HomeMy WebLinkAboutNCC224155_Site Plan or Location Map_20221222VICINITY MAP
NOT TO SCALE
LEGEND:
R/W — RIGHT OF WAY
PROPERTY LINE
ADJACENT PROPERTY LINE
RIGHT—OF—WAY
270 MAJOR CONTOUR
278 MINOR CONTOUR
— SF — SF — SILT FENCE LINE
— LO— roc— LIMITS OF CONSTRUCTION
0INLET PROTECTION
CONSTRUCTION SEQUENCE
1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND
HOLD PRE CONSTRUCTION CONFERENCE.
2. INSTALL STONE CONSTRUCTION ENTRANCE AND TEMPORARY
SILT FENCE WHERE SPECIFIED.
3. CLEAR AND GRUB THE SITE AS NEEDED.
4. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED
AREAS.
5. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO
REMOVE ALL TEMPORARY MEASURES.
6. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED
AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND
ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL.
7. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL
STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST
BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF
TERMINATION (NOT). THE NOT IS AVAILABLE AT:
HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION.
PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT
MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE
OF TERMINATION PROCESS.
EROSION CONTROL NOTES
1. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT
FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE.
THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO
MAINTAIN A PROPER BARRIER.
2. TEMPORARY EROSION CONTROL FACILITIES AND/OR
PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF
AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED
BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE
OR AT THE EARLIEST POSSIBLE POINT DURING
CONSTRUCTION.
3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES
SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR
SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH
CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL.
4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ
OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY
LAND DISTURBING ACTIVITIES. 910-433-3300
5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE
DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS.
REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING
OCCURS.
6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET
FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE
CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS,
STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS,
OR OTHER MEANS. CONTROL EROSION FROM ALL
STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES.
TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES
MUST BE NO LESS THAN FIVE FEET FROM THE
DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT
MORE THAN 24 HOURS.
7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL
DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE
AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION
AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND
REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION
CONTROL DEVICES IMMEDIATELY.
N /F
BRANTLEY ALLEN TURNER &
CINDY TURNER
DB 11522, PG 491
GROUND STABILIZATION CHART
SITE AREA
STABILIZATION
STABILIZATION TIME
DESCRIPTION
TIME FRAME
FRAME EXCEPTIONS
PERIMETER DIKES,
SWALES, DITHCES
7 DAYS
NONE
AND SLOPES
HIGH QUALITY WATER
(HQW) ZONES
7 DAYS
NONE
IF SLOPES ARE 10' OR
SLOPES STEEPER
7 DAYS
LESS IN LENGTH AND ARE
THAN 3:1
NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED
SLOPES 3:1 OR
7—DAYS FOR SLOPES
FLATTER
14 DAYS
GREATER THAN 50 FEET
IN LENGTH
NONE
ALL OTHER AREAS
(EXCEPT FOR
WITH SLOPES FLATTER
14 DAYS
PERIMETERS AND
THAN 4:1
HQW ZONES)
I
— . ---r . _
NOTIFICATION OF COMBINED SELF -MONITORING AND
SELF -INSPECTION FORM:
THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN
2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR
LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH
PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN IS BEING
FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE
INSPECTIONS TOOK EFFECT OCTOBER 1, 2010.
TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS
AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR
DEVELOPED A COMBINED FORM. THE SELF -INSPECTION
PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING
PROGRAM OF THE NPDES STORMWATER PERMIT FOR
CONSTRUCTION ACTIVITIES. THE FOCUS OF THE
SELF -INSPECTION REPORT IS THE INSTALLATION AND
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL
MEASURES ACCORDING TO THE APPROVED PLAN. THE
INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF
THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND
COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT:
--F-- \ HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION
IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM,
i PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910)
/ \ \ 433-3300.
\ 8. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL
10 / /\ \ DEVICES STA FTER THE ION PROTECTED
ND AREANENT HASVEGUNDERGONE
TION HAS
BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ
r\ 27 / 25,E / / I APPROVE THE ACTION PRIOR TO REMOVAL.
I 9. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED
CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION
L \ ACTIVITY.
10. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL
A TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION
ACTIVITIES.
11. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE
ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES
/ PERFORMING WORK ON THIS PROJECT.
12. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
/ / \ 24 I / \ / \ \ CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
I RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN
ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE
/ \ _ 64— �IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
�1 113. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED 12, SLOPES AND FILLS SHALL BE NO GREATER THAN THE
28 / 'sR\ <O ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR
OTHER ADEQUATE EROSION CONTROL DEVICES OR
STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL,
WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY
' PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED
G \ / 23,E I / \ 0, WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES
<O
n OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION.
PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR
I 00. / \ \ PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION
< MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN
G o0 13 001 90 CALENDAR DAYS FOLLOWING COMPLETION OF
CONSTRUCTION OR DEVELOPMENT.
C, 1 01 00 14. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION
\ / 22 CONTROL MEASURES SHOWN AND ANY ADDITIONAL
I r 22, / \ MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING
00 THE COURSE OF CONSTRUCTION.
G <O 15 THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT
ARISE ON SITE IS GREG CAULDER. CONTACT
14
(919)-802-4959.
701 �
� / �°c \
NO
J°� k
60
n
� I\
r
o
31
\ \ /
� N /F
5� T� �6 \ \ \ / / 00, ERAN CE CCCANADY&
soANADY
��-� DB 4707, PG 25
U, I IF\ 18 i P B 51, PG 48
00
z
o
17
m
/ r
z
------
/ SURVEY NOTE:
INFORMATION USED FOR THIS SITE WAS PROVIDED BY HASTY N/F
® \ LAND SURVEYING, PLLC, 102 SHANNON ROAD, RED SPRINGS, NC \ I ERNEST T CANADY &
28377, 910-843-4510. \ / \ JANICE C CANADY
\ - / I�
THE SURVEY CAN BE FOUND AT CUMBERLAND COUNTY DB 2381, PG 611 GRAPHIC SCALE
REGISTER OF DEEDS IN PLAT BOOK 148, PAGE 29 RECORDED r 100 0 50 100 200
Know what's below. MARCH 16, 2022. I I 111!!"
Call before you dig. ` / 1
I_ ( IN FEET )
/ 1 inch = 100 ft.
I I
\ � J
THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED
701
X /
/ r\20;
/
*TOTAL DISTURBED AREA: /
7.1 AC / r 19 -\
400
4Dsite
solutions
civil engineering I land surveying
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1910-426-6777 fax 1910-426-5777 license number I C-2354
wwwAD site solutions.com
.•••• ••.
•% `9 i
• 4� SEA
• 0274
COT T
1 v-12-2,2
REVISIONS
PROJECT NAME
HALL'S FARM
SUBDIVISION
LOTS 13=1 61
29 &30
OVERALL
EROSION
CONTROL PLAN
CLIENT
GMC
CONSTRUCTION OF
NC, INC
9820 US Hwy 301 North
Lumberton, North Carolina 28360
Phone: (910) 802-4959
PROJECT INFORMATION
DESIGNED BY:
BRETT
DRAWN BY:
BRETT
CHECKED BY:
SCOTT
PROJECT NUMBER:
1950
DRAWING SCALE
HORIZONTAL: 1 "=100'
DATE RELEASED
OCTOBER 12, 2022
SHEET NUMBER
C-1 00