HomeMy WebLinkAboutWQ0000484_Monitoring - 06-2022_20220718FORM NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page - of
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: June
Year: 2022
Field Name:
A
Field Name:
B
Field Name:
C
Field Name:
D
Field Name:
E
Area (acres):
8.25
Area (acres):
6.75
Area (acres):
13.6
Area (acres):
3.5
Area (acres):
4.7
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
[I YES ❑ NO
Field Loaded?
❑ YES ❑ No
Field Loaded?
❑ YES No
Field Loaded?
YES E NO
Field Loaded?
❑ YES ❑ NO
a
G •°
Q
> a
a
Q •°
¢
> v
a
Q 2
Q
> a
a
Q •°
Q
> o
a
Q°
Q
> 0
Q
a m
a o
@ o
a
d m
a o
o
n
a
a o
o
a
a
a ,a
o
a
°
a a
o
Q
Nd
C J
Z
E
I`d� N
C J
Z
E
(�6 d
C J
Z
E
N N
C J
O Z
d
f�9 d
aL-� J
Z
>
U
>
0
a
s
U
> C
7 a
3
U
> C
7 a
U
> C
E
D a
E
U
> C
E
a
o
a�
v
o
av
0
v
o
v
>
o
v
o
p
v
>
>
>
a�
>
a�j
>
av
Month
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
I Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
July
724,500
20.75
15.2
15.2
724,500
20.75
18.6
18.6
1,800,000
20.75
22.9
22.9
20.75
20.75
August
1,215,000
24.33
29.9
45.1
1,215,000
24.33
36.5
551
2,898,000
24.33
43.2
66.1
24.33
24.33
September
936,000
10.5
9.9
55.0
936,000
10.5
12.1
67.2
1,494,000
10.5
9.6
75.8
10.5
10.5
October
733,500
16.12
12.0
67.0
733,500
16.12
14.6
81.9
900.000
16.12
8.9
84.7
16.12
16.12
November
706,500
18.66
13.3
80.3
706,500
18.66
16.3
98.1
0
18.66
0.0
84.7
18.66
18.66
December
769,500
16.31
12.7
93.0
769,500
16.31
15.5
113.6
360,000
16.31
3,6
88.3
16.31
16.31
January
580,500
11.05
6.5
99.5
580,500
11_05
7.9
121.6
324,000
11.05
2.2
90.5
11.05
11.05
February
540,000
15.48
8.5
107.9
540,000
15.48
10.3
131.9
1,224,000
15.48
11.6
102.1
15.48
15.48
March
706,500
10.89
7.8
115.7
715,500
10.89
9.6
141.5
1,908,000
10.89
12.7
114.8
10.89
10.89
April
688,500
12.18
8.5
124.2
796,500
12.18
12.0
153.5
1,530,000
12.18
114
126.2
12.18
12.18
May
765,000
14.11
10.9
135.1
765,000
14.11
13.3
166.9
1,512,000
14.11
13.1
139.3
14.11
14.11
June
630,000
8.26
5.3
140 3
810,000
8.26 1
8.3
175.1 112,340,000
8.26
11.9
151.2
8.26
8.26
12 Month Floating PAN Load
/„
(Ibs/ac/yr):
140.3
175.1
151.2
0.0
0.0
Annual PAN Load Limit
350
350.00
264.00��
350.00
350.00
(Ibs/ac/yr):
F '0?� c�
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page -�_ of T1
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: June
Year: 2022
Field Name:
F
Field Name:
G
Field Name:
H
Field Name:
I
Field Name:
J
Area (acres):
26.53
Area (acres):
47.489
Area (acres):
14.19
Area (acres):
13.58
Area (acres):
58.22
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
❑ YES NO
Field Loaded?
❑ YES ❑ NO
Field Loaded?
❑ YES 0 NO
Field Loaded?
❑ YES E NO
Field Loaded?
❑ YES E NO
a
°CL
a
a
a
'
a
>
a0
4) 'a
21
a
0Qa
a
CL
IL
D
o
a
CL
9
0
p
�
Zd
a
>
J
Z
a
G
N
d
_O
y
_
Z
y
d
1 C
�. R
L O
J
Z
E
mc
U
J
' a
E a
L C
-JE
c
a
c JE
' a
o
O
Ua
�
o
>
o
2
U a
2
o
>
O
2
a
o
c
> jO
a
o
i s
0
O
U a
>
>
>
>
>
Month I
ga,
mg/L
20.75
lbs/ac
35.7
Ibs/ac
35.7
gal
9,570,000
I mg/L
20.75
Ibs/ac
34.9
1 Ibs/ac
34.9
gal
1,266,000
mg/L
20.75
Ibs/ac
15.4
Ibs/ac
15.4
gal
1,662,500
mg/L
20.75
Ibs/ac
21.2
Ibs/ac
21.2
gal
8,207,500
mg/L
20.75
Ibs/ac
24.4
Ibs/ac
24.4
July
7,474,Uu0
August
5,037,000
24.33
38.5
74.2
4,140,000
24.33
17.7
52.6
1,452,000
24.33
20.8
36.2
1,125,000
24.33
16.8
38.0
8,918,000
24.33
31.1
55.5
September
4,071,000
10.5
13.4
87.7
9,960,000
10.5
18.4
70.9
1,506,000
10.5
9.3
45.5
650,000
10.5
4.2
42.2
8,942,500
10.5
13.5
68.9
October
4,577,000
16.12
23.2
110.9
9,120,000
16.12
25.8
96.7
1,080,000
16.12
10.2
55.7
625,000
16.12
6.2
48.4
9,824,500
16.12
22.7
91.6
November
4,301,000
18.66
25.2
136.1
9,090,000
18.66
29.8
126.5
858,000
18.66
9.4
1 65.1
1,525,000
18.66
17.5
65.9
7,325,000
18.66
19.6
111.2
December
4,646,000
16.31
23.8
159.9
9,480,000
16.31
27.2
153.7
930,000
16.31
8.9
74.1
2,037,500
16.31
20.4
86.3
6,541,000
16.31
15.3
126.5
January
4,669,000
11.05
16.2
1 176.1
8,760,000
11.05
17.0
170.7
768,000
11.05
5.0
79.0
1,150,000
11.05
7.8
94.1
7,962,500
11.05
12.6
139.1
February
3,059,000
15.48
14.9
191.0
7,140,000
15.48
19.4
190.1
792,000
15.48
7.2
86.2
1,587,500
15.48
15.1
109.2
6,566,000
15.48
14.6
153.6
March
4,025,000
10.89
13.8
204.8
8,700,000
10.89
16.6
206.7
1,074,000
10.89
6.9
93.1
2,237,500
10.89
15.0
124.1
6,590,500
10.89
10.3
163.9
April
552,000
12.18
2.1
206.9
19,000,000
12.18
19.3
226.0
1,434,000
12.18
10.3
103.4
2,050,000
12.18
15.3
139.5
7,521,500
12.18
13.1
177.0
May
4,554,000
14.11
20.2
227.1
18,280,000 1
14.11
20.5
246.5
900,000
14.11
7.5
110.9
2,250,000
14.11
19.5
159.0
6,517,000
14.11
13.2
190.2
June 4,071,000 8.26
10.6
237.7
2,040,000
8.26
3.0
8.26
5.9
116.8
2,250,000
8.26
11.4
170.4
9,016,000
8.26
10.7
200.9
12 Month Floating PAN Load
(Ibs/ac/yr):
237.7
249.5
J249.51,224,000
116.8
170.4
200.9
Annual PAN Load Limit
(Ibs/ac/yr):
350
350.00
350.00
350.00
350.00
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 3 of I
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: June
Year: 2022
Field Name:
K
Field Name:
L
Field Name:
M
Field Name:
N
Field Name:
0
Area (acres):
9.86
Area (acres):
_ 24.94
Area (acres):
23.07
Area (acres):
78.87
Area (acres):
19.9
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
❑ YES EINO
Field Loaded?
