HomeMy WebLinkAboutNC0069256_Monitoring Requirements Request_20150209 liwistiorrrAIGNE
arc.
Delivering America's Fuel Supply,on Demand
RECEIVED/DENR/DWR
February 5, 2015 FEB 0 9 2015
Water Quality
Permitting Sectior
Charles Weaver
Division of Water Resources
WQ Permitting Section - NPDES
1617 Mail Service Center
Raleigh, NC 27699-1618
RE: TransMontaigne - Greensboro Piedmont Terminal
NPDES Permit# NC0069256
Dear Mr. Weaver,
The purpose of this letter is to formally request that all NPDES monitoring and reporting
requirements (i.e., sampling/analytical work and DMR submissions) for the above referenced
facility be suspended. The basis for this suspension request is simple: All of the tanks, piping, and
equipment at this facility were completely evacuated of all products in January 2007, and the
facility has been completely empty and idle since that time. In addition, the DMR record from
2007 to present has been completely free of permit excursions. There are currently no plans to
"reactivate" this terminal to any extent.
Given the current status/history of the site, it seems unnecessary to continue monitoring the
associated stormwater for the various parameters prescribed in the permit or submitting DMRs.
Should there be changes to the anticipated use of this facility(i.e., plans to begin storing/handling
products again), we would, of course, notify your office and plan to resume all required monitoring
and reporting.
Thank you for your consideration of this matter. If there are any questions regarding this request,
please don't hesitate to contact me at 770/518-3651 or by email at:
tyancey@transmontaigne.com
Sincerely,
e
Tim Yanc
Environmental Specialist
200 Mansell Court East Phone: (770)518-3500
Suite 600 Fax: (770)518-3755
Roswell, GA 30076