Loading...
HomeMy WebLinkAboutFW_ R-3300B Hampstead Bypass Sediment LossesFrom:Farrell, Sean C To:Sprinkle, Hannah H; Steffens, Thomas A CIV USARMY CESAW (USA) Cc:Bullard, Jason M; Yarborough, Jerry W; Westphal, Anneliese; Gingrich, Sophia E Subject:FW: R-3300B Hampstead Bypass Sediment Losses Date:Wednesday, December 28, 2022 7:52:08 AM Attachments:Washout at Culvert 10 from Sed Basin.jpg 78in Inlet Side Blowout at Headwall.jpeg 78in Inlet Side Blowout at Headwall2.jpeg 78in Inlet Side Blowout at Headwall3.jpeg 78in Outlet Side Ditch.jpeg 78in Outlet Side Ditch2.jpeg image001.png Hannah and Tom, We had some losses out at R-3300B. Below is a report from Ben. I am headed out there today to get more information and see how they are doing with clean up efforts. I will follow up with additional information. Thanks, Sean Farrell GIS Analyst Division 3 NCDOT- Division of Highways 910-341-2033 office 910-599-1184 mobile scfarrell@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Meyer, Benjamin C <ext-bcmeyer1@ncdot.gov> Sent: Tuesday, December 27, 2022 2:35 PM To: Farrell, Sean C <scfarrell@ncdot.gov> Cc: Westphal, Anneliese <awestphal@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov>; Jim L. Haga <jhaga@rkk.com>; Brandon Helms <brandon.helms@summitde.com>; Dustin Allen <Dustin.Allen@summitde.com>; Waugh, Daniel G <dgwaugh1@ncdot.gov>; Jackson Provost, PE, PLS <Jackson.Provost@summitde.com> Subject: R-3300B Hampstead Bypass Sediment Losses Sean, We have been out assessing the project after the Christmas break. The project had over 1.5in of rain over the course of the 24hr rain event that started 12/21 thru 12/22. It caused a couple of locations to have blowouts with sediment loss over a 5-gallon bucket. The locations are as follows: Y30RPA STA ~16+00 LT (NC210 Interchange) _ At culvert 10 inlet area there is a washout where the basin drains into the project. The volume of rain has cause there to be washing of the bank even with rip rap to try and help stabilize the area. L1Northern STA 851+00 LT _ 78in pipe inlet headwall blowout. L1Northern STA 851+00 RT _ 78in pipe outlet side ditch We are working on cleaning up these areas. Please let us know if you would like to come out and visit these areas. Cheers, Ben Ben Meyer, PE, CCM Assistant Resident Engineer Hampstead Bypass Cell: 910-617-1902 Ext-bcmeyer1@ncdot.gov bmeyer@rkk.com Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.