` YES F7 NO
Field Loaded?
❑ YES EINO
Field Loaded?
1 YES F j NO
Field Loaded?
❑ YES EINo
d
Z c
Z
m
Z c
Z
d
Z C
Z
d
Z
Z
D
Z C
Z
a�
a
'°
a
d .io
a
m
B.
a y
a
>�
a
a°
a
>�
a
a-
a
>�
pa,
'0
M
,>-,,
�°
J
Q
m�
>�
<p
;?
�°
J
Q
m
�°
M
�°
J
Q
m�
>�°
@
m°
J
a
Q
m�T
@
>0)
00
J
E
R V
C J
j
E Z
C0)
I U
C J
E Z
1`O V
C J
E Z
C
R V
C J
E Z
C,'°
V
C J
E Z
>
! C
0
7 a
j
0
0-
>
j
0
a
j
0
� a
j
0
7 a
a V
U
0
0
Q V
2
U
0
0
a V
2
U
0
0
a V
2
U
0
0
Q V
2
U
gal
3,094,000
mg/L
2015
lbs/ac
21.5
Ibs/ac
21.5
gal
2,832,500
mg/L
20.75
Ibs/ac
21.2
Ibs/ac
21.2
gal
13,200,000
mg/L
20.75
Ibs/ac
29.0
Ibs/ac
29.0
gal
3,060,000
mg/L
20.75
Ibs/ac
26.6
Ibs/ac
26.6
Month
gal
mg/L
Ibs/ac
Ih c
July
0
20.75
0.0
0.0
August
1,904,000
24.33
39.2
39.2
4,316,000
24.33
35.1
56.6
2,750,000
24.33
24.2
45.4
11,050,000
24.33
28.4
57.4
1,392,000
24.33
14.2
40.8
September
2,031,500
10.5
18.0
57.2
2,665,000
10.5
9.4
65.9
2,475,000
10.5
9.4
54.8
9,999,000
10.5
11.1
68.5
2,796,000
10.5
12.3
53.1
October
1,717,000
16.12
23.4
80.6
3,965,000
16.12
21.4
87.3
2,007,500
16.12
11.7
66.5
9,834,000
16.12
16.8
85.3
2,916,000
16.12
19.7
72.8
November
1,878,500
18.66
29.6
110.3
3,471,000
18.66
21.7
109.0
2,750,000
18.66
18.6
85.1
8,217,000
18.66
16.2
101.5
2,784,000
18.66
21.8
94.6
December
1,173,000
16.31
16.2
126.5
2,600,000
16.31
14.2
123.2 1
1,512,5001
16.31
8.9
94.0
8,052,000
16.31
13.9
115.4
2,472,000
16.31
16.9
1 111.5
January
1,946,500
11.05
18.2
144.7
3,107,000
11.05
11.5
134.6
3,602,500
11.05
14.4
108.4
7,260,000
11.05
8.5
123.8
2,304,000
11.05
10.7
122.1
February
425,000
15.48
5.6
150.2
2,496,000
15.48
12.9
147.6
605,000
15.48
3.4
111.8
8,118,000
15.48
13.3
137.1
2,988,000
15.48
19.4
141.5
March
0
10.89
0.0
150.2
2,756,000
10.89
10.0
157.6
1,430,000
10.89
5.6
117.4
11,385,000
10.89
13.1
150.2
2,832,000
10.89
12.9
154.5
April
1,521,500
12.18
15.7
165.9
3,575,000
12.18
14.6
172.2
0
12.18
0.0
117.4
10,494,000
12.18
13.5
163.8
12,664,000
12.18
13.6
168.1
May
1,088,000
14.11
13.0
178.9
12,652,000
14.11
12.5
184.7
2,860,000
14.11
14.6
132.0
7,392,000
14.11
11.0
174.8
2,304,000
14.11
13.6
181.7
June
11,751,000 1
8.26
12.2
191.1
13,354,000
8.26
9.3
1 193.9
3,300,000
8.26
9.9
1 141.8
1 9,075,000 1
8.26
7.9
1 182.7
112,208,000
1 8.26
7.6
1 189.3
12 Month Floating PAN Load
191.1
193.9
141.8
182.7
189.3
(Ibs/ac/yr):
Annual PAN Load Limit
350
350.00
350.00
350.00
350.00
(Ibs/ac/yr):
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page + of 11
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: June
Year: 2022
Field Name:
P
Field Name:
Q
Field Name:
R
Field Name:
S
Field Name:
T
Area (acres):
28.64
Area (acres):
23.8
Area (acres):
19.16
Area (acres):
12.74
Area (acres):
6.25
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
[:1 YES NO
Field Loaded?
❑ YES E]NO
Field Loaded?
❑ YES 0 NO
Field Loaded?
❑ YES NO
Field Loaded?
❑ YES ❑� NO
9
C
C
2
C
'O
�o
o
o
°C
a
o
a
a
a
oa
n
a
`C
o
oa
R
o
¢a
C1 C
��
L
M
J
Ez
¢
N"
��
�` N
m
J
¢
C
mU
>, f0
Sa
J
¢
� C
�v�
�. N
J
¢
C
R�
T <0
J
E
C
cJ
3 a
C
��
Ez
3 a
j
�_j
Ez
3 a
��
Ez
3 a
E
��
Ez
3 a
3
o
>
¢
Q
2
U
3
o
>
¢ V
p
U
3
o
C
¢ V
p
U
3
o
C
¢
p
U
3
o
C
¢ V
p
U
>
L)
>
s/ac
>
>
�j
>
Month
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ar
3.1
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
July
5,598,000
20.75
33.8
33.8
420,000
20.75
3.1
720,000
20.75
6.5
6.5
2,666,000
20.75
36.2
36.2
697,500
20.75
19.3
19.3
August
4,734,000
24.33
33.5
67.4
3,465,000
24.33
29.5
32.6
912,000
24.33
9.7
16.2
2,433,500
24.33
38.8
75.0
1,021,500
24.33
33.2
52.5
September
1,548,000
10.5
4.7
72.1
3,585,000
10.5
13.2
45.8
2,892,000
10.5
13.2
29.4
1,875,000
10.5
12.9
87.9
810,000
10.5
11.3
63.8
October
828,000
16.12
3.9
76.0
1,950,000
16.12
11.0
56.8
3,372,000
16.12
23.7
53.0
1,007,500
16.12
10.6
98.5
652,500
16.12
14.0
77.9
November
3,816,000
18.66
20.7
96.7
3,285,000
18.66
21.5
78.3
2,604,000
18.66
21.2
74.2
403,000
18.66
4.9
103.4
517,500
18.66
12.9
90.7
December
3,798,000
16.31
18.0
114.8
2,790,000
16.31
15.9
94.2
2,220,000
16.31
15.8
90.0
1,472,500
16.31
15.7
119.1
868,500
16.31
18.9
109.6
January
3,024,000
11.05
9.7
124.5
2,985,000
11.05
11.6
105.8
2,064,000
11.05
9.9
99.9
1,147,000
11.05
8.3
127.4
675,000
11.05
10.0
119.6
February
4,680,000
15.48
21.1
145.6
3,735,000
15.48
20.3
126.0
1,980,000
15.48
13.3
113.2
1,627,500
15.48
16.5
143.9
585,000
15.48
12.1
131.7
March
3,312,000
10.89
10.5
156.1
3,870,000
10.89
14.8
140.8
2,784,000
10.89
13.2
126.4
1,720,500
10.89
12.3
156.2
679,500
10.89
9.9
141.6
April
3,924,000
12.18
13.9
170.0
4,560,000
12.18
19.5
160.3
3,504,000
12.18
18.6
145.0
1,767,000
12.18
14.1
170.3
774,000
12.18
12.6
154.1
May
3,582,000
14.11
14.7
184.7
3,525,000
14.11
17.4
177.7
2,796,000
14.11
17.2
162.2
1,720,500
14.11
15.9
186.2
666,000
14.11
12.5
166.7
June 3,816,000 8.26
9.2
193.9
3,270,000
8.26
9.5
187.2
2,364,000
8.26
8.5
170.7
1,968,500
8.26
10.6
196.8
630,000
8.26
6.9
173.6
12 Month Floating PAN Load
(Ibs/ac/yr):
193.9
187.2
170.7
196.8
173.E
Annual PAN Load Limit
(Ibs/ac/yr):
350
350.00
350.00
350.00
350.00
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 5 of rl
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: June
Year: 2022
Field Name:
U
Field Name:
V
Field Name:
W
Field Name:
X1
Field Name:
X2
Area (acres):
3.65
Area (acres):
14.7
Area (acres):
11.08
Area (acres):
25.83
Area (acres):
11.55
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
❑ YES [21 NO
Field Loaded?
