Loading...
HomeMy WebLinkAbout20090692 Ver 2_Notice of Violation_20141017SHAW, LAND INVESTMENTS & MANAGEMEIN NCDENR Attn: Jim Gregson, Regional Supervisor 127 Cardinal Drive Extension Wilmington, NC 28405 Subject: Notice ♦ Violation if •• SaT1 erry DWQ Project # 2009 0692 V2 *nslow County Z��M Per your request, I am writing to respond to your Notice of Violation I received electronically Monday October 6, 2014. In addition to your letter, I received a letter from Daniel Sams, PE of the Land Quality Section. I met Van Narron, my infrastructure contractor, on site Wednesday October 8t" and reviewed both list with him. They started work on site with a small crew that day and brought a much larger crew in the following day to perform the hand work. The explanation for the impacts is primarily the enormous amount of rain that occurred right after the infrastructure work had taken place. In addition, we determined that one of the ponds needed to be doubled in size to avoid problems in the future and that was completed. The wetland impacts were removed by hand Thursday October 9th. Going forward we are pushing start construction to complete the project over the next month. 4"incerely, Topsail Bluff, LLC 1031 S Caldwell St. Suite 220 Charlotte, NC 28203 cc: Shelton Sulivan Joanne Steenhuis Karl Hammers Ken Johnson 1031 SOUTH CALDWELL STREET, SUITE 220 - CHARLOTTE, NC 28203 (704) 527-0204 - FAX (704) 527-0828 - WWW,SHAWTATE.COM