Loading...
HomeMy WebLinkAbout20221789 Ver 1_M73_Cardinal to NC State 404_401_Buffer Determination Cover Letter - signed_20221220Dominion Energy North Carolina, Inc. P.O0 Dominion Energy, 800 Gaston Road, Building A Gastonia, NC 28056 December 16, 2022 Attention: U.S. Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Reference: For the Record Only - Section 404 Nationwide Permit (SAW-2022-01049), Section 401 Water Quality Certification, and Riparian Buffer Authorization DENC M-73 Cardinal to NC State Pipeline Project, Wake County, North Carolina HDR Engineering, Inc. (HDR), on behalf of Dominion Energy North Carolina (DENC), is submitting a Pre - Construction Notification (PCN) solely for the record for unavoidable impacts to surface waterbodies and regulated riparian buffers related to the proposed DENC M-73 Cardinal to NC State Pipeline Project (Project). HDR has calculated impacts for the PCN package and determined that impacts to surface waters comply with the non -notifying conditions of the U.S. Army Corps of Engineers (USACE) Nationwide Permit 12 and the USACE Wilmington District's Regional Conditions. These impacts also comply with the thresholds and circumstances listed eligible for coverage under the North Carolina Division of Water Resources (NCDWR) General Certification Coverage (GC 4244) and activity -specific conditions. Unavoidable impacts to regulated riparian buffers are "Deemed Allowable" according to the Neuse River Basin Buffer Rules (15 NCAC 02B.0714) Table of Uses. The proposed Project will involve the installation of a new 12-inch-diameter, steel, high-pressure gas pipeline that will improve system reliability to the growing populations of southern and central Wake County. This will allow more flexibility for supplying Liquified Natural Gas (LNG) to customers during times of peak use and decrease the need for demand -related service interruptions. The new pipeline will be approximately 10.6 miles (55,968 linear feet) in length with tie-ins at the Cardinal Pipeline, NC State power generation facility, and a new pressure regulating station located along Centennial Parkway in Raleigh, North Carolina. The route will use public right-of-way and will be co -located with other utilities within the public right-of-way. Private property will mainly be utilized in select areas for temporary work space. The pipeline will be constructed via open cut and trenchless horizontal directional drilling (HDD) methods. The portions of pipeline to be installed via HDD are expected to be installed beneath Interstate 40 (1-40) and existing surface water features; specifically, Swift Creek, Yates Mill Pond, and Walnut Creek. Construction is expected to begin in March 2023 and be completed by December 2023. HDR and DENC participated in a virtual pre -application meeting with USACE and NCDWR representatives on July 15, 2022, to discuss the proposed Project activities and notification requirements. The Project was designed to avoid and minimize impacts to aquatic resources and regulated riparian buffers, and comply with specific permit conditions. We request that you review the electronic PCN package and provide written concurrence that the proposed Project activities comply with the non -notifying conditions of the USACE's Nationwide Permitting Program, are eligible for coverage under NCDWR's General Certification (GC 4244), and will not require an Individual 401 Water Quality Certification. Lastly, please confirm that impacts to regulated riparian buffers are Deemed Allowable without authorization based on the Neuse River Basin Buffer Rules (15 NCAC 0213.0714) Table of Uses. Please contact Katy Mays via telephone at (803) 563-4964 or by email at katy.d.mays@dominionenergy.com at your earliest convenience if you have any questions or need additional information regarding this application. Sincerely, Darrell R. Shier Authorized Representative Manager, Environmental Services Attachments: USACE Preliminary ORM Data Entry Fields for New Actions Form Pre -Construction Notification Form 401 Pre -Filing Request Agent Authorization NCDWR Buffer Determination Letter Figures Project Impact Drawings US Fish and Wildlife Services Consultation NC State Preservation Office Consultation cc: Rhonda Lemons, DENC Katy Mays, DENC Chad Jacobs, HDR Eric Mularski, HDR Pi