Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW5220801_Design Calculations_20221220
Storm Water & Erosion Control Design Calculations December 20, 2022 Dollar General ___ White Cross Rd/NC HWY 54 W Orange County Prepared for: Glandon Forest Equity, LLC 3825 Barrett Drive, Suite 100 Raleigh, NC 27609 Prepared by: Bowman North Carolina, Ltd. 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 (919) 553-6570 FIRM# F-1445 Bowman TABLE OF CONTENTS OVERVIEW STORMWATER NARRATIVE FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP SURFACE WATER CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREOUENCY ESTIMATES DRAINAGE AREA MAPS WATER QUANTITY/QUALITY NUTRIENT CALCULATIONS STORMWATER WETLAND CALCULATIONS CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY POND OUTLET/STRUCTURE SUMMARY TIME OF CONCENTRATION DRAINAGE DESIGN EROSION CONTROL CALCULATIONS RIP -RAP APRON SKIMMER BASIN ANTI -FLOTATION CALCULATIONS TEMPORARY DIVERSION DITCH OVERVIEW This report contains the storm water management and erosion control calculations for the proposed Dollar General Store site. The project site is located at the intersection of White Cross Road and NC HWY 54 in Chapel Hill, Orange County and is a residential property. The proposed project site consists of 4.83 acres and approximately 2.97 acres will be disturbed as part of this project for the construction of the site improvements. The development of the site will result in an impervious area of 36,178sf (0.83ac - 17.18% impervious). The proposed Dollar General site is not located within a FEMA designated flood zone as shown on FEMA FIRM Panel 3710974900K with an effective date of November 17, 2017. Flood zones are subject to change by FEMA. There are no existing stream or wetland features on the proposed property. The proposed site is within the Cape Fear River Basin and is within the Jordan Lake water supply watershed. There is a proposed storm water management facility (stormwater wetland pond) on site. The SCM outlined in this report has been designed for post —development peak attenuation and water quality. The SCM is designed to capture a drainage area of 1.09 ac with an impervious area of 0.82 ac. The site grading and storm drainage systems are designed to convey stormwater runoff from the impervious areas of the site to the stormwater wetland pond. The site is not located within a coastal county, therefore the design storm for water quality is a 1,0" storm event, Erosion Control Erosion control measures have been designed in accordance with NCDEQ erosion control standards and regulations to minimize sediment laden runoff from exiting the site. Silt fence will be installed along the low sides of the site prior to construction. The construction entrance will be installed prior to construction commencing. A skimmer basin will be used to treat stormwater runoff prior to leaving the site. Accumulated sediment within the project site will need to be removed and the pond constructed to final design conditions prior to final acceptance of the project. Soils The County Soils Survey indicates that Appling Sandy Loam soils are present on the site. Site Stabilization After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements and landscape plan for this site. FIGURES Hydrologic Soil Group —Orange County, North Carolina 35° 55 21' N 35° S5' lY N OM360 66M 66342D 653450 663460 3 Map Sole: 1:1,240 if printed on A portrait (8.5' x 11") sheet s N Meyer 15 30 60 9D Feet 0 50 100 20D 300 Map projection: Web Mamhor C Tw000rdinates: WGS84 Edge tics: UrM Zone 17N WGS84 LJSDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 6a351 D 663510 35° 55 21" N I 35° 5512' N 663540 3 4/7/2022 Page 1 of 4 0 2 7 a N C CD d ozi C;Do O N O fyD A 2 in A A Z O CD D 0 ■ C1 O ❑ ®0 ❑ ❑ A m d R oXi 7 W CA D to Z o o 0 co co D to Z o n O W ao :�- D D m v v G ° O v 0 r° O 0 C S Gr CD H v a o o D O_ > > N O 01 O p1 D m a< O <D CD d IFS, d d ' 0 a o „o©o© � d a m m ai _ c m 0 (n o n n o N m O Oz N d 0 0 C CD m N (o N Cl o N a a o 2 Cto CL al 7 N N 0)< N CD �3 0 o� �o U1 c o DQ� g N O N nc�tn O O 3 (D (N(77 0 3 m 7 N a) (p 3 0 CD 0 O^ _ O- N 2- CD N 0 6 c CD N 5` CD O CJ C (D O a1 a1 � (D N C a) O 3 0(D NO f0 ,z CD o Q o) O o� `< C D� < l0 N Q -1 fD N O �� o O O a, _O C m N A N(D o— dv a= �. O O O `0 O 0) Q C CD p N N O 0 2 a3i .0 O QO O N �D QN C N a) (D QOCD = N (e O O 9 N O N �• NC� N J (NOD `OG N N -{ 3 N N Q N O ((DD I N io N 7 0 D (D 6 .