North Carolina Department of Environmental Quality Division of Water Resources
512 North Salisbury Street 1611 Mail Service Center Raleigh, North Carolina 27699-1611
919.707.9000
December 22, 2022
Granville County
DWR Project No. 20191467 ver 2
Bridge 143 on SR 1442
TIP No. B-5323
MODIFICATION of APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL
CONDITIONS
Mr. Brandon H. Jones, P.E., Division Engineer
NCDOT, Division 5
2612 North Duke Street
Durham, NC 27704
Dear Mr. Jones:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
replacing Bridge 143 in Granville County:
Revised Open Water (Lake) Impacts in the Roanoke River Basin
Site Permanent Fill in Open Waters (ac) Temporary Fill in Open Waters (ac) Total Fill in Open Waters (ac)
Total
0.22
0.38
0.60
Total Revised Open Water Impact for Project: 0.60 acres.
The project shall be constructed in accordance with your application received December 16, 2022. After reviewing
your application, we have decided that these impacts are covered by General Water Quality Certification Number
4135. This certification corresponds to the Regional General Permit 50 issued by the Corps of Engineers. In
addition, you should acquire any other federal, state or local permits before you proceed with your project including
(but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This
approval will expire with the accompanying 404 permit. This approval replaces the one issued on November 5,
2019.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed o ne acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the
conditions listed in the General Certification and any additional conditions listed below.
North Carolina Department of Environmental Quality Division of Water Resources
512 North Salisbury Street 1611 Mail Service Center Raleigh, North Carolina 27699-1611
919.707.9000
Conditions of Certification:
1. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species.
[15A NCAC 02H .0506(b)(2)]
2. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be
accomplished in strict compliance with the most recent version of NCDOT’s Best Management Practices for
Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
3. Bridge deck drains shall not discharge directly into surface waters. Stormwater shall be directed across the bridge
and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.)
before entering the stream. To meet the requirements of NCDOT’s NPDES permit NCS0000250, please refer to the
most recent version of the North Carolina Department of Transportation Stormwater Best Management Practices
Toolbox manual for approved measures. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
4. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction
methods. More specifically, jetting or other methods of pile dr iving are prohibited without prior written approval
from the NCDWR first. [15A NCAC 02H.0506(b)(2)]
5. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters.
This water shall be captured, treated, and disposed of properly. [15A NCAC 02H .0506(b)(3)]
6. A turbidity curtain will be installed in the lake if driving or drilling activities occur within the lake, on the bank, or
within 5 feet of the top of bank, or during the removal of bents from an old bridge. This condition can be waived
with prior approval from the NCDWR. [15A NCAC 02H .0506(b)(3)]
7. All bridge construction shall be performed from the existing bridge, temporary work bridges, temporary
causeways, or floating or sunken barges. If work conditions require barges, they shall be floated into position and
then sunk. The barges shall not be sunk and then dragged into position. Under no circumstances should barges be
dragged along the bottom of the surface water. [15A NCAC 02H .0506(b)(3)]
8. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between
curing concrete and lake water. Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200]
9. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
10. The dimension, pattern and profile of the surface waters above and below the crossing shall not be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)]
11. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for bank
stabilization shall be placed in such a manner that it does not impede aquatic life passage. [15A NCAC
02H.0506(b)(2)]
12. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
13. All work in or adjacent to surface waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC
02H.0506(b)(3) and (c)(3)]
14. Heavy equipment shall be operated from the banks rather than in the surface waters in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)]
North Carolina Department of Environmental Quality Division of Water Resources
512 North Salisbury Street 1611 Mail Service Center Raleigh, North Carolina 27699-1611
919.707.9000
15. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
16. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. [15A NCAC 02H.0506(b)(3)]
17. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited. [15A NCAC 02H.0506(b)(3)]
18. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being
met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A
NCAC 02B.0200]
19. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise
authorized by this certification. [15A NCAC 02H.0506(b)(2)]
20. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and
the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
21. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization, including all non-commercial borrow and waste sites associated with the project, shall be clearly marked
by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless
otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502]
22. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc.
23. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. [15A NCAC 02B.0506(b)(2)]
24. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all
work included in the 401 Certification has been completed. [15A NCAC 02H.0502(f)]
25. Native riparian vegetation (ex. list herbaceous, trees, and shrubs native to your geographic region) must be
reestablished in the riparian areas within the construction limits of the project by the end of the growing season followin g
completion of construction. [15A NCAC 02B.0506(b)(2)]
26. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3)]
27. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards [15A NCAC 02H.0506(b)(3) and (c)(3)]:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
North Carolina Department of Environmental Quality Division of Water Resources
512 North Salisbury Street 1611 Mail Service Center Raleigh, North Carolina 27699-1611
919.707.9000
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
28. Sediment and erosion control measures shall not be placed in wetlands or surface waters, or within 5 feet of the top
of bank, without prior approval from DWR. [15A NCAC 02H.0506(b)(3) and (c)(3)]
29. When applicable, all construction activities shall be performed and maintained in full compliance with G.S.
Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment
and Pollution Control Act, all projects shall incorporate appropriate Best Management Practices for the control of
sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H
.0506{b)(3) and (c)(3) and 15A NCAC 02B .0200]
30. Design, installation, operation, and maintenance of all sediment and erosion control measures shall be equal to or
exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control
Manual, or for linear transportation projects, the NCDOT Sediment and Erosion Control Manual.
All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor-
owned or leased borrow pits associated with the project. Sufficient materials required for stabilization and/or repair of
erosion control measures and stormwater routing and treatment shall be on site at all times.
For borrow pit sites, the erosion and sediment control measures shall be designed, installed, operated, and maintained
in accordance with the most recent version of the North Carolina Surface Mining Manual. Reclamation measures and
implementation shall comply with the reclamation in accordance with the requirements of the Sedimentation Pollution
Control Act and the Mining Act of 1971. [15A NCAC 02H.0506(b)(3) and (c)(3); GC 4135]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except
for official state holidays. The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Bill F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
North Carolina Department of Environmental Quality Division of Water Resources
512 North Salisbury Street 1611 Mail Service Center Raleigh, North Carolina 27699-1611
919.707.9000
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions, please contact Rob Ridings at rob.ridings@ncdenr.gov.
Sincerely,
Richard E. Rogers, Director
Division of Water Resources