HomeMy WebLinkAbout20221789 Ver 1_401PreFilingRequest_20221220Mularski, Eric
From: Mularski, Eric
Sent: Monday, May 9, 2022 4:41 PM
To: 401 PreFile@ncdenr.gov
Cc: katy.d.mays@dominionenergy.com; AARON SCHWARTZ (Services - 6); Jacobs, Chad
Subject: 401 Pre -filing Meeting Request - DENC - M-73 Cardinal to NC State University Pipeline
Project - Pre -Filing Meeting Request
HDR, on behalf of our client Dominion Energy North Carolina (DENC), is submitting a 401 pre -filing meeting
request for the proposed Cardinal to NC State Pipeline Project in Wake County, North Carolina. Please find the
attached cover letter and exhibits. The project may result in unavoidable impacts to surface waters and may
require a Clean Water Act Section 401 Water Quality Certification authorized by the N.C. Division of Water
Resources (NCDWR).
We would like to schedule meeting with the NCDWR to discuss this project. If you have any questions or
require additional information, please contact Kay Mays at (803) 563-4964 or at
katy.d.mays(a)dominionenergy.com
Thank you,
Eric Mularski, PwS
Environmental Sciences & Planning Manager
HDR
440 S. Church Street
Charlotte, NC 28202
D 704-973-6878 M 704-806-1521
Eric. mularski(cDhdrinc.com
hdrinc.com/follow-us
Dominion Energy South Carolina � Dominion
220Operation Way, VICC221 Energy
Cayce, SC 29033
May 9, 2022
North Carolina Department of Environmental Quality
Division of Water Resources
217 West Jones Street
Raleigh, NC 27603
401 PreFile(o)_ncdenr.gov
Attention: Paul Wojoski, Supervisor
401 & Buffer Permitting Branch
Reference: Section 401 Pre -Filing Meeting Request
DENC - M-73 Cardinal to NC State University Pipeline Project
Email Transmittal
Dear Mr. Wojoski:
In accordance with the September 11, 2020 issuance of the Clean Water Act (CWA) Section 401
Certification Rule (85 Fed. Reg. 42,210 [July 13, 2020]), please consider this email and attached
supporting information as our request for a pre -filing meeting with NC DEQ-DWR in connection
with the Dominion Energy North Carolina (DENC) M73- Cardinal to NC State University Pipeline
Project.
Project Description
The proposed project corridor will extend from the Town of Fuquay-Varina to the City of Raleigh
along Lake Wheeler Road to Centennial Parkway in Wake County. This area is primarily
composed of maintained right-of-way, forested land, residential area, farmland, and urbanized
development (Figures 1 and 2). The proposed Project will involve installation of a new 12-inch-
diameter, steel high-pressure gas pipeline that will improve system reliability to the growing
populations of southern and central Wake County.
The new pipeline will be approximately 10.6 miles (55,968 linear feet) in length with tie-ins at the
Cardinal Pipeline, NC State power generation facility, and a new pressure regulating station
located along Centennial Parkway in Raleigh, NC. The proposed pipeline will improve system
reliability to the growing populations of southern and central Wake County. This will allow for
more flexibility for Liquified Natural Gas (LNG) during times of peak use and will decrease the
need to interrupt large customers during peak usage. Design and permitting is expected to be
finished by end of 2022 and construction to begin in January 2023.
Construction of the pipeline will utilize trenchless, open cut, and horizontal directional drilling
(HDD) methods. The portions of pipeline to be installed via HDD are expected to be beneath
Dominion Energy South Carolina � Dominion
220Operation Way, VICC221 Energy
Cayce, SC 29033
Interstate 40 and existing surface water features, specifically, Swift Creek and an unnamed
tributary to Swift Creek downstream of Yates Mill Pond (Figure 3).