� N U fD 0 3 °sOD aw CD M° �;°' 0 CD0 r� 0v�6 O s 7 CD N O N CD N fD Q N 7 Q CD d 0= °. - fD (D Cl) CD N O' n N C-0 fD Q N Q'G 7 O� al O N N 3 (D N O (D 0 CL � p N C j O p �' N N (D O Q fD 0 0 0 �_. Q N CJ N3 N Ncp 0 N '-�•7 (D� l�D c 7 N O O S < .< 3 N Q' O O L 7 S 7» .n-. N D) (D N Q �' (D N p O• co (D 7 N N 3 � d N 7 06 (OA S (D S a1 Cl 0 0 � O 0 CD O (D 3 0 m 0 N �_ �. CD 0 < (p 0? d O D 0) C N Q O 0.(0 7 co a1 Fr 7 O w � Q C j» L N �, N C.) N N Z CT 2 3 (D N N 7 (ND Z 7 N D) 3 7 3 7 M N O (D m O c o 3 n cn m e f.J oD a (D m d d_ ° m CD Cr N Nn O N oD 3 a) 7 a1 CD C (p (D Cr CD Q O .C. J p �• N- Cal) j• 3 C (O N 0 3 7 O) N 3 C N' CJ al N 0 7 Q O N �j CD p 0 z "O (D p < d n << CD Q N (D d N fD (D N C N CD (D C O N d O N CD _ CD W O N U) (D O Q ic a T r m Q m z v D M z n D O z Hydrologic Soil Group —Orange County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ApB Appling sandy loam, 2 to B 5.7 1 97.0% 6 percent slopes Cp Congaree fine sandy C loam, 0 to 2 percent slopes, frequently flooded Totals for Area of Interest Description 0.21 3.0% 5.91 100.0% 1 Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or VD), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 4/7/2022 aiiiiiiiiiiiii Conservation Service National Cooperative Soil Survey Page 3 of 4 GREFryi<lEJ.� 8A —� I iD p!H WEK! A.f �4 r � LD, INDT"°S900 CV ewe mfw k ° n R �►fr� RCS ,� � f CIS W W> lL> m 7 3 W m = (p C N F L E C > Q Q m W x3 Y W � J° LLIX v o -o WN OO O46 N LL p y C O X � ¢ ^� O u V T W g C V W O o 9 u. Y cI m D N 0 ° r C c m O C N W Yi S lyiy G 8 U 3 O� � C C N� LL mQ O T N Y C p W Z o O K y LL y O li 0° 10 'oQca L c L m ¢mt� o m �cWi 3y 3 C m W m Q O 3"3 o ov m u.6 a� a V u. LL 2u. 1QK J p LL] ¢ S WO W1 d 0) 4) J Q W W co N m 17 _O LL N C E m a a O. m o u 16 N `w U O LL z o.o e O E m ° mow w C t 01 m m o4Wj cTc m �' c°-OM W m o E cc o m ofo¢ E dY m a W O J /W o[cmC m m V O w aN rO CsL C O O° mmm EO W W mC Em YEp E OW OmVvm j r yC, O 2 .0 WE Q o m°V W O / or m O E L LL 9CM ¢ N m E° EW iG O mcn 0 ° a O Y o« °o«m WWm W my> uN Ey ^�mm yQ oiv'm Q W m O E U V c U d= O Z OM O W C O WN? W O W yQp N LL NC W N N`wWWdt II2 I WC m L a ~ rEn nE N « v D m M _ a m O.co > E E i •W ao a y xom LL a E $dom IwA J(n SV) EE O,c m mzon W m '0C S a O-C ° C mc W Z E Oo W z 0 mL W O« N mv C W ¢ zF W U OH a _ m w N V E -'°E m a O= O. V W -�°Owu�E m m O. O E W �a�m �� LL I?C� a. v 2 E x 3-Ea02m mm a O N _ _ v y O L p Io N 0 0 O O 0 0 0 LO 0 LO N iO N�ax3 -- - ' t.asnik Wr' Gree!lBed Rd-- - Pa nsanaufd_,�p. .-3efla�_Rd • v `s is 4 v s� ENe lie r ° u i R' L14 1 . m u rl = u �� Pd - 3 $ t 10m--JD 91Iyoo- O a ' A. A1J 1 S f Bracken' n !{� a4yr L7 c o uy ~ W + G�N O LE /off ! w • aa E �" M c e 7 E +? a E w j O° a b 3 E u ;i c p$ E c r f 2 N NOAA Atlas 14, Volume 2, Version 3 ' Location name: Chapel Hill, North Carolina, USA' Latitude: 35.9206°, Longitude:-79.1886° ~f Elevation: ft source: ESRI *" SRI Maps source: t1SGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps &aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 J1 2� 10 25 50 100 200 500 1000 0.409 0.561 0.615 0.674 0.712 0.747 0.775 0.805 0.827 5-min (0.374-0.44$} (0.513-0.613 0.561-0.672} (0.612-0.735) (0.645-0.777 (0.673-0.815 ) ( 0.695-0.847) 0.715-0.880 ] 0.728-0.904 ) 10-min (0.598-0.715 mi(O.821-0.982)1(0-898-1.07) 0.975-1.17 1.03 1324 (1.07-11930) (1.10--21334) 1. 3-21739 (1. 5--31042) 7407 15-min (0.747--0 894) (0 99 (1.04-11424 1. 4 1.36 (1.24-31648 1.30�57 (1.3551064 (1.39--1.69 (1.42-61075 1.44--61379) 30-min 1. 2-1223 1. 3--31547) . 1. 8-61.76 1. 5-81097 (1. 3-2.20 1.96 2636 2.07 2051 2. 6 2.64 2.26 2579 2. 3-62 89 1.40 1.69 2.07 2.35 2.68 2.93 3.17 3.39 3.66 3.86 60-min (1.28-1.53 (1.55-1.85) (1.89-2.26) (2.14-2.56 (2.44-2.93) 2.65-3.20) (2.85-3.45 (3.03-3.70 (3.254.00) 11 (3.40-4.22 2-hr 1.67 1.52-1.83 2.02 1.85-2.22) 2.50 (2.28-2.74) 2.86 (2.60-3.13) 3.31 1 (2.99-3.62) 3.65 (3.29-3.99) 3.98 (3.56-4.36 4.31 (3.834.72) 4.73 1 (4.16-5.18) 5.06 1 (4.40-5.55) 3-hr 1.63 1.95 1.98 2.36 (2.44 2?93 2. 00736 (3.24 3891 3. 8 4834 3.91 4?77 4. 25620 (4.63?5.77 {4. 4 6923 6-hr 2.14 2.59 3.21 3.70 4.35 4.86 5.38 5.91 6.62 7.19 1.97-2.34 ) (2.38-2.83 ) (2.94-3.51 ) 3.38-4.04 ) (3.944.73 ) ( 4.38-5.29 ) ( 4.61-5.85 (5.22-6.42) (5.77-7.19) (6.19-7.83 12-hr . 