❑ YES [I NO
Field Loaded?
❑ YES (] NO
Field Loaded?
❑ YES NO
Field Loaded?
❑ YES EINO
Nn
ZQC
Z
L
Z
13
Z
Z
dZa
Z
Z
�
�2
aQ�
M
�
a
aa
>' �a�a
Q
�
MCL
J
m
•°
M
°Q
�
°
2
Q
'o
O
'
°
O:+
M
a)
O
n
d
aC
N
.
�
0
O
Of
o
NJ
O
Z
OZ
3 J
-'
E
'a
E
°
J
EZ
'a
E
EZ
' Q
E
Ea
d
J
EE Q
o
a
M
a V
U a
°
°
Ua
Ua
°Z
Q V
°
vaaV
;
0QV2
0;
Month
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
July
405,000
20.75
19.2
19.2
3,587,000
20.75
42.2
42.2
2,835,000
20.75
44.3
44.3
0
20.75
0.0
0.0
348,000
20.75
5.2
5.2
August
407,250
24.33
22.6
41.8
2,346,000
24.33
32.4
74.6
2,460,000
24.33
45.1
89.3
3,069,000
24.33
24.1
24.1
1,348,500
24.33
23.7
28.9
September
304,500
10.5
7.3
49.1
2,363,000
10.5
14.1
88.7
2,250,000
10.5
17.8
107.1
3,531,000
10.5
12.0
36.1
1,232,500
10.5
9.3
38.2
October
225,000
16.12
8.3
57.4
2,125,000
16.12
19.4
108.1
1,710,000
16.12
20.7
127.9
3,762,000
16.12
19.6
55.7
1,653,000
16.12
19.2
57.5
November
265,500
18.66
11.3
68.8
2,006,000
18.66
21.2
129.4
1,725,000
18.66
24.2
152.1
3,993,000
18.66
24.1
79.7
1,754,500
18.66
23.6
81.1
December
258,750
16.31
9.6
78.4
2,669,000
16.31
24.7
154.1
213,000
16.31
2.6
154.7
3,630,000
16.31
19.1
98.8
1,595,000
16.31
18.8
99.9
January
220,500
11.05
5.6
84.0
1,955,000
11.05
12.3
166.3
1,725,000
11.05
14.3
169.1
4,026,000
11.05
14.4
113.2
1,769,000
11.05
14.1
114.0
February
297,000
15.48
10.5
94.5
2,176,000
15.48
19.1
185.4
1,920,000
15.48
22.4
191.4
2,738,000
15.48
13.7
126.9
1,783,500
15.48
19.9
134.0
March
342,000
10.89
8.5
103.0
1,802,000
10.89
11.1
196.6
2,025,000
10.89
16.6
208.0
4,290,000
10.89
15.1
142.0
1,580,500
10.89
12.4
146.4
April
274,500
12.18
7.6
110.6
21142,000
12.18
14.8
211.4
1,110,000
12.18
10.2
218.2
3,729,000
12.18
14.7
156.6
1,667,500
12.18
14.7
161.1
May
240,750
14.11
7.8
118.4
2,363,000
14.11
18.9
230.3
0
14.11
0.0
218.2
3,531,000
14.11
16.1
172.7
1,551,500
14.11
15.8
176.9
June 290,250 8.26
5.5
123.9
646,000
8.26
3.0
233.3
300,000
8.26
1.9
220.1
3,333,000
8.26
8.9
181.6
1,464,500 8.26
8.7
185.6
12 Month Floating PAN Load
(Ibs/ac/yr):
123.9
233.3
220.1
181.6
185.6
Annual PAN Load Limit
(Ibs/ac/yr):
350
350.00
350.00
350.00
350.00
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page L, of C
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: June
Year: 2022
Field Name:
Y
Field Name:
Z
Field Name:
Field Name:
Field Name:
Area (acres):
3.65
Area (acres):
14.7
Area (acres):
Area (acres):
Area (acres):
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
❑ YES ❑ No
Field Loaded?
❑ YES ❑ No
Field Loaded?
❑ YES ❑ No
Field Loaded?
❑ D YES ❑ No
Field Loaded?
❑ YES ❑ NO
m
Z
Z
¢
Zc
¢ o
Z
>
a
Z c
°
Z
;
Z
o
¢¢
z
a
Zo °c
¢
Z
;Q ao
y
a %
o
s
e
o
a
ao s
¢7o
0
J
-J
£
¢
0
z, 6
JZ
2J
a)
.
6
- p
JZ
¢
a)
�Vd
c
A M
JZ
m
�
z
`
d
¢
£
i
¢a
C
d CCp
0
7¢
a v
o
v
o
0
2
a
Uo
>
>
ig/L
>
>
>
Month
gal
mg/L
Ibs/ac
Ibs/ac
gal
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibslac
gal
mg/L
Ibs/ac
Ibs/ac
July
255,000
20.75
12.1
12.1
20.75
20.75
20.75
20.75
August
506,250
24.33
28.1
40.2
24.33
24.33
24.33
24.33
September
408,750
10.5
9.8
50.0
10.5
10.5
10.5
10.5
October
427,500
16.12
15.7
65.8
16.12
16.12
16.12
16.12
November
495,000
18.66
21.1
86.9
18.66
18.66
18.66
18.66
December
408,750
16.31
15.2
102.1
16.31
16.31
16.31
16.31
January
367,500
11.05
9.3
111.4
11.05
11.05
11.05
11.05
February
311,250
15.48
11.0
122.4
15.48
15.48
15.48
15.48
March
228,750
10.89
5.7
128.1
10.89
10.89
10.89
10.89
April
326,250
12.18
9.1
137.2
12.18
12.18
12.18
12.18
May
401,250
14.11
12.9
150.1
14.11
14.11
14.11
14.11
June
378,750
8.26
7.1
157.3
8.26
8.26
8.26
8.26
12 Month Floating PAN Load
(Ibs/ac/yr):
157.3
0.0
0.0
0.0
0.0
Annual PAN Load Limit
(Ibs/ac/yr):
350
350.00
...]ON
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page q of lr�
Did the mass loading rates exceed the limits in Attachment B of your permit? [Z Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
IOperator in Responsible Charge (ORC) Certification II Permittee Certification I
ORC: Robert Jackson
Certification Number: 1008145
Grade: IV OIT Phone Number: 910-359-5275
Has the ORC changed since the previous NDMLR? ❑ Yes [A No
Signature
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
Permittee:
Mountaire Farms Inc
Signing Official:
David White
Signing Official's Title: Director of Processing
Phone No.: 910-359-5275 Permit Exp.: 2/28/23
7/1 /22 7/1 /22
Date Signature Date
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page \ of _r
Permit No.: W00000484
Facility Name: Mountalre Farms
County: Robeson
Month: June
Year: 2022
Did irrigation
Field Name:
A
Field Name:
B
Field Name:
C
Field Name:
D
occur
Area (acres):
8.2
Area (acres):
6.75
Area (acres):
13.6
Area (acres):
3.5
at this facility?
