HomeMy WebLinkAboutFW_ R-3300B Hampstead Bypass Sediment LossesFrom:Farrell, Sean C
To:Sprinkle, Hannah H; Steffens, Thomas A CIV USARMY CESAW (USA)
Cc:Bullard, Jason M; Yarborough, Jerry W; Westphal, Anneliese; Gingrich, Sophia E
Subject:FW: R-3300B Hampstead Bypass Sediment Losses
Date:Wednesday, December 28, 2022 7:52:08 AM
Attachments:Washout at Culvert 10 from Sed Basin.jpg
78in Inlet Side Blowout at Headwall.jpeg
78in Inlet Side Blowout at Headwall2.jpeg
78in Inlet Side Blowout at Headwall3.jpeg
78in Outlet Side Ditch.jpeg
78in Outlet Side Ditch2.jpeg
image001.png
Hannah and Tom,
We had some losses out at R-3300B. Below is a report from Ben. I am headed out there today to get
more information and see how they are doing with clean up efforts. I will follow up with additional
information.
Thanks,
Sean Farrell
GIS Analyst
Division 3
NCDOT- Division of Highways
910-341-2033 office
910-599-1184 mobile
scfarrell@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Meyer, Benjamin C <ext-bcmeyer1@ncdot.gov>
Sent: Tuesday, December 27, 2022 2:35 PM
To: Farrell, Sean C <scfarrell@ncdot.gov>
Cc: Westphal, Anneliese <awestphal@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov>; Jim L.
Haga <jhaga@rkk.com>; Brandon Helms <brandon.helms@summitde.com>; Dustin Allen
<Dustin.Allen@summitde.com>; Waugh, Daniel G <dgwaugh1@ncdot.gov>; Jackson Provost, PE, PLS
<Jackson.Provost@summitde.com>
Subject: R-3300B Hampstead Bypass Sediment Losses
Sean,
We have been out assessing the project after the Christmas break. The project had over 1.5in of rain
over the course of the 24hr rain event that started 12/21 thru 12/22. It caused a couple of locations
to have blowouts with sediment loss over a 5-gallon bucket. The locations are as follows:
Y30RPA STA ~16+00 LT (NC210 Interchange) _ At culvert 10 inlet area there is a washout
where the basin drains into the project. The volume of rain has cause there to be washing of
the bank even with rip rap to try and help stabilize the area.
L1Northern STA 851+00 LT _ 78in pipe inlet headwall blowout.
L1Northern STA 851+00 RT _ 78in pipe outlet side ditch
We are working on cleaning up these areas. Please let us know if you would like to come out and
visit these areas.
Cheers,
Ben
Ben Meyer, PE, CCM
Assistant Resident Engineer
Hampstead Bypass
Cell: 910-617-1902
Ext-bcmeyer1@ncdot.gov
bmeyer@rkk.com
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.