Loading...
HomeMy WebLinkAboutSW4220601_Supplement-EZ Form_20221221SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Havenbrooke SubdMsion 2 Project Area ac 74A9 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0.78 5 is this project High or Low Density? Low 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Sioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 i8and Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS) 20 Disconnected Impervious Surface (DI5 21 Treatment Swale 22 23 Q Pond StormFilter 24 Silva Cell 25 Bayfilter 2$ Filterra FORMS LOADED Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowiedge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ¢ttttsrtet#, 4•; �,rESS/O �y �Q ter• SEAL • 18584 Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areaslSCMs 0 3 Does this project have low density areas? Yes 4 if so, number of low density drainage areas 1 5 is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site I.D 1 4 'Type of SCM NIA NIA 5 Total drainage area (sq ft) 3,276,616 3,276,616 6 Onsite drainage area sq ft 3,231,716 3,231,716 7 Offske drainage area ft 44,900 44,900 8 Total BUA in Nject sq ft 358388 sf 358388 sf 9 New BUA on subdivided lots (subject to permitting) s ft) 213000 sf 213000 sf 10 New BUA not on subdivided lots (subject to permittin sn 127983 sf 127983 sf 11 lOffsite BUA (sq ft 17405 sf 17405 sf 12 Breakdown of new BUA not on subdivided lots: - Parkina (so ftl sf sf Sidewalk �sq ft) 18438 sf 18438 sf Roof (sq ft sf sf Roadway s ft) - Future (sq ft 109545 sf 109545 sf sf sf [- Other, please specify in the comment box below(so ft Sf sf 13subdivided New infiltrating permeable pavement on lots (sq ft) sf sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft) sf sf 15permitting) Existing BUA that will remain (not subject to s ft sf sf 16 ExistingBUA that is already permitted (sq ft sf sf 17 "sting BUA that will be removed (sq ft sf sf 18 Percent BUA 11% 11% 19 20 21 [Calculation AAi11T1A\I Desi n storm inches Design volume of SCM cu ft) method for design volume AI Ia,�we�a• a �,w.. NIA NIA NIA NIA N/A Irlq l Ivlr Please use this space to provide any additional information about the - drainaae arealsl single family LOW DENSITY D IGN RE UIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 Is project below density thresholds set forth in the applicable slormwater rule? Yes 1 2 Does project maximize dispersed flow and minimize chennelization of flow? Yes 3 Has the use of piping been minimized per. 1003(2)(.)? No 4 Side slopes of the vegetated conveyances (H:V) 3 sf 5 6 Maximum velocity, in the vegetated conveyances during the 10-year storm? Are curb outlet swales proposed? 4.53 No 7 Maximum longitudinal slope of curb outlet swale(s) (%) No 8 Bottom width of curb outlet swale(s) (feet) No 9 Maximum aide slope of curb outlet swale(s) (H:V) No 10 Minimum length of curb outlet swale(s) (feet) No Are treatment swaies used instead of curb outlet swales? No r14 Is stormwater released at the edge of the setback as dispersed flov. ? Yes Have stormwater outlets been designed 10 prevent downslope erosion? Yes Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 iPlease use this space to provide any additional information about this low density project: Line 4 is nut formatted properly. The side sle es are 3:1 Swale # Drainage Area ae BUA (aaJ Pervious area (at),(cfs) C Q Stop. {y,) V,i - (fps) V,�, (fps) Flow depth {ft) 1 0.35 0.16 0.19 0.50 1.2D 3.00 5.00 1.41 0.30 2 0.19 0.05 0.14 0.50 0.$5 2.76 5.00 1.05 0.23 3 5.02 0.85 4.17 0.50 13.73 4.26 5.00 2.88 0.97 4 0.61 0.10 0.51 0.50 2.09 4.27 5.00 1 A4 0.44 5 0.37 0.11 0.26 0.50 1.27 4.64 5.00 1.24 0.34 8 T 8 1.42 5.84 2.70 0.07 0.00 1.12 1.35 5.84 1.58 0.50 0.50 0.50 4.86 15.97 7.38 4.60 4.18 4.21 5.00 5.00 5.00 2.06 4,53 3.42 0.61 0.80 0.58 9 3.57 0.07 3.50 0.50 8.15 5.00 5.00 3.90 0.56 10 7.84 1.46 6.38 0.45 18.73 5.00 S.pO 3.60 1.06 11 0.93 0.24 0.69 0.50 3.18 2.20 5.00 1.73 0.52 12 3.41 0.19 3.22 0.50 8.85 3.80 5.00 3.46 0.65 13 0.36 0.06 0.30 0.50 1.23 1.77 5.00 1.07 0.37 14 1.56 0.00 1.58 0.50 4.05 4.19 5.00 2.72 0.45 15 2.82 1.04 1.78 0.60 7.32 4.76 5.00 3.66 0.55 16 1.68 0.65 1.03 0.50 5.79 2.34 5.00 2.24 0.06 17 4.36 0.39 3.97 0.45 13.42 5.00 5.00 3.13 0.91 1s 19 20 21 22 23 24 25 28 27 28 29 30