Cover Crop:Coastal/Rye
Y a
Cover Crop:
p�
Coastal/Rye e
Y
Cover Crop:
P�
Coastal/Rye e
Y
Cover Crop:
P�
Coastal/Rye
Y e
YES NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
78
Annual Rate (in):
78
Annual Rate (in):
78
Annual Rate (in):
78
Weather
Freeboard
Field Irrigated?
YES _j NO
Field I rigated?l
_ YES _1 NO
Field Irrigated?
YES 1 NO
Field Irrigated?
_' YES F11 NO
>
°
°
U
d
Y
°
a
E
_
°
2
U
d
y
R
°
N
m m
w.0
•_
a
O N
N
m y
E m
°
O a
i Q
a
m °'
E
i-
-
rn
> c
- a
O 0
J
E rn
° 7 c
E o
= 0
rZ J
d a
E d
°
O °�
i Q
°
m
E
~ .m
_
rn
> ,c
- -5
p 0
J
E rn
° -' °
E 'o
= 0
J
m°
E°r'
°
p¢
Q
v
E �a
~
_
rn
-
0
J
E rn
E o
= o
J
m
°
°°
Q
v
E m
~
rn
- v
0
E rn
E° ;6
= 0
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
, d
min
in
in
1
C
98
8
2
C
99
8
3
C
90
8
360,000
600
0.97
010
4
CL
87
8
135,000
900
0.61
0.04
135,000
900
0.74
0.05
5
C
88
8
6
C
90
8
7
C
93
8
8
R
90
1
7
99,000
660
0.44
0.04
99,000
660
0,54
0.05
9
R
91
0.5
7
432,000
720
1.17
0.10
10
C
86
7
90,000
600
0.49
0.05
11
CL
87
7
12
R
92
0.5
7
13
C
99
7
14
C
98
7
15
C
95
6
85,500
570
0.38
0.04
85,500
570
0.47
005
16
R
93
0.3
6
252,000
420
0.68
0.10
17
R
99
0.2
6
18
C
91
6
468,000
780
1,27
0.10
19
C
84
7
20
C
87
7
21
C
91
7
94,500
630
0.42
0.04
94,500
630
0.52
0.05
22
R
100
0.25
7
396,000
660
1.07
0.10
23
C
92
8
24
C
93
8
90,000
600
0.49
0.05
25
C
93
8
117,000
780
0.53
0.04
117,000
780
0.64
0.05
26
C
93
8
27
CL
88
8
99,000
660
0.44
0.04
99,000
660
0,54
0.05
28
CL
89
7
432,000
720
1.17
0.10
291
R
86
1
7
30
CL
91
7
31
Monthly Loading:
630,000
2.83
810,000
4.42
2340000
6.34
0
0.00
12 Month Floating Total (in):
40.16
50.70
i
44.11
0.00
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ,�, of C
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
Did irrigation
Field Name:
E
Field Name:
F
Field Name:
G
Field Name:
H
occur
Area (acres):
-----
4.7
Area (acres):
26.53
Area (acres):
47.489
Area (acres):
14.19
at this facility?
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
❑� YES 1 NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
78
Annual Rate (in):
78
Annual Rate (in):
91
Annual Rate (in):
91
Weather
Freeboard
Field Irrigated?
YES NO
Field Irrigated?
0 YES NO
Field 11 rigated?l
YES NO
Field Irrigated?
] YES ❑ NO
m
O
d
d
o
O
m
am
>
� -
°£
7
E
E
O
@y
O a
E
K O
d•v
Ed
>
E
E o
O
@=
N�a
E•E
> Q
E
v
JE
E
'E
ofrnc0
KE Oa
=TJJ
°F
in
ft
ft
gal
min
in
in
gal
in
in
gal
min
in
in
gal
min
in
in
1
C
98
8
437,000
570
0.61
006
540,000
540
0.42
0.05
2
C
99
8
3
C
90
8
460,000
600
0.64
0.06
4
CL
87
8
180,000
900
0.47
0.03
5
C
88
8
6
C
90
8
7
C
93
8
8
R
90
1
7
506,000
660
0.70
0.06
132,000
660
0.34
0,03
9
R
91
0.5
7
156,000
780
0.40
0.03
10
C
86
7
460,000
600
0.64
0,06
660.000
660
0.51
0.05
11
CL
87
7
108,000
540
0.28
0.03
12
R
92
0.5
7
13
C
99
7
14
C
98
7
15
C
95
6
437,000
570
0.61
0.06
16
R
93
0.3
6
322,000
420
0.45
0.06
17
R
99
0.2
6
840,000
840
0,65
0.05
18
C
91
6
120,000
600
0.31
0.03
19
C
84
7
20
C
87
7
21
C
91
7
483,000
630
0.67
0.06
22
R
100
0.25
7
132,000
660
0.34
0.03
23
C
92
8
120,000
600
0.31
0.03
24
C
93
8
460,000
600
0.64
0.06
25
C
93
8
156.000
780
0.40
0.03
26
C
93
8
27
CL
88
8
506,000
660
0.70
0.06
120,000
600
0.31
0.03
28
CL
89
7
29
R
86
1
7
30
CL
91
7
31
Monthly Loading:
0
0.00
4,071,000
5.65
2,040,000
1.58
1,224,000
3.18
12 Month Floating Total (in):
0.00
68.08
73.89
34.47
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of '
Permit No.: W00000484
Facility Name: MOuntalre Farms
County: Robeson
Month: June
Year: 2022
Did irrigation occur
Field Name:
I
Field Name:
J
Field Name:
K
Field Name:
L
this facility?
Area (acres):
Y`«
Area (acres):
58.22
-
Area (acres):
9.86
Area (acres):
24.94
at
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
❑� YES ❑ NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
91
Annual Rate (in):
91
Annual Rate (in):
91
Annual Rate (in):
91
Weather
Freeboard
Field Irrigated?
❑ YES ❑ NO
Field Irrigated?
YES ❑ NO
Field Irrigated?
❑YES ❑ NO
Field Irrigated?
0 YES ❑ NO
o
o
Uy
N
.=
d
3
d
O.
