF! #REF! 13.21 5.75 0.00 19.00 Sampling Type: Recorder Grab Calculated Calculated Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: 1 Continuous Monthly Monthly I 2xMonthly 3xYearly 5xWeek 3xYear 2x Month FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -3 of Sampling Person(s) Certified Laboratories Name: Robert Jackson Name: Cameron Testing Name: Joshua Simmons Name: TBL Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑� Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes El No Phone Number: 10-359-5275 Permit Expiration: 2/28/2023 7/1 /2022 7/1 /2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617