Between February 16 — 18, 2022 and follow up survey on April 7, 2022, HDR biologists surveyed
the Study Area for the presence of wetlands and jurisdictional waters of the U.S. regulated under
Section 404 of the Clean Water Act. On -site reconnaissance identified 16jurisdictional streams
and 14jurisdictional wetlands within the proposed route. The assessment was completed as part
of HDR's initial Project site evaluation to identify key environmental resources to be considered
for permitting and/or design.
Project review consultation letters have been submitted to the U.S. Fish and Wildlife to comply
with Section 7 of the Endangered Species Act and to the N.C. State Historic Preservation Office
to comply with Section 106 of the National Historic Preservation Act. As of date, agency
responses have not been received.
Thank you for your assistance with respect to this project. Please contact Katy Mays via
telephone at (803) 563-4964 or by email at katy.d.maysC�dominionenergy.com if you have any
questions or require additional information in advance of coordinating the Pre -Application
Meeting.
Jason Ericson
Director -Environmental Services
Dominion Energy
CC: Darrell Shier (DEES), Katy Mays (DEES), Eric Mularski (HDR)
Attachments:
Preliminary ORM Form
Figure 1. Project Vicinity
Figure 2. USGS 7.5-Minute Quadrangles
Figure 3. Delineated Waters of the United States
Pa
Preliminary ORM Data Entry Fields for New Actions
ACTION ID 4: SAW- Begin Date (Date Received):
Prepare file folder ❑ Assign Action ID Number in ORM ❑
1. Project Name [PCN Form A2a]: DENC-M-73 Cardinal to NC State University Pipeline Project
2. Work Type: ❑Private ❑Institutional ❑Government ❑ Commercial
3. Project Description / Purpose [PCN Form 133d and 133e]:
The proposed Project will involve installation of a new 12-inch-diameter, steel high-pressure gas pipeline that will improve system
reliability to the growing populations of southern and central Wake County.
The new pipeline will be approximately 10.6 miles (55,968 linear feet) in length with tie-ins at the Cardinal Pipeline, NC State power
generation facility, and a new pressure regulating station located along Centennial Parkway in Raleigh, NC. The proposed pipeline wil�
4. Property Owner / Applicant [PCN Form A3 or A41: DEES: Jason Ericson, Director - Environmental Serw
5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]:
HDR Engineering POC: Eric Mularski, (704) 937-6878 or at eric.mularski@hdrinc.com
6. Related Action ID Number(s) [PCN Form 135b]: NA
7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]:
Linear Project. Town of Fuquay-Varina northward to the City of Raleigh along Lake Wheeler Road to
Centennial Parkway in Wake County (35.647031 °,-78.722400' to 35.775768°,-78.671327°).
8. Project Location —Tax Parcel ID [PCN Form Bla]: Project traverses through multiple parcels
9. Project Location — County [PCN Form A2b]: Wake
10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Raleigh
11. Project Information — Nearest Waterbody [PCN Form 132a]: Walnut Creek and Swift Creek
12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: 03020201 Upper Neuse
Authorization: Section 10 ❑ Section 404 ✓❑
Regulatory Action Type:
❑ Standard Permit
Nationwide Permit 4
Regional General Permit 9
Jurisdictional Determination Request
Section 10 and 404 ❑
OPre-Application Request
❑ Unauthorized Activity
❑ Compliance
❑ No Permit Required
Revised 20150602
Gt�lree C�
LEGEND
sdk�-un E3
Lkn Stead
Study Area (173 acres) case Peek
DATA SOURCE: Esri World Topographic Basemap _
Ir
+ m
If
0 Miles 2 �y�
d de.
'4 Ye—
Cary
d
k
Nbr G rsgo r
Downs
Country
C lu
gyp+!
Devil s
+Pangs Ridge
Golf
C lub
Ir�ei[5r1
C ieek
Pa rk
Alf •�tiilllo�y spring
Cree4
Fuqua ; -Vann 1 Wake
Study Area County
I .