E
F
o
Q
•V
d
a
m
`�°
O
N
�, m
n
T `-'
�6 Q
Q N
0_
ar a
d
'Q
O Q
� Q
N O
E
F, .L
-
rn
T C
v
0
J
E rn
O i C
E v
X 0 o
f6 i J
d a
E d
a
O Q
� Q
v
N
E
H _
rn
C
`o
0 J
E T rn
3 L C
E a
X O J
m 2
2
y a
E y
a
?0 CL Q
a
d w
E m
~
-
rn
A C
@ a
J
E rn
O` C
E
X O J
co 2
2
m a
E d
a
i0 CL Q
E is
F•-
-
rn
a
0 0
J
E rn
E 'v
X O O
m 2 J
°F
in
ft
ft
g al
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
C
98
8
237,500
570
0.38
0.04
441,000
540
0.28
0.03
234,000
540
0.35
0.04
2
C
99
8
539,000
660
0.34
0.03
187,000
660
0.70
0,06
286,000
660
0.42
0.04
3
C
90
8
250,000
600
0.40
0.04
490,000
600
0.31
0.03
260,000
600
0.38
0.04
4
CL
87
8
735,000
900
0.46
0.03
255,000
900
0.95
0.06
5
C
88
1
1 8
6
C
90
8
7
C
93
8
588,000
720
0.37
0.03
204,000
720
0,76
0.06
312,000
720
0.46
0.04
8
R
90
1
7
539,000
660
0.34
0.03
9
R
91
0.5
7
300,000
720
0.48
0.04
1
221,000
780
0.83
0.06
338,000
780
0.50
0.04
10
C
86
7
1
539,000
1 660
0.34
0.03
11
CL
87
7
441,000
540
0.28
0.03
234,000
1 540
0.35
0.04
12
R
92
0.5
1 7
13
C
99
7
14
C
98
7
15
C
95
6
237,500
570
0.38
0.04
490,000
600
0.31
0.03
170,000
600
0.63
0.06
260,000
600
0.38
0.04
16
R
93
0.3
6
17
R
99
0.2
6
686,000
840
0.43
0.03
364,000
1 840
0.54
1 0.04
18
C
91
6
325,000
780
0.52
0.04
490,000
600
0.31
0.03
170,000
600
0.63
0.06
260,000
600
0.38
0.04
19
C
84
7
20
C
87
7
21
C
91
7
22
R
100
0.25
7
275,000
660
0.44
0.04
539,000
660
0.34
0.03
187,000
660
0.70
0,06
286,000
660
0.42
0.04
23
C
92 1
1
8
1
1
1
490,000
600
0.31
0.03
24
C
93
8
490,000
600
0.31
0.03
260,000
600
0.38
0.04
251
C
93
8
325,000
780
0.52
0.04
637,000
780
0.40
0.03
221,000
780
0.83
0.06
26
C
93
8
27
CL
88
8
490,000
600
0.31
0.03
260,000
600
0.38
0.04
28
CL
89
7
300,000
720
0.48
0.04
392,000
480
0.25
0.03
136,000
480
0.51
0.06
29
R
86
1
7
30
CL
91
7
31
Monthly Loading:
2,250,000
3.59
9,016,000
5.70PM-1-,751,000
6.54
3,354,000
4.95
12 Month Floating Total (in):
51.91
59.42
VffM
58.49
51.37
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page LA of 4>
Permit No.: W00000484
Facility Name: Mountalre Farms
County: Robeson
Month: June
Year: 2022
Did irrigation
Field Name:
M
Field Name:
N
Field Name:
O
Field Name:
P
occur
Area (acres):
23.07
Area (acres):
78.87
----------
Area (acres):
19.9
Area (acres):
28.64
at this facility?
Cover Crop:Coastal/Rye
Y e
Cover Crop:
P�
Coastal/Rye e
Y
Cover Crop:
p�
Coastal/Rye a
Y
Cover Crop:
p�
e
Coastal/Rye
Y
❑ YES ❑ NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
52
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Weather
Freeboard
Field Irrigated?
YES , j NO
Field Irrigated?
❑ YES ❑ NO
Field Irrigated?
YES ❑ No
Field Irrigated?
❑✓ YES ❑ No
o
v
U
y
d
Q
f4
°
E
N
r
°
a
u
y
a
m
I
O
U)
t m
(n .0
n
(p a
Q (a
� w
v
m y
E °'
a
O a
J Q
a
° d
E
F .`
rn
> c
'm
Q p
J
E rn
c
3 'n
m 2 0
J
V -o
E m
a
O a
i Q
v
m m
E
~ r-
_
rn
c
v
Q 0
J
E rn
C
E
@ 2 0
J
m'a
E 2
a
D a
% Q
v
m m
E is
1- 'o'
_
rn
m o
Q 0
J
E rn
c
E v
= 0
J
m y
E m
a
°
J Q
an d
E A
F rn
_
rn
c
v
Q 0
J
E rn
T
E a
m= 0
J
�
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal (in
378,000 630
in
in
1
C
98
8
252,000
630
0,47
0.04
0,49
0.05
2
C
99
8
605,000
660
0.97
0.09
3
C
90
8
550,000
600
0.88
0.09
660,000
600
0.31
0.03
4
CL
87
8
990,000
900
0,46
0.03
540,000
900
0.69
0.05
5
C
88
8
6
C
90
8
7
C
93
8
792,000
720
0.37
0.03
288,000
720
0.53
0.04
8
R
90
1
7
605,000
660
0.97
0.09
342,000
570
0.44
0.05
9
R
91
0.5
7
858,000
780
0.40
0.03
10
C
86
7
240,000
600
0,44
0.04
11
CL
87
7
594,000
540
0.28
0.03
324,000
540
0.42
0.05
12
R
92
0.5
7
13
C
99
7
495,000
450
0.23
0.03
14
C
98
7
726,000
660
0.34
0.03
264,000
660
0.49
0.04
15
C
95
6
550.000
600
0.88
0.09
288,000
480
0.37
0.05
16
R
93
0.3
6
594,000
540
0.28
0.03
17
R
99
0.2
6
276,000
690
0.51
0.04
18
C
91
6
660,000
600
0.31
0.03
360,000
600
0.46
0,05
19
C
84
7
20
C
87
7
21
C
91
7
360,000
900
0.67
0.04
540,000
900
0.69
0.05
22
R
100
0.25
7
23
C
92
8
550,000
600
0.88
0.09
660,000
600
0.31
0.03
24
C
93
8
216,000
540
0.40
004
324,000
540
0.42
0.05
25
C
93
8
726,000
660
0.34
0.03
26
C
93
8
27
CL
88
8
726,000
660
0.34
0.03
396,000
660
0.51
0.05
28
CL
89
7
440,000
480
0.70
0.09
312,000
780
0.58
0.04
29
R
86
1
7
594,000
540
0.28
0.03
324,000
540
0.42
0.05
30
CL
91
7
31
Monthly Loading:
12 Month Floating Total (in):
3,300,000
rg=
5.27
41.71
9,075,000
4.24
53.27
2,208,000
4.09
56.85
3,816,000
4.91
54.86
l
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
Permit No.: W00000484
Facility Name: MOuntalre Farms
County: Robeson
Month: June
Year: 2022
Did irrigation
Field Name:
Q
Field Name:
R
Field Name:
S
Field Name:
T
occur
Area (acres):
-
23.8
Area (acres):
1916
Area (acres):
12.74
Area (acres):
6.25
at this facility?
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
J YE S LINO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Weather
Freeboard
Field Irrigated?
YES ;i NO
Field Irrigated?
I YES LINO
Field Irrigated?
_- YES NO
Field Irrigated?