23 2376) (2 81-3.34) (3. 0 4116) (4.04 4Z83 (4.765570) (5. 3 6?42) 5. 8--7-15 6. 5 7392) (7-2 9.01) 1 (7.79 9.90 2.95 3.56 4.44 5.13 6.07 6.80 7.55 8.32 9.38 10.2 24-hr 2.76-3.15) (3.34-3.81) 1 (4.16-4.74) 1 (4.80-5.48) 1 (5.65-6.48) 1 (6.32-7.27) (6.99-$.0$ 7.68-8.94 8.61-10.1 9.33-11.0 3.45 4.16 5.14 5.91 6.92 1 7.72 8.53 9.36 10.5 11.4 2-day 3,24-3.69 (3.904.45) 11 (4.82-5,51) [1 5.526.32 (6A5-7.41) 1 (7.17-8.27) 8.62-10.1 9.61-11.3 (10.4-12.3 3.65 4.39 5.41 6.21 7.27 8.11 8.97 9.84 11.0 12.0 3-day . 3.43-3.91) (4.124.69) (5 .07-5.79 5.80-6.64) (6.77-7.79) 7.53-8.70) (8.29-9;63) (9.06-10.6) (.10.1-11.9) (10.9-13.0). 3.86 4.62 5.68 6.57 7.62 8.50 9.40 10.3 11.6 12.6 4-day 3.624.12 (4,344.94 (5,32-6.07) 6.08-6.96) (7.10-8.17 7.89-9.12) (8.69.10.1) (9.51-11.1) (10.6-12.5) (11.5-13.7) _ 7-day 4.17i1�71 4.97- 62 8.:03 $a82) 6862�77 7.9 =99071 8.8310.1 9,71--1.2 10.6- 2.3 11 8 13-8 (12-7.5.0) , 10-day 20-day 5.02 (4,74-5,34) 77 8.97 (5.63-8.35] 7.16 6.75.7.82) 8.10 {7,62-$.62 9.36 ($.78-9.97}. 10.3 {9.S$-11.0] , 11.4 (10.6.12.1) 12.4 1 (.11.5-13.3:) 13.8 12.7-14.8 14.8 13.6-18.0) (6.3 11 7 50-8,38 S.84-9 89) [9.90 1.1 (11 3 12.8 12 4 4.1 73.5.-15.4] 14 75 6.8] 162-1 B.7 17-3-20.2) 8.34 9.82 11.4 12.6 14.3 15.5 16.7 18.0 19.7 20.9 30-day (7.92-8.82) (9.30-10.4) 10.8-12,0 11.9-13.3 (13.4-15.1) 14.6-16.4 15.7-17.8 (16.8-19.1) [18.3-20.9) (19,4-22.4) 11 8-13.1 13.5- 4.9 14.8- 6.4) (16i5-18.3 17.16- 9.8 1921021.3 203- 2,8 21?9- 4,8 232426,3. 60-day 12.8 14.9 16.6 18.2 20.1 21.5 22.9 24.2 26.0 27.3 (12.2-13.4) (14.2-15.6) (16.0-1T6 17.4-19.1) (19.2-21A) 20.5-22.6) (21.7-24.1) (210-25.5 (24.5-27.4) {25.7-28.9 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical ueuwmo� yi�cssb NM VNIIObVO H1HON'IIIH 13dVHO � V38N 30VNIVdO 03dOl3A30-1SOd J 1 p �g 6 i15� g+f a ' � U n _ � � e @e V hq l awv sw, d MU | n ueumos \� ' ma � � ;;,s -- ga 6AaesvGdewealo�,lElmd | §q�■` E u § 'f - t ! a ■an � -T� � � � � ■e ■ m � /�� �■: _#aa � � -� � � ,�■■ ®- � ■ ® $ ON g� WATER QUALITY/QUANTITY SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Dollar General 2 Project Area ac 4.83 3 Coastal Wetland Area ac - 4 Surface Water Area ac - 5 Is this ro'ect Hi h or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain ve etated? Yes 9 If BUA is ro osed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 1 15 Permeable Pavement 0 16 Sand Filter 0 17 lRainwater Harvesting (RWH) 0 18 lGreen Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 1 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Organization: Street address: Matt Lowder, PE 28 Bowman North Carolina, Ltd. 29 4006 Barrett Drive, Suite 104 30 City, State, Zip: Raleigh, NC 27609 31 Phone numbers : 919-553-6570 32 1 Email: mlowder@bowman.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. r q •• Sea! *"d,e i6ignaUke of Designe9r Il L Z� Date DRAINAGE AREAS 1 Is this a hi h densi ro'ecl? Yes 2 If so number of drainage areas/SCMs 1 3 Does this project have low ensity areas? No 4 If so -number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wetland 5 Total drainage area (sq ft 210577 sf 47553 6 Onsite drainage area (sq ft 210577 sf 47553 7 Offsite drains a area (sq ft 8 Total BUA in project s ft 36178 if 35697 sf 9 New BUA on subdivided lots (subject to j permitting)s ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offs ite BUA (sq fl 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft 23017 sf 22536 sf - Sidewalk (sq ft 2521 sf 2521 sf - Roof (sq ft 10640 if 10640 sf - Roadway s ft Future (sS ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting)_ Existing BUA that will remain (not subject to s ft 16 ExisVn . BUA that IsMready parmItted (sq ft 17 Existing BUA that will be removed (sq ft 1191 sf 1191 sf 18 Percent BUA 17.18% 75.07% 19 Design storm inches 1.0 in 20 Design volume of SCM cu ft 3554 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional Information about the drainage area(s): _22 There is 481 sf (impervious bypass) of the driveway that will not be treated by the SCM. STORMWATER WETLAND 31 Area, total surface area of the SW wetland at Temporary pool elev. Area 5,580.00 32 Area, temporary Inundation zone at temporary pool elev. (sq ft) 1.800.00 33 Area, shallow water zone at temporary ool elev. (sq ft) 2.020.00 34 Area. forebay at temporary I elev. (sq ft 625.00 35 Area. non-forebay deep pool at temporary I elev .