CARDINAL TO NC STATE PIPELINE
Nepor Energy
Dominion
Energy PROJECT VICINITY
FIGURE 1
PATH .�CI-TENIA IH\_ A\GI:\PaoJEOT-55 _ MIHION ENE RGYNC 0330 _ RDIN _ E LN\7.2_WO RKINPOGREEE—P_ o:\M.D\TE CHNIEMo -CARDINAL _ NOD DEER.DEIARCHIDa-DATE .o 22022 TECHNICAL MEMORANDUM
V,
E-:VV H E E L E
FA 16dO A Ei
t,
log
OW
UNA
ow"Mme'ek'AW
i
-.. V; r I SZ �
go
rjI
P,
EE
i
EELER� Ii . _
�r `TN c �1 r
M.
rm
LEGEND `'''�Gr9. ■�; .. �
�- Study Area (173 acres)
Photo Location
Wetland Data Point
Upland Data Point y
Culvert 4 f
Delineated Perennial Stream +
Delineated Intermittent Stream
Delineated Stream
Delineated Open Water U
® Delineated Emergent Wetland
® Delineated Forested Wetland
DATA SOURCE: Bing Hybrid Aerial Imagery
0 Feet 500
-
tiV f •��. 3 s- 0 Feet 50
-' w�ostred
_- � Brae st4a trnUes
-
v� I
� Stream 14
i Intermittent
. f 501f
� .
1:' I• ' `'w yy
1
C
r
Open Water 2
0.15 ac
r `
CARDINAL TO NC STATE PIPELINE
FNNePOO' Dominion
Energy DELINEATED WATERS OF THE U.S.
FIGURE 3 - PAGE 1 OF 12
PATH .,,DI-TENW, IH, _ A\G IS\PNOJE CT-55690-D OMIN ION ENE aD.HD„033o _ RDIN _ E LN\7.2_ -- OGRESS, _ DE,M.D,TE _ MO\ORIGIH _ HME _ UREa _ RDIH _ UE.M.D DEER.DEM,aDHICA DATE.4/2—::TECHNICAL MEMORANDUM
000000000
Stream 17
Intermittentl
127 If
L 1O
Stream 12
Perennial
497 If
' R
9j Stream 11 '
�Je a Intermittent ,
oo�`� aye 35 If 4
t� awe 6A
00 �\ae
0 Fee{ avv S a
Wetland 13
,* Emergent
0.74 ac
Stream 16
Perennial
685If
1
Wetland 14
Emergent
0.29 ac
Stream 10
[Walnut Creek)
Perennial
589 If
0
Wetland 8
Forested -`
0.37 ac
LEGEND
Study Area (173 acres)
■
Photo Location
Wetland 12
0 Wetland Data Point
Emergent
Upland Data Point
5.55 ac
Culvert
Delineated Perennial Stream
Delineated Intermittent Stream
f
Delineated Stream
Delineated Open Water
Wetland 12
_ Delineated Emergent Wetland
Forested
�/!� Delineated Forested Wetland
5.55 a ac�7T11
.5
�i
■
DATA SOURCE: Bing Hybrid Aerial Imagery
�4 M
0 Feet 500
Wetland 12
Forested
5.55 ac
Stream 15
Perennial 99 Y
38,511 4 ,
`l Wetland 9
i Forested
' a.82 c
Stream 9
Perennial
14 If V
Stream 13
I ntermittent
400 1f
i
f.
CARDINAL TO NC STATE PIPELINE
FNNePOO' Dominion
Energy DELINEATED WATERS OF THE U.S.
FIGURE 3 - PAGE 2 OF 12
PATH .�CI-TENIA IH\_ A\G IS\PNOJE CT-55690-D OMIN ION ENE RGYNC 0330 _ RDIN _ E LN\7.2_WO RKINPOGREEE—P_ o:\M.D\TE CHNIEMO\03.2-CARDINAL_WOUE.NIX D USER.DMARCHICa-DATE .4a 022 TECHNICAL MEMORANDUM
LEGEND
F-1 Study Area (173 acres)
114
�• Yam'
WetlandPhoto Location
Data Point13
Culvert
Upland Data Point
iyf i i K1 -a�
Delineated Perennial Stream
Delineated Intermittent Stream
Delineated Stream
E7 t...
s•- — v pF� + i �.