0 YES ❑ NO
>.
p
O
U
t
d
f0
m
CL
E
N
C
f0
..
a
U
y
f�
y m
¢ U
]_
a
a
0
L
E d
o
O O_
J Q
d ��.,
F •�
_
>. C
@@
O
J
E m
3 6 C
E
N 2 0
J
m -a
E N
a
O
% Q
N d
E
~�
_
M
>, C
R m
O
J
E m
=` C
E o°
cx0 2 0
J
m o
E d
3 a
O O-
Q
y 01
E m
~
_
rn
), c
m o
0
J
E m
7 -' C
E o
fx0 2 0
cC J
m y
E y
a
O O.
% Q
v
N O
E m
~ C
_
M
C
v
0
J
E m
O �` C
E 3 v
cx0 2 0
J
°F
in
ft
ft
gal
min
in
in
gal
min
in
gal
min
in
in
gal
min
in
in
1
C
98
8
315,000
630
0.49
0.05
2
C
99
8
3
C
90
8
4
CL
87
8
360,000
900
0.69
0.05
135,000
900
0.80
0.05
5
C
88
8
6
C
90
8
7
C
93
8
360,000
720
0.56
0,05
288,000
720
0.55
0.05
108,000
720
0.64
0.05
8
R
90
1
7
294.500
570
0.85
0.09
9
R
91
0.5
7
117,000
780
0.69
0.05
10
C
86
7
300,000
600
0.46
0.05
240,000
600
OA6
0.05
11
CL
87
7
1
279,000
540
0.81
0.09
12
R
92
0.5
7
13
C
99
7
14
C
98
7
330,000
660
0.51
0.05
264,000
660
0.51
0.05
341,000
660
0.99
0.09
15
C
95
6
240.000
480
0.37
0.05
16
R
93
0.3
6
81,000
540
0.48
0.05
17
R
99
0.2
6
345,000
690
0.53
0.05
276,000
690
0.53
0.05
18
C
91
6
310,000
600
0.90
0.09
19
C
84
7
20
C
87
7
21
C
91
7
450,000
900
0.70
0.05
360,000
900
0.69
0.05
22
R
100
0.25
7
23
C
92
8
90,000
600
0.53
0.05
24
C
93
8
270,000
540
0.42
0.05
25
C
93
8
264,000
660
0.51
0.05
341,000
660
0.99
0.09
26
C
93
8
27
CL
88
8
99,000
660
0.58
0.05
28
CL
89
7
390,000
780
0.60
0.05
312,000
780
0.60
0.05
403,000
780
1.17
0.09
291
R
86
1
7
270,000
540
0.42
0.05
30
CL
91
7
31
L630,000
Monthly Loading:
3,270,000
5.06]�2,364,000�_74
'
1,968.500
5.69
3.71
12 Month Floating Total (in):1
59.13
54.23
5727
50.54
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 1s of c S
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
Did irrigation
Field Name:
U
-------
Field Name:
V
Field Name:
W
Field Name:
X1
occur
Area (acres):
3.65
Area (acres):
14.7
Area (acres):
11.08
Area (acres):
25.83
at this facility?
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
YES n NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Weather
Freeboard
Field Irrigated?
17! YES [] NO
Field Irrigated?
=1 YES F1 NO
Field Irrigated?
_ `, YES _; NO
Field Irrigated?
YES ❑ NO
f6
o
o
=
m
y
m
E
E
d
o
Q
v
N
fn
m
a m
� .e
-
Q. CL
O m
u) w
m a
E �'
_ a
0 Q.
Q
d
E
~ •�
_
rn
> c
m
0
J
E T rn
c
E _'v
N 2 0
J
d o
E °'
_ a
Q
Q
m m
_ m
E
~
_
rn
c
v
0
J
E T rn
c_ c
E �'a
2 0
J
d v
E °'
_ a
Q
� Q
m ;;
E m
~
_
rn
c
v
0
J
E T rn
c
E a v
M 2 0
J
m o
E 2
_3 a
O Q
1 Q
M
E
F
_
m
�v
cu
0
.J
E T rn
v
E �cu
cc= 0
J
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
C
98
8
2
C
99
8
627,000
570
0.89
0.09
3
C
90
8
300,000
600
1.00
0.10
4
CL
87
8
67,500
900
0.68
0.05
5
C
88
8
6
C
90
8
7
C
93
8
8
R
90
1
7
42,750
570
0.43
0.05
9
R
91
0.5
7
858,000
780
1.22
0.09
10
C
86
7
11
CL
87
7
40,500
540
0.41
0.05
12
R
92
0.5
7
13
C
99
7
255,000
450
0.64
0.09
14
C
98
7
15
C
95
6
16
R
93
0.3
6
594,000
540
0.85
0.09
17
R
99
0.2
6
391,000
690
0.98
0.09
18
C
91
6
45,000
600
0.45
0.05
19
C
84
7
20
C
87
7
21
C
91
7
22
R
100
0.25
7
23
C
92
8
45,000
600
0.45
0.05
660,000
600
0.94
0.09
24
C
93
8
25
C
93
8
26
C
93
8
27
CL
88
8
49,500
660
0.50
0.05
28
CL
89
7
29
R
86
1
7
594,000
540
0.85
0.09
30
CL
91
7
31
Monthly Loading:
290,250
2.93
646,000
1.62
300,000
1.00
3,333,000
4.75
12 Month Floating Total (in):
35.60
65.r
67.11
56.54
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page -3- of c�
Permit No.: W00000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
Did irrigation occur
Field Name:
X2
Field Name:
Y
Field Name:
Z
Field Name:
Area (acres):
11.55
Area (acres):
3.21
Area (acres):
-------
7.1
Area (acres):
at this facility?
Cover Crop:Coastal/Rye
Y a
Cover Crop:
p�
Coastal/Rye e
Y
Cover Crop:
p�
Coastal/Rye e
Y
Cover Crop:
p�
e
Coastal/Rye
Y
YES ( NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Weather
Freeboard
Field Irrigated?
❑ YES ❑ NO
Field Irrigated?
❑: YES NO
Field Irrigated?
❑ YES [] NO
Field Irrigated?
❑ YES ❑ NO
o
o
U
ami
a)
E
F
c
°
n.
m d
aO
M
,i, •�
E 2
Q
a)a
rn
>c
J
E
a S
2J
O
%
_
J
E >
0
J
E
O
> Q
_
J
E
c
=
J
a
E
a
>
m
m
J2
E rnc
Ea
0rO>
J
°F
in
ft
ftv
g al
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
C
98
8
2
C
99
8
275,500
570
0.88
0,09
71,250
570
0.82
0.09
3
C
90
8
4
CL
87
8
5
C
88
8
6
C
90
8
7
C
93
8
8
R
90
1
7
9
R
91
0.5
7
377,000
780
1,20
0.09
97.500
780
1.12
0.09
10
C
86
7
11
CL
87
7
12
R
92
0.5
7
13
C
99
7
14
C
98
7
15
C
95
6
16
R
93
0.3
6
261,000
540
0.83
0.09
67,500
540
0.77
0.09
17
R
99
0.2
6
18
C
91
6
19
C
84
7
20
C
87
7
21
C
91
7
221
R
100
0.25
7
23
C
92
8
290,000
600
0.92
0.09
75,000
600
0.86
0.09
24
C
93
8
25
C
93
8
26
C
93
8
27
CL
88
8
281
CL
89
7
29
R
86
1
7
261,000
540
0.83
0.09
67,500
540
0.77
0.09
30
91 1
17
31
Monthly Loading:
1,464,500
E467
378,750
4.35
0
0.00
0
0.00
12 Month Floating Total (in):
,
51.80
0.00
0.00
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page '3 of'?
Did the application rates exceed the limits in Attachment B of your permit?