(s il) 360.00 36 Percent area provided, temporary inundation zone (should be 30- 45% 32% 37 Peroenf area provided, shallow water zone should be 35-45 % 36% 38 Percent area provided. deep of foreba should be 10-15 % 11% 39 Percent area provided, deep pool (non-forebay) (should be 5-15%) 7% Wetland 1 10:22 AM 12/20/2022 STORMWATER WETLAND Warldpiftntr 501 Soil amendment depth (Inches) 12 In 51 Has a soil amendments cificalion beenprovided? yes 52 Hasa landscaping plan that meets SW Wetland MDC (12) been Yes rovide& 53 Number of plants per 200 square feet (#) in the shallow water zone: 54 Does the temporary inundation zone planting comply with SW Yes Wetland MUC.(14)7 55 Ara lha dam sWcture and temporary fill slopes planted in non- Yes Glum turf rass? 56 WII} rEttdlls be Uanted In the wetland? No ADDITIONAL INFORMAMN Please use Ih�s space la nroajde any additional information about 57 the stormwaler wetland(s): TN spreadahacI wouldnY let me enter values for#53, the plaid numbers. We added 507 plants (50 plants per Met). Llne 24 - The peak atlentuation for Orange County Is for the I year, 24hr storm evant Wetland 1 10:22 AM 12/20/2022 Proiect Information Project Name: Submission Date: Dollar General 12/20/2022 210,577 ft2 Project Area (ft): Disturbed Area (ft2): 129,583 ft 2 Commercial Development Land Use Type: Development Activity Type: Designated Downtown Area? Development - New no NC Hwy 54 Project Location/Address: County: Orange Local Jurisdiction: Orange County Project Latitude Coordinates: 35.923097 N Project Longitude Coordinates: -79.177172 W Precipitation Station: Chapel Hill Physiographic Region: Piedmont Nutrient Management Watershed: Jordan Lake Subwatershed: Jordan - Upper New Hope Phosphorus Delivery Zone: Jordan - 050060 Jordan - 050060 Nitrogen Delivery Zone: Project Designer and Contact Phone Number / Email: Matt Lowder, PE Bowman North Carolina, Ltd. 919- Part of Common Development Plan? no Project Owner Type: Private Project Description: Dollar General Retail Store Proiect Area Land Cover Characteristics PROJECT AREA LAND COVERS Roof Roadway TN EMC (mg/L) 1.18 1.64 TP EMC (mg/L) 0.11 0.34 Pre- Project Area (ft) Post - Project Area (ft) 10,640 Parking/Driveway/Sidewalk 1.42 0.18 1,191 25,538 Protected Forest 0.97 0.03 Other Pervious/Landscaping 2.48 1.07 209,386 166,449 CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM 1.18 0.11 7,950 LAND COVER AREA CHECK Net Change of Land Covers (ftZ): 42,937 Total Project Area Entered (ft): 210,577 Total Pre -Project Calculated Area (ft): 210,577 Total Post -Project Calculated Area (ft): 210,577 Equations Used and ProiectArea Calculations SIMPLE METHOD Stormwater Runoff Volume Generated, V Runoff Coefficient R v V = P1 * Rv * (P/12) * A R = 0.05 + (0.009 *1) where A = drainage area (ft) where I = percent impervious (%) Pj = fraction of rain events with runoff Average Annual Pollutant Load L P = average annual rainfall depth (in) L=(Pj*R *(P/12))*(C*A*2.72) where C = event mean concentration (mg/L) Pre -Project: Post -Project: A = 4.8342 ac A = 4.8342 ac P = 47.31 in. P = 47.31 in. V = 41162 ft 3 V = 179689 ft3 1 = 1% 1 = 21% R„ = 0.06 R = 0.24 Pi = 0.9 PI = 0.9 CTN = 2.38 mg/L CTN = 1.51 ME CTP = 0.98 mg/L CTP = 0.30 ml LTN = 6.11 Ib/yr LTN = 16.93 IbJ CTP = 2.53 Ib/yr CTP = 3.38 lb/ 3. SCM Characteristics SCM Characteristics Catchment ID SCM 1D Type of SCM Predominant hydrologic soil group at SCM location SCM Description Design Storm Size (inches/24hrs) Percent of full Size Hydrologic Value - Percent Annual Effluent Hydrologic Value - Percent Annual Overflow Hydrologic Value - Percent Annual ET/Infiltrated SCM Effluent TP EMC (mg/L) SCM Effluent TN EMC (mg/L) SCM Land Cover TP EMC (mg/L) SCM Land Cover TN EMC (mg/L) Drains to SCM ID 1 101 Stormwater Wetland per MDC C Stormwater Wetland per MDC 1.00 100% 1 102 1 103 59 % 16% 25% 0.18 1.12 0.11 1.18 0 3. SCM Characteristics Catchment Routing (Source Catchment) Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Catchments Draining t+ sCM 101 no SCM ID: 101 SCM Drainage Area Land Covers I Area Draining Directly to Roof Road Parking/Driveway/Sidewalk Protected Forest Other Pervious/Landscaping CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM TOTAL AREA DRAINING TO SCM (ft,): CATCHMENT AREA (ft): SCM 101(ft2) 10,640 I 25,057 3,906 7,950 47,553 47,553 Catchments Draining to SCM 102 102 Area Draining Directly to SCM 102 (ft2) 0 Catchments Draining to SCM 103 103 Area Draining Directly to SCM 103 (ft2) 0 3. SCM Characteristics SCM Characteristics Catchment ID SCM ID Type of SCM Predominant hydrologic soil group at SCM location SCM Description Design Storm Size (inches/24hrs) Percent of Full Size Hydrologic Value - Percent Annual Effluent Hydrologic Value - Percent Annual ❑verflow Hydrologic Value - Percent Annual ET/Infiltrated SCM Effluent TP EMC (mg/L) SCM Effluent TN EMC (mg/L) SCM Land Cover TP EMC (mg/L) SCM Land Cover Thl EMC (mg/L) Drains to SCM ID 3. SCM Characteristics Catchment Routing (Source Catchment) Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 SCM ID: SCM Drainage Area Land Covers Roof 4 ParkingMriveway/Sidewalk Protected Forest Other Pervious/Landscaping CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM TOTAL AREA DRAINING TO SCM (ft): CATCHMENT AREA (ft): Total Land Use Area Treated By All SCMs (ft) 10,640 0 0 %906 0 0 0 7',950 47,553 Allowable Total Land Use Area to be Treated Based on Post-ft iect Areas (ft') 10,640 0 25,538 0 166,449 0 0 0 7.950 210,577 Post -Project Untreated Land Area (ftZ) 0 0 481 0 162,543 0 0 0 0 163,024 o 0 0 0 0 0 a w Q d d n d= o n Sass'+..; F+r+ v°+ 0 0 0 0 c c c 3 S a S S oo fD iQ fD oQ fD trQ fD ° O ° O -• , a fD 0 0 0 0 3 C Z J in( n r °a r m 3 c o c c e\° o o r^ 3 S a o°) O. A c 0 in A =r Q N 0. rl O 3 3' (D D 0 v m "Jo� u a°o it , m f�D f�D aq ... rt 3 a + /. �/ <• a,- Q \ \ O C 13 v v V 4S U1 tv , N O Qo O Qo c N N W lD 00 o O/ F+ F+ W 00 e N N W Co W O V IN F a W lO V F� o V O W OD W O 4 o (J1 O W Ul F' V 0 Q1 00 N O �D N N O W O ti 0 0 Ul F" Q1 w Ql 00 c 0 N W Ln o 00 N O 00 ill ID o 0 H I • O V 00 I� V Ln lO F, N N F� t✓J lO O F" o 00 F V V Q1 W rn 0 0 0 ON N � lD VA rr+ (D� e"F G V n O 3 rN+ M M n O_ rt c 3 y rt O m 4, Q(D m M w z m r+ S V �< (D < 2. � 00:E "a a m d 3 c o° �oQ 3 v, y 0 fD fD N rt of O O 4A fl. O^ fD D a r r+ n S O (D r+ n) a c Q o. O �. ,0+ cd 0. c. 3 (�D Q' < O tQ S eD n) _rt � C D m. a rt ,0+ W CL r 0) � 0 Q rt K f�D A f(D M z n) n°j Q tIQ & N (A r ^ W 3 tll cj rD o cD • a m ;� .. 3 �? .• 0) A z CTrQQ1 M Irt a (D v M. rr* O h N rt V �D �T'1 0 n) y d A � f' N nl tD fD a cr tD e0i O l0 O Gi .-. fu ^ Q O O < Ul Ul MQ n CT cr d n -, ` 0 fD fi O 00 V •G v •G V�3 o O 3 V V v O rD N O al rt ' O O O O W w O v O a, N in lD oo F� ill W to C1 in 00 N o M v z z N JS z r z 0 h ' z z GO lO o0 v w N r rN-+ o on rt p rr+ 00 N O. Q. rt n1 fD = z to O aq C I� z= 0 3 (D v O N r* tD N r O '� y O_ O tt0 ^ ° O N c O 7 n nl nl n) C 3 a v Q?< w m = O d r O tQ O O v0+ C r3+ W r+ m Q < 3-:0 UQ vi OQ CL CL a (D N M O M o fD fD z a m r+ 1 < r+ r ram+ O (Aram+ A � Q O' 3 O fD fD Q m!01 Q rt 'U v ID = m cr r+ �. 7 O In "t3 M O N rt tT rD 0 f7 O' O N O o z O v F� N cn O N O Na v p rDrj 'G O '* fD F� � w O l0 o O N N O 00 A O fD O n• ell, N 3 tu 1 A ic Cl O m O Ol O In O Ul O V7 O A O A O A O W O W O W O O O O O O O W N F+ W N F+ W Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D Z D N o 3 n M N M M m A A A A A ( A 3 3 3 3 3 .�+ 01 .�+ V1 .�+ AID .3r W .�► N Q .fie F+ M 0 z fD O O O O O O O O O O O O O O O O O O O O O O Lnn Li Q O O O O 0 O O 0 O O O O O O O O O O 0 O O O O IN W r+ C O O O O O O O O O O O O O O O O O O O O O O o 0 7 c \ \ \ \ \ \ o \ \ \ \ \ \ \ \ o \ ID 0 z 0 O O O O O O O O O O O O O O O O O O O O O O m m r+ 3 r O O O O O O O O O O O O O O O O O O O O O O O O 0 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N � I" 14 3 00 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v Q z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 w ko�o w 0000000000000000000000�►-� o- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 uj u a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ar 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0�o w 0 0 o o o o c O v O O O O O O O O O O O O O O O O O O O O O O lLn Li CD O O O O O O O O O O O O O O O O O O O O O O Ln L, = 0 0 0 o 0 o 0 1.10, 0 e���10-01 0 0 0 0 0 o 0 �.Ol 0 �.Ol 0 �.Ol 0 eo",'OR 0 0 0 o�0' 0 0 0 o 0 o rAr O a c 7 0 o < r < m S II o (D S " II < S n r�D o " * S I O n < c a (D < S * * II II � r II d (D D � (D - o Ln c II * II O 9 II < N II * (D n y II d * D II + O rD II o K o c c i. * CD o c `» N 0 Q N O w a) 0 -0 (D lD O Fn C n_i O C aa) N ' rDr 3< A c c .v 0 7 E 0 m c m �'' 3 _ - < (i �. 3 d' In 7 — 7 + * , 7 (D O.3 :3� LS ,ter � � O D °' r+ vCi w Q N 7 N O 3 V ((DD -O ry d 0 6 a v ' j.� O 7 (D � � c � a (D D 7 7 C LALA � 0 LA 0- C ,�+ O 7 D O 3 C 1 O = 0 LA Q C rnr O D 7 3 C 1 Z o rrDD rn+ < D 7 3 C r Z o (DO 0 K D 7 7 C << c 3 (D D N c D 7 7 C c 3 (D D (/� D 7 3 C O G o �' ao ° a, C N r O C rt a o -0 s °°<° o fi O n (D :3 D 7 7 C O c o �' ao Z a00 rD 3 r Q O C rr ova Z rt 7 o Mn (D :3O� 4 —{ O N ° c r N (� _ g' v D 7 C of 3 n O :' rna of — -0 S C N r 5 n O 3 ago v- °mrD v+ fi O n (D :3r D> C � 3 n O 7 oq °' R Z aOG (D o d Q n O 3 via v — Z o m = o n (D rt rah, > ti, p o C 7 O ::p 0 (D (D :3 < -0 (D (�i h I < 00 °, O r* rt 7 D (D of D, rt (D nl/f v G 'd O ~' N 3 Ln 6 Ln o \ o O i;z Q � aq rt S fD CL Z v o LO •- n a Ln r+ O au O N N I� Co JP N LnkD w p N o v V LD A Fr N I--� O F+ V 00 O V N W 0l 4�- P. O F+ Ln U N N W to w O O 00 00 LD NJUl o v Ln w 3 A 07 7 Q V fD Nutrient Management Strategy Watershed - Nutrient Offset Credit Reporting Form Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offset credits. Contact and rule implementation information can be found online at: htt : de .nc. ov about divisions water -resources lannin non oint-source-mans ement nutrient -offset - information PROJECT INFORMATION Applicant Name: Glandon Forest Equity, LLC Project Name: Dollar General Project Address: NC Hwy 54 Date: (mm/dd/yyyy) 12/20/2022 Development Land Use Type: Commercial County: Orange Development Activity Type: Development - New Pre -Project Built -Upon Area %: 0.57% Project Latitude: 35.923097 Post -Project Built -Upon -Area %: 17.18% Project Longitude: -79.177172 WATERSHED INFORMATION Nutrient Management Watershed: Jordan Lake N Offsite Threshold Rate (lb/ac/yr): 10.00 Subwatershed: Jordan - Upper New Hope P Offske Threshold Rate (lb/ac/yr): 0.65 Nitrogen Delivery Zone: Jordan - 050060 Nitrogen Delivery Factor: 79% Phosphorus Delivery Zone: Jordan - 050060 Phosphorus Delivery Factor: 73% NUTRIENT OFFSET REQUEST Nitrogen Load Offset Needs (A) (B) (C) (D) (E) (F) (G) (H) (L) (Where Applicable) Untreated Treated Loading Rate Reduction Project Size Offset Delivery State Buy Local Gov't Loading Rate Loading Rate Target Need (ac) Duration (yrs} Factor (/°) Down Amount Buy Down (Ibs/ae/yr) (Ibs/ac/yr) (Ibs/ac/yr) (Ibs/ac/yr) (Ibs) Amount (Ibs) B -C D"E"F`G 3.50 2.62 2.20 0.42 4.8342 30 79% 48.37 Phosphorus Load Offset Needs (A) (B) (C} (D) (E) (F) (G) (H) (L) (Where Applicable) Untreated Treated Load Loading Rate Reduction Project Size Offset Delivery State Buy Local Gov't Load Rate Rate Target Need (ac) Duration (yrs) Factor (%) Down Amount Buy Down Ibs/ac/ ( r y) Ibs/ac/ ( r y) (Ibs/aG r y) Ibs/aG r ( y) Ibs Amount Ibs ( ) ( ) B-C D`E-F*G 0.70 0.65 0.82 -0.17 4.8342 30 73% 0.00 LOCAL GOVERNMENT AUTHORIZATION Local Government Name: I Orange County Staff Name: -I Phnna Staff Email:l 1 Date] Local Government Authorizing Signature: Bowman North Carolina, Ltd. Dollar General - Chapel Hill, NC Curve Number Calculation (CN) Pre -Developed Conditions (Overall Site) Drainaoe Area jacresl: 4.83 Exlsdnp .5011 Groin 50i1 Grout/ Map Symbol Soil Description Acres Percent of DA C ApB Appling Sandy Loam 4.83 100% Pr000sed_Land�Jses: Land Use Description Existing Solt Group Acres Curve # Wert CN Wooded - Good C 2.85 70 41.2 Impervious Area C 0.03 98 0.6 Open Space - Good C 1.96 78 31.6 Cumulative Curve # = 73.4 Bowman North Carolina, Ltd. Dollar General - Chapel Hill, NC Curve Number Calculation (CN) Post -Developed Conditions (Stormwater Wetland) Drainage Area (aeresl: 1.09 Existing Sail Group soil Group Map Symbol Soil Description Acres Percent of DA C ApB Appling Sandy Loam 1.09 100% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Wer�fed CN Open Space - Good C 0.27 78 19.4 Impervious Area C 0.82 98 73.6 Cumulative Curve # = 93.0 Bowman North Carolina, Ltd. Dollar General - Chapel Hill, NC Curve Number Calculation (CN) Post -Developed Bypass Conditions Drainage Area (acres.- 3.74 Existing Soil GrouQs. Soil Grout/ Map Symbol Soil Description Acres Percent of DA C ApB Appling Sandy Loam 3.74 100% Proposed Land Uses: Land Use Description Existing Soil_Group Acres Curve # Weighted CN Wooded - Good C 1.78 70 33.4 Impervious Area C 0.01 98 0.3 Open Space - Good C 1.95 78 40.6 Cumulative Curve # = 74.2 Project Information Proposed Stormwater Wetland Project Name: DG - Chapel Hill Project #: Designed by: CEP Date: 12/19/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Stormwater Wetland Drainage Area (DA) = 1.09 Acres 47553 sf Impervious Area (IA) = 0.82 Acres 35697 sf Percent Impervious (1) = 75.07 % Required WQv Storage Volume Design Storm = 1 inch (Non -Coastal county) Determine Rv Value = 0.05 + .009 (1) = 0.726 in/in Storage Volume Required = 2,875 cf (above Permanent Pool) Surface Area Requirements: Storage Volume Required = 2,875 cf (above Permanent Pool) Maximum ponding depth = 0.7 ft Surface Area Required= 4,108 sf Surface Area Provided= 5580 sf at temporary ool elev. Breakdown of Surface Area: Forebay 625.00 sf 11.2% of Wetland Surface Area (10% to 15%) Non-Forebay Deep Pools 380.00 sf 6.8% of Wetland Surface Area (5% to 15%) Shallow Water Zone 2020.00 sf 36.2% of Wetland Surface Area (35% to 45% Temporary Inundation Zone 1800.00 sf 32.3% of Wetland Surface Area (30% to 45% Total 4,825 sf 86.5% of Wetland Surface Area Incremental Drawdown Time STORMWATER WETLAND INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar DG - Chapel Hill Project #: esigned by: CEP Date: 12/19/2022 iecked by: Date: Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 Cp * D2 (Z-D/24-Ei)n11n1 Q2 = 0.372 CD * D*(Z-Ei)^(3/2) Q,=0 0.9 in 0.6 354 Orifice Inv 0.00 to 354 354 to 354.1 354.1 to 355 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time Sq ft cu ft ft cfs min 354.00 4.575 0 0.00 2.00 0.000 — 354.70 5580 3,554 0.70 3.00 0.010 5,935 Total 1 3,564 - 5,935 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 3,654 cf Total Time = 6,935 min Total Time = 4.12 days 12/20/2022 Prop Wet Land -new design-ChapelHill.xls 1 of 1 Proposed Stormwater Wetland Project Information Project Name: DG - Chapel Hil Project #: Designed by: CEP Revised by: Checked by: Site Information Date: Date: Date: 12/19/2022 Sub Area Location: Drainage to Proposed Stormwater Wetland Drainage Area (DA) _ _ 1.09 Acres Impervious Area (IA) _ _ 0.82 Acres Percent Impervious (1) = 75.07 % (Drainage Area) Orifice Sizing Orifice Size = in (Diameter) Drawdown Time = days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: cf (Water Displaced - Top of Pond to Bottom of Pond) Weight: 2496 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: Ibs Volume of Concrete Req'd: cf (Unit WT of Concrete = 150 pcf) Volume Provided: 77.5 cf (4'x4' riser x 2.5' = 40cf, 5'x5' footing x 1.5' = 37.5cf) 2' C7 Li W Z W Cl- Z Q - Z _ w" O N -- Q ;T- N." -- - --- -- z •� �zzV) --- - w Q p [ T? an Q F (n Cl ZLci Qw __ J O j CD O 1- o Y II � N S C):2—j w iscn F- F =M��0. - -- - ' OO LLJ LLJ O C � QN Q p U 2 �� Q—J �Q U W Q 1 ! F clo� uA —w� :�w wu") -Qw z W Q C) Q z O � z w Z g STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 354.0 4575 0 0 0.7 354.7 5580 3554 3554 (WQV) 1.0 355.0 5980 1734 5288 2.0 356.0 7290 1 6635 1 11923 2.5 356.5 7940 1 3808 1 15731 STORMWATER MANAGEMENT DESIGN STORMWATER WETLAND: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES: POND DESIGN SUMMARY CAPE FEAR COLLINS CREEK 16-30-(0.5) WS-V; NSW 0303000205 35.923097'N,-79.177172'W DRAINAGE AREA TO POND: 1.09 ACRES SITE IMPERVIOUS AREA TO POND: 0.82 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 0.82 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND BYPASS COMBINED DRAINAGE AREA: 4.83 AC 1.09 AC 3.74 AC CURVE NUMBER: 73.4 93.0 74.2 TIME OF CONCENTRATION: 15.8 MIN 5 MIN 10 MIN 1.0" STORM EVENT: 0.413 CFS 0.011 CFS 1-YEAR STORM EVENT: 4.844 CFS 3.856 CFS 0.178 CFS 4.596 CFS 4.774 CFS 2-YEAR STORM EVENT: 7.335 CFS 4.810 CFS 0.342 CFS 6.859 CFS 7.201 CFS 10-YEAR STORM EVENT: 14.68 CFS 7.241 CFS 0.934 CFS 13.40 CFS 14.33 CFS 25-YEAR STORM EVENT: 19.42 CFS 8.683 CFS 1.385 CFS 17.62 CFS 19.01 CFS 100-YEAR STORM EVENT: 27.14 CFS 10.94 CFS 5.266 CFS 24.48 CFS 29.75 CFS w Em2 \� —�--- ®(kk �} §■�) 4&&[§ b7� @ 2} �! §� y7' qq� �T aE U U W Y/1 Z > Z Z d .c,- , O W BQ U Z_ Z Q a cc U U a Pond Report s Hydraf low Hydrographs Extension for Autodesk(D Civil 3DO by Autodesk, Inc. v2022 Tuesday, 12 / 20 / 2022 Pond No. 1 - Stormwater Wetland Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 354.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 354.00 4,575 0 0 0.70 35470 5,580 3,554 3,554 1.00 355.00 5,980 1,734 5.288 2.00 356.00 7,290 6,635 11,923 2.50 35650 7,940 3,808 15,731 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 0.90 Inactive Inactive Crest Len (ft) = 0.33 15.67 Inactive Inactive Span (in) = 15.00 0.90 0.00 0.00 Crest El. (ft) = 354.70 355.90 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 354.00 354.00 0.00 0.00 Weir Type = Rect Broad --- --- Length (ft) = 15.00 1.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 3.33 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfl.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 3.00 2.00 1.00 0.00 '- 0.00 1.00 Total 0 Note: CulverUOrifice oulflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) 2.00 3.00 Stage / Discharge 4.00 5.00 6.00 700 8.00 Elev (ft) 357.00 356.00 355.00 1 354.00 9.00 Discharge (cfs) 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc. v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 4.844 2 724 14,471 -- ------ Pre -Developed -Overall Site 2 SCS Runoff 3.856 2 716 8,184 ------ Post Developed to Pond 3 Reservoir 0.178 2 782 7,488 2 354.98 5,149 Post Through Pond 4 SCS Runoff 4.596 2 722 12,416 - -- - - Post Developed Bypass 6 SCS Runoff 0.413 2 144 1,671 - - - ------ SCM Post -Developed 7 Reservoir 0.011 2 366 1,579 6 354.30 1,548 1.0-in Storm Thru Pond Wetland_ChapelHill.gpw Return Period: 1 Year Tuesday, 12 / 20 / 2022 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.95 in Storm duration = 24 hrs Q (cfs) 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 1 Year Tuesday, 12 / 20 / 2022 = 4.844 cfs = 724 min = 14,471 cult = 73.4 = 0 ft = 15.80 min = Type II = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 1 1 1 1 1 I I I I 1 I% . 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.95 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 - Hyd No. 2 Tuesday, 12 / 20 / 2022 Peak discharge = 3.856 cfs Time to peak = 716 min Hyd. volume = 8,184 cuft Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 1 Year 240 360 480 600 720 840 960 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Stormwater Wetland Pond Max. Storage Storage Indication method used. Q (cfs) 4.00 3.00 2.00 1.00 Post Through Pond Hyd. No. 3 -- 1 Year Tuesday, 12 / 20 / 2022 = 0.178 cfs = 782 min = 7,488 cuft = 354.98 ft = 5,149 cult 600 1200 1800 2400 3000 3600 4200 4800 5400 Total storage used = 5,149 cult Hyd No. 3 — Hyd No. 2 Q (cfs 4.00 3.00 W OM 1.00 0.00 6000 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 3.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.95 in Storm duration = 24 hrs Q (cfs 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed Bypass Hyd. No. 4 -- 1 Year 0.00 - - 0 Tuesday, 12 / 20 / 2022 = 4.596 cfs = 722 min 12,416 cuft 74.2 = 0 ft = 10.00 min = Type II = 484 120 240 Hyd No. 4 Q (cfs) 5.00 4.00 3.00 2.00 1.00 Wawa A" 360 480 600 720 840 960 1080 1200 1320 1440 1560v Vv Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 SCM Post -Developed Hydrograph type - SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.090 ac Basin Slope = 0.0 % Tc method - User Total precip. = 1.00 in Storm duration = 6.00 hrs Tuesday, 12 / 20 / 2022 Peak discharge = 0.413 cfs Time to peak = 144 min Hyd. volume = 1,671 cuft Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6-Hr Shape factor = 484 SCM Post -Developed Q (cfs) Hyd. No. 6 -- 1 Year 0.50 i 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 60 120 180 240 300 360 420 Hyd No. 6 Time (min) Hydrograph Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - SCM Post -Developed Max. Elevation Reservoir name = Stormwater Wetland Pond Max. Storage Storage Indication method used. 1.0-in Storm Thru Pond Tuesday, 12 / 20 / 2022 = 0.011 cfs = 366 min = 1,579 cuft = 354.30 ft = 1,548 cuft Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 0.50 - 0.50 i I 0.45 0.45 0.40 - 0.40 0.35 - 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - J 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 7 Hyd No. 6 Total storage used = 1,548 cult Hydrograph Summary Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) ------ Hydrograph Description 1 SCS Runoff 7.335 2 724 21,274 - — - Pre -Developed -Overall Site 2 SCS Runoff 4.810 2 716 10,360 - ------ ------ Post Developed to Pond 3 Reservoir 0.342 2 750 9,649 2 355.14 6,219 Post Through Pond 4 SCS Runoff 6.859 2 722 18,116 --- ------ Post Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 ---- ------ ---- SCM Post