Delineated Open Water+
Delineated
Delineated Forested Wetland III
DATA •
Wf
s
- AIDS J O t Jw Z� L ` •'.
Q. •-T r Mok r "IN
4) fc-Aw At
+ e �
Pff
JA
1_ �! s �g •YP
Y� ��J L"ct16 ` �. .. •fit .•r
CARDINAL TO NC STATE PIPELINE
pr Dominion
Energy DELINEATED WATERS OF THE U.S.
FIGURE 3 - PAGE 4 OF 12
PATH .�CI-TEEAIH\_ A\G IS\PNOJE CT-55690-D OMIN ION ENE RGYNC,o330 _ RDIN _ E LN\7.2_WO RKINPOGREEE\_ o:\M.D\TE CHNIEVO\03.3_7CARDIN _WOUS.NIX D DEEa.DEV,aoxIoa DATE.4-022 TECHNICAL MEMORANDUM
pF LEGEND
Study Area (173 acres)
Photo Location
Wetland Data Point
Upland Data Point
Culvert
Delineated Perennial Stream
Delineated Intermittent Stream
Delineated Stream
Delineated Open Water
® Delineated Emergent Wetland
® Delineated Forested Wetland
DATA SOURCE: Bing Hybrid Aerial Imagery
Milli 0 Feet 500
%
i.sfii
CARDINAL TO NC STATE PIPELINE
PtDominion
por Energy DELINEATED WATERS OF THE U.S.
FIGURE 3 - PAGE 5 OF 12
PATH .�CI-TEEAIH\_ A\G IS\PNOJE CT-55690-D OMIN ION ENE RGYNC 0330 _ RDIN _ E LN\7.2_WO RKINPOGREEE\_ o:\M.D\TE CHNIEVO\03.3_7CARDIN _WOUS.NIX D DEEa.DEV,RCHICA DATE.4-022 TECHNICAL MEMORANDUM
Study Area (173 acres)
�dPhoto Location
d Data Point
Upland D. Point
DelineatedCulvert J
Perennial Stream
Perennial
Delineated Intermittent StreamIf
f ... ��.
Delineated Stream
Delineated Open Water
Delineated Emergent Wetland
010 Delineated Forested Wetland
DATA SOURCE: Bing Hybrid Aerial Imagery 4
a
. Feet 500
qa s
till
�22'or
�[
i A
Rom/ as
77
Jb
¢a
r '- • 4 Sidney Rd. - y
C
zt
d asi :o • � :J
LEGEND
Study Area (173 acres)
Photo Location
!�
Wetland Data Point
41
Upland Data Point
R
Culvert
Delineated Perennial Stream
Delineated Intermittent Stream
Delineated Stream
Delineated Open Water
® Delineated Emergent Wetland.
® Delineated Forested Wetland
DATA SOURCE: Bing Hybrid Aerial Imagery
Streamy
Perennial
1
182 if
A 0 Feet 500
z;
Stream 6 (Swift Creek)
Perennial
286 If
Wetland 7
Forested
1.06 ac
F
CARDINAL TO NC STATE PIPELINE
FNNePOO' Dominion
Energy DELINEATED WATERS OF THE U.S.
FIGURE 3 - PAGE 8 OF 12
PATH .�CI-TENIA IH\_ A\G IS\PNOJE CT-55690-D OMIN ION ENE RGYNC,o330 _ RDIN _ E LN\7.2_WO RKINPOG RES S\IVAPDo:\M.D\TE CHNIEVO\03.3_7CARDIN _WOUS.NIX D DEEa.DEV,RCHICA DATE.4-022 TECHNICAL MEMORANDUM
P.,Iad Of
A
-40-
E
LEGEND
Study Area (173 acres)
Photo Location
Wetland Data Point
Upland Data Point
Culvert
Delineated Perennial Stream
Delineated Intermittent Stream
Delineated Stream
Delineated Open Water
® Delineated Emergent Wetland
® Delineated Forested Wetland
DATA SOURCE: Bing Hybrid Aerial Imagery
0 Feet 500
FN PIP ft
Dominion
Energy
g�k m CD0-
,
o
y
Wetland 6 ) (D Wetland 6
Forested Emergent
0.005 ac 0.013 ac �=
7;14'
Stream 4 y13�
Intermittent
24 If
.w
175 T
Open Water 1
outside study area::
ti ' Wetland 5
�. F outside study area
A ,
Wetland 4
Emergent/wetjlandEream
, Stream 3
0.04 acPerennial
12 If
1
continue
dy area
0 Feet 100 s
f d
CARDINAL TO NC STATE PIPELINE
DELINEATED WATERS OF THE U.S.
FIGURE 3 - PAGE 10 OF 12
PAT—TLTENW, IH, _ A\G IS\PNOJE CT-55690-D OMIN ION ENE aD.HD„033o _ RDIN _ E LN\7.2_WO RKINPOGRESS, _ DE,M.D,TE CHNIEMo,03 OCARDINA LWOUS.MXD DEER.DEM,aDHICA DATE.•a:ao:2 TECHNICAL MEMORANDUM
LEGEND
Study Area (173 acres)
Photo Location
Wetland Data Point
Upland Data Point
Culvert
Delineated Perennial Stream
Delineated Intermittent Stream
Delineated Stream
Delineated Open Water
® Delineated Emergent Wetland
® Delineated Forested Wetland
DATA SOURCE: Bing Hybrid Aerial Imagery
t 0 Feet 500
00
x
Wetland 4 0
Emergent
0.04 ac Stream 3
Perennial l
12 If
`1 y
r /9 }c
wetland tream continue '
out a study area
18 `• �'
f�` r
0 Feet 100
Stream 2
Intermittent
21 If
0 Feet 75
�j 0 Feet 200
Wetland2
Emergent
0.05 ac
Stream 1
Intermittent
s�5) 10 If
stream continues
outside study area
CARDINAL TO NC STATE PIPELINE
FNNePOO' Energy
Dominion
Energy DELINEATED WATERS OF THE U.S.
FIGURE 3 -PAGE 11 OF 12
PATH .�CI-TSVAIN\_ A\G IS\PNOJE CT-55690-D OMIN ION ENE aD.HDA0330 _ RDIN _ E LN\7.2_WO RKINPOGREEE\_ o:\M.D\TE CHNIEMoro -CARD IN_WOUE.M.D DEEa.DEy,RCHICA DATE.oa:ao:: TECHNICAL MEMORANDUM
LEGEND
Study Area (173 acres)
Photo Location
Wetland Data Point
Upland Data Point
Culvert
Delineated Perennial Stream
Delineated Intermittent Stream
Delineated Stream
Delineated Open Water
® Delineated Emergent Wetland
® Delineated Forested Wetland
DATA SOURCE: Bing Hybrid Aerial Imagery
0 Feet 500 I:
rl
0 Feet 200
Wetland2
t Emergent
0.05 ac
Stream 1
`z Intermittent
10 If
s
str am continues
outside study area
I
v-
Wetland 1
Emergent
0.001 ac
•.ter.
CARDINAL TO NC STATE PIPELINE
If FNNe
POO' Energy
Dominion
Energy DELINEATED WATERS OF THE U.S.
FIGURE 3 - PAGE 12 OF 12
PATH .�CI-TENIA IH\_ A\G IS\PNOJE CT-55690-D OMIN ION ENE RGYNC 0330 _ RDIN _ E LN\7.2_WO RKINPOGREEE—P_ o:\M.D\TE CHNIEMo\03.1 2-CARDINA L_WOUE.NIX D DEER.DEI,aDHICA DATE.4-022 TECHNICAL MEMORANDUM