❑ Compliant
❑ Non -Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
n Compliant
❑ Non -Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
E Compliant
❑ Non -Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
❑ Compliant
❑ Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
❑ Compliant
❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the
non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
ORC: Robert Jackson
Certification No.: 1008145
Grade: IV OIT Phone Number: 910-359-5275
Has the ORC changed since the previous NDAR-1? Lj Yes No
7/1/2
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
Permittee Certification
Permittee:
Mountaire Farms
Signing Official: David White
Signing Official's Title: Director Of Processing
Phone Number: 910-359-5275 Permit Exp.
V zz/v
t G
2/28/23
7/ 1 /221
Signature Date
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
PPI: 005
Flow Measuring Point: ❑ Influent ❑ Effluent ❑ No flow generated
Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑' Groundwater Lowering ❑ Surface Water
Parameter Code —►
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
>,
m
Q F
~
O
C
Ct
£"
H to
U
0
O
O
LL
=
CL
j
y
C
0
O
m
@
O
E
E
Q
d
w, c v
O a 'o
~ 7 N
rn
u 2
m "=
LL U
L
R C
d
Y o
:�+ Z
o
�
ID
y
Z
M
m
J
_ELO
E
U
i
.@., C
O a
F- p
a-
to
O
U
Y
Z
C
c_
N
24-hr
hrs
GPD
su
mg/L
mg/L
mg -IL
mg/L
#1100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
6,110
2
0600
10
582
3
0600
10
8,883
4
0800
4
0
5
7,069
6
0600
10
4,761
7
0600
10
4,673
8
0600
10
2,005
9
0600
10
20,766
10
0600
10
71,597
11
0800
4
0
12
0
13
0600
10
12,861
14
0600
10
11,746
15
0600
10
10,312
161
0600
10
15,200
17
0600
10
15,379
18
0800
4
0
19
65,893
20
0600
10
80,900
21
0600
10
14,491
22
0600
10
11,336
23
0600
10
10,357
24
0600
10
0
25
0800
4
0
26
21,531
27
0600
10
6,649
28
0600
10
4,260
29
0600
10
5,403
301
0600
10
4,042
31
Average:
13,894
Daily Maximum:
80,900
Daily Minimum:
0
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:I
2,550,000
Sample Frequency:
Continuous
5xWeekly
Monthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12
NON -DISCHARGE MONITORING REPORT (NDMR)
Page of
N
Sampling Person(s)
Name: Robert Jackson
Name: Joshua Simmons
Name: Cameron Testing
Name: TBL
Certified Laboratories
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑� Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Robert Jackson
Permittee: Mountaire Farms
Certification No.: 1008145
Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275
Signing Officials Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ Yes D No
Phone Number: 910-359-5275 Permit Expiration: 2/28/2023
7/1/2022
7/1/2022
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page I of
Permit No.: W00000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
PPI: 004
Flow Measuring Point: ❑ Influent [:�] Effluent ❑ No flow generated
Parameter Monitoring Point: [ ' Influent I_ Effluent Groundwater Lowering [] Surface water
Parameter Code —►
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
Q
N
O F
O
C
N
_ d
H N
O
3
tL
2
�'
N
m
m
p
E
Q
_
16 C 'O
H N fn
_
M 8
li O
U
L
Ca
d
o
Y •�
o Z
t—
jp
.J
Z
a
�
2
E
U
N
2
fp r
a
F y
r
a
j
p
to
7
U
Y
Z
U
c
n1
24-hr
hrs
GPD
su
mg/L
mg/L
mg/L
mg/L
#/100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
2,870,000
7.1
2
0600
10
2,970,000
6.7
48
3
0600
10
2,880,000
6.7
4
0800
4
320,000
5
290,000
6
0600
10
2,730,000
6.8
7
0600
10
2,820,000
7.1
8
0600
10
2,910,000
7
9
0600
10
2,900,000
7.2
10
0600
10
2,930,000
7
11
0800
4
515,000
12
225,000
13
0600
10
2,730,000
7.3
14
0600
10
2,830,000
6.8
151
0600
10
2,840,000
6.9
16
0600
10
2,800,000
6.9
17
0600
10
2,980,000
6.4
18
0800
4
310,000
19
430,000
20
0600
10
2,850,000
6.9
21
0600
10
2,940,000
7.1
22
0600
10
2,960,000
7
23
0600
10
2,860,000
7.2
24
0600
10
3,040,000
7.2
25
0800
4
370,000
26
440,000
27
0600
10
2,720,000
7.3
28
0600
10
2,840,000
7.8
29
0600
10
2,970,000
7
30
0600
10
2,810,000
7.2
31
Average:
2,202,667
48.00
Daily Maximum:
3,040,000
7.80
48.00
Daily Minimum:
225,000
6.40
48.00
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency:
Continuous
5xWeekly
Monthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page �_ of .2-
Sampling Person(s) Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 0 Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Robert Jackson
Permittee: Mountaire Farms
Certification No.: 1008145
Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275
Signing Official's Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ yes [I] No
Phone Number: 910-359-5275 Permit Expiration: 2/28/2023
1 7/1 /2022
7/ 1 /2022
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of_X_
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
PPI: 003
Flow Measuring Point: Influent Effluent ❑ No flow generated
Parameter Monitoring Point: ❑Influent Effluent ❑Groundwater Lowering 1_1 Surface Water
Parameter Code -i
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
cu
0
la
O
Q E
U f-
O
C
O
d
E d
F y
U
O
3
°
LL
a
E
(�
m
O
m
16
CO
E
E
Q
M C a
o a'o
F N !n
rn
_ £
M O
aa)i
LL. O
U
t
N
Y 2
-
10 Z
o
=
Z
v
,J
7
E
U
N
`
f0 0
o a
F O
a
O
a
O
C
7
N
U
Z
c_
N
24-hr
hrs
GPD
su
mg/L
mg/L
mg/L
mg/L
#1100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
25,300
7.1
2
0600
10
25,000
6.7
3
0600
10
24,800
6.7
4
0800
4
7,800
5
8,400
6
0600
10
24,000
6.8
7
0600
10
25,900
7.1
8
0600
10
27,200
7
9
0600
10
25,300
7.2
10
0600
10
24,300
7
11
0800
4
7,800
12
17,400
13
0600
10
24,700
7.3
14
0600
10
24,900
6.8
15
0600
10
24,900
6.9
16
0600
10
24,100
6.9
17
0600
10
24,800
6.4
18
0800
4
7,800
19
6,700
20
0600
10
24,600
6.9
21
0600
10
25,900
7.1
221
0600
10
25,600
7
23
0600
10
26,500
7.2
24
0600
10
24,300
7.2
25
0800
4
6,700
26
9,700
27
0600
10
24,100
7.3
28
0600
10
25,400
7.8
29
0600
10
26,400
7
30
0600
10
25,500
7.2
31
Average:
20,860
Daily Maximum:
27,200
7.80
Daily Minimum:
6,700
6,40
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:I
2,550,000
Sample Frequency:
Continuous
5xWeekly
Monthly
2xMonthly
2xMonthly
2xMonthly
F2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -,;L- of
Sampling Person(s) Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 0 Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
dUrrUr 1kbj ld RCr 1. MUdUrI duUIUUr Idi Sr rCCrS rr
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Robert Jackson
Permittee: Mountaire Farms
Certification No.: 1008145
Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275
Signing Officials Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ Yes 0 No
Phone Number: 910-359-5275 Permit Expiration: 2/28/2023
7/1 /2022
7/1 /2022
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -I- of
Permit No.: W00000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
PPI: 002
Flow Measuring Point: I Influent ❑ Effluent L J No flow generated
Parameter Monitoring Point: Influent ❑ Effluent ❑ Groundwater towering ❑ Surface Water
Parameter Code 0.
