HomeMy WebLinkAboutSW1170501_As-Built - Certification_20221223Project Name
ACONY BELL
Permit # SW8 SW 1170501
AS -BUILT DESIGNER'S CERTIFICATION FOR
GENERAL MDC
I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed
the construction of the project named above to the best of my abilities with all due care and diligence, and that the
project meets all of the below listed General MDC found in 15A NCAC 02H.1050, in accordance with the permit
documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT"
drawings, such that the intent of the stormwater rules and the general statutes has been preserved.
N Check here if this is a partial certification. Section/phase/SCM # PHASE I AND 11 LOW -DENSITY
❑ Check here if this is part of a Fast -Track As -Built Package Submittal per 15A NCAC 02H .1044(3).
❑ Check here if the Designer did not observe the construction but is certifying the project.
❑ Check here if pictures of the SCMs are provided. /zX/
Printed Name - ZZ f -1�- ��%���5 Signature-
`f i NC Registration Number Date 1
SEAL: v»>tm,iar,rfrriii� �i
�o.\\A
CAI?
4�%y•• ,
y � � AL
_��,, ..q '•�G+CIE , '�•�`�,•�
Consultant's Mailing Address:
15 ARLINGTON ST
City: ASHEV.ILLE
Phone:t828) 232-4700
Consultant's Email address:
tA
OAo Wj 9.�u�l�.
State: NC Zip: 28801
O Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 3.
OO WE = Not Evaluated (provide explanation on page 2). ON/A = Not Applicable to this project or SCM.
Consultant's Certification 15A NCAC 021-1.1003(3) & General MDC 15A NCAC 02H .1050
TREATMENT REQUIREMENTS
(DAs-built
OO N/E
OO N/A
1. The SCM achieves runoff treatment.
Y or N
X
2. The SCM achieves runoff volume snatch.
Y or N
X
3. Runoff from offsite areas and/or existing BUA is bypassed.
Y or N
X
4. Runoff from offsite areas and/or existing BUA is directed into
Y or N
the permitted SCM and is accounted for at the full build -out
X
potential,
5. The project controls runoff through an offsite permitted SCM
Y or N
that meets the requirements of the MDC.
X
6. The net area of new BUA increase for an existing project has
Y or N
been accounted for at the appropriate design storm level.
X
NCDEQ 2/9/2018
Project Name
AGONY BELL Permit # SW8 SW1170501
T The SCM(s) meets all the specific minimdesign criteria,
Y or Num
X
VEGETATED SETBACKS / BUA
OAs-built
OO N/E
ON/A
1. The width of the vegetated setback has been measured from
Y or N
the normal pool of impounded waters, the MHW line of tidal
waters, or the top of bank of each side of rivers or streams.
2. The vegetated setback is maintained in grass or other
Y or N
vegetation.
3. BUA that meets the requirements of NCGS 143-214.7 (b2)(2)
Y or N
is located in the setback.
�'
4. BUA that does not meet the requirements of NCGS 143-214.7
Y or N
(b2)(2) is located within the setback and is limited to:
® Publicly funded linear projects (road, greemvay sidewalk)
m Water -dependent structures
x
® Minimal footprint uses (utility poles, signs, security
lighting and appurtenances
5. StorEnwater that is not treated in an SCM is released at the
1V'N or N
edge of the setback and a]lowed to flow through the setback as
VJ
dispersed flow.
STORMWATER OUTLETS
OAs-built
ON/E
ON/A
1. the outlet handles the peak flow from the 10-year stone with
no downslope erosion.
Yo or N
VARIATIONS - - - - - -
aAs-built
ON/E
ONIA
1. A variation (alternative) from the stormwater rule provisions
has been implemented.X
Y or N
2. The variation provides equal or better stormwater control and
y N
equal or better protection of surface waters.
or
X
COMPLIANCE WITH OTHER REGULATORY PROGRAMS
OAs-built
OO N/E
ON/A
1. The project is compliant with other applicable regulatory
programs.
�or N
SIZING
OO As -built
OO N/E
ON/A
1. The volume of the SCM takes the runoff from all surfaces into
Y or N
account and is sufficient to handle the required storm depth.
CONTA IINATED SOILS
OO As -built
ON/E
OO N/A
1. Infiltrating SCM's are not located in or on areas with
contaminated soils.
Y or N
X
SIDE SLOPES
OAs-built
OO NIE
ON/A
1. Vegetated side slopes are no steeper than 31i:1 V.
Y or N
X
NCD}Q 2/9/201 S
Project Name ACONY BELL permit # SW8
SW1170501
2. Side slopes include retaining walls, gabion walls, or other
Y or N
X
surfaces that are steeper than 3H:1 V.
3. Vegetated side slopes are steeper than 3H:1 V (provide
Y or N
supporting documents for soils and vegetation).
X
EROSION PROTECTION
OAs-built
ON/E
ON/A
1. The inlets do not cause erosion in the SCM.
Y or N
X
2. The outlet does not cause erosion downslope of the discharge
Y or N
point during the peak flow from the 10-year storm.
X
EXCESS FLOWS
QAs-built
ON/E
ON/A
1. An overflow / bypass has been provided.
Y or N
X
DEWATERING
OO As -built
OO N/E
ON/A
1. A method to drawdown standing water has been provided to
Y or N
X
facilitate maintenance and inspection.
CLEANOUT AFTER CONSTRUCTIONOAs-built
ON/E
ON/A
1. The SCM has been cleaned out and converted to its approved
Y N
X
design state.
or
MAINTENANCE ACCESS
OAs-built
ON/E
ON/A
1. The SCM is accessible for maintenance and repair.
Y or N
X
2. The access does not include lateral or incline slopes >3:1.
Y or N
X
DESIGNER QUALIFICATIONS (FAST -TRACK PERNIHT)
OAs-built
OO N/E
OO N/A
1. The designer is licensed under Chapters 89A, 89C, 89E, or
y� or N
(D
89F of the General Statutes.
Provide an explanation below for every MDC that was not met, and for every item marked "N/A" or "N/E."
Attach additional pages as needed.
This project was des ign ed/perm itte d/constnicted as a low -density design with no permanent SCMs.
NCDEQ 2/9/2018