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
Q E
0
c
F N
O
°
a
°
c
rn
O
m
c
E
E
Q
N
o Q.o
I— N (n
N
E
m °=
V- °
U
t
m
Y 2
^-'
° Z
m
b
Z
m
J
E
E
U
a
O
o a
t... ON
r
a
E
N
E
u
Z
N
24-hr
hrs
GPD
su
mg/L
mg/L
mg/L
mg/L
#1100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
2,870,000
7.1
2
0600
10
2,970,000
6.7
3
0600
10
2,880,000
6.7
4
0800
4
320,000
5
290,000
6
0600
10
2,730,000
6.8
7
0600
10
2,820,000
7.1
8
0600
10
2,910,000
7
9
0600
10
2,900,000
7.2
10
0600
10
2,930,000
7
11
0800
4
515,000
12
225,000
13
0600
10
2,730,000
7.3
141
0600
10
2,830,000
6.8
15
0600
10
2,840,000
6.9
16
0600
10
2,800,000
6.9
17
0600
10
2,980,000
6.4
18
0800
4
310,000
19
430,000
201
0600 1
10
2,850,000
6.9
21
0600
10
2,940,000
7.1
22
0600
10
2,960,000
7
23
0600
10
2.860,000
7.2
24
0600
10
3,040,000
7.2
25
0800
4
370,000
26
440,000
27
0600
10
2,720,000
7.3
28
0600
10
2,840,000
7.8
29
0600
10
2,970,000
7
30
0600
10
2,810,000
7.2
31
Average:
2,202,667
Daily Maximum:
3,040,000
7.80
Daily Minimum:
225,000
6.40
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency:
Continuous
5xWeekly
Monthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12
NON -DISCHARGE MONITORING REPORT (NDMR)
Page _kI, of,
Sampling Person(s)
Name: Robert Jackson
Name: Joshua Simmons
Name: Cameron Testing
Name: TBL
Certified Laboratories
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑J Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Robert Jackson
Permittee: Mountaire Farms
Certification No.: 1008145
Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275
Signing Official's Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ Yes 0 No
Phone Number: 910-359-5275 Permit Expiration: 2/28/2023
7/1 /2022
7/1 /2022
� j Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page_ of
Permit No.: W00000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
PPI: 001
Flow Measuring Point: nfluent Effluent E No flow generated
Parameter Monitoring Point: [ Influent '_1 Effluent L Groundwater Lowering ] Surface Water
Parameter Code -►
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
p
>
U
0
C
d
E (D
p N
U
0
3
LL
a
fN
c
m
0
O
m
p
E
E
a
_
l0 C 'O
a 0
_
/6 8
ti -
U
L
M
d C)
Y Q
'z
0
*_
z
D
7
a
M
V)
`
_
f0 r
Fo C
o
a
>
o
N
>
m
U
Y
u
z
U
N
24-hr
hrs
GPD
su
mg/L
mg/L
mg/L
mg/L
#/100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
2,870,000
7.1
2
0600
10
2,970,000
6.7
2.97
19.7
20.7
22.7
1040
22.5
0.05
0.001
0,0001
0.69
146
4.09
0,0109
0.0462
3
0600
10
2,880,000
6.7
4
0800
4
320,000
5
290,000
6
0600
10
2,730,000
6.8
7
0600
10
2.820,000
7.1
8
0600
10
2,910,000
7
9
0600
10
2,900,000
7.2
32.9
6.34
27.3
8560
19
0.05
0.735
10
0600
10
2,930,000
7
11
0800
4
515,000
121
225,000
13
0600
10
2,730,000
7.3
14
0600
10
2,830,000
6.8
15
0600
10
2,840,000
6.9
16
0600
10
2,800,000
6.9
17
0600
10
2,980,000
6.4
181
0800
4
310.000
19
430,000
20
0600
10
2.850,000
6.9
21
0600
10
2.940,000
7.1
22
0600
10
2,960.000
7
23
0600
10
2,860,000
7.2
241
0600
10
3,040,000
7.2
25
0800
4
370,000
26
440,000
27
0600
10
2,720,000
7.3
28
0600
10
2,840,000
7.8
29
0600
10
2,970,000
7
30
0600
10
2,810,000
7.2
31
Average:
2,202,667
2.97
26.30
13.52
25.00
2.983.69
20.75
0.05
0.00
0.00
0.71
146.00
4.09
0,01
0.05
Daily Maximum:
3,040,000
7,80
2.97
32.90
20.70
27.30
8,560.00
22.50
0.05
0.00
0.00
0.74
146.00
4.09
0.01
0.05
Daily Minimum:
225,000
6.40
2.97
19.70
6.34
22.70
1,040.00
19.00
0.05
0.00
0.00
0.69
146.00
4.09
0.01
0.05
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency:
Continuous
5xWeekly
I Monthly
2xMonthly
2xMonthly
I 2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12 NON DISCHARGE MONITORING REPORT (NDMR) Page.„ of
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
Month: June
Year: 2022
PP 00,
Flow Measuring Point: - Influent Effluent No flow generated
Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑ Groundwater Lowering ❑ Surface water
Parameter Code --►
50050
01042
00931
WQ09
70300
50060
00940
00600
o
' N
U H
0
O
c
O
E
F
Ua
O
LL
a7
a
p
U
o
E p
-0 p iC
o(n
tnQ
d o
� a)
10 O
a M
QZ
a)m
) N
p p
►- y to
6
a,
c
p
m e
�U
a)c
U
N
o
Z
24-hr
hrs
GPD
mg/L
Ratio
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
2,870,000
0.29
2
0600
10
2,970,000
0.00904
13,21
10.76
0
22.5
3
0600
10
2,880,000
0
4
0800
4
320,000
0
5
290,000
0
6
0600
10
2,730,000
0
7
0600
10
2,820,000
0.31
8
0600
10
2,910,000
0.14
9
0600
10
2,900,000
5.75
0.19
19
10
0600
10
2,930,000
0.26
11
0800
4
515,000
0
121
225,000
0
13
0600
10
2,730,000
0
14
0600
10
2,830,000
0
15
0600
10
2,840,000
0.16
16
0600
10
2,800,000
0.89
17
0600
10
2,980,000
0.3
181
0800
4
310,000
0
19
430,000
0
20
0600
10
2.850,000
0.61
21
0600
10
2,940,000
0.43
22
0600
10
2,960,000
0.22
23
0600
10
2,860,000
0.57
241
0600
10
3,040,000
0.15
25
0800
4
370,000
0
26
440,000
0
27
0600
10
2,720,000
0.21
28
0600
10
2,840,000
0.49
29
0600
10
2,970,000
0.16
30
0600
10
2,810,000
0.12
31
Average:
#REF!
#REF!
13.21
8.26
0.18
20.75
Daily Maximum:
#REF!
#REF!
13.21
10.76
0.89
22.50
Daily Minimum:
#REF!
#REF!
13.21
5.75
0.00
19.00
Sampling Type:
Recorder
Grab
Calculated
Calculated
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency: 1
Continuous
Monthly
Monthly I
2xMonthly
3xYearly
5xWeek
3xYear
2x Month
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -3 of
Sampling Person(s) Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑� Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Robert Jackson
Permittee: Mountaire Farms
Certification No.: 1008145
Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275
Signing Officials Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ Yes El No
Phone Number: 10-359-5275 Permit Expiration: 2/28/2023
7/1 /2022
7/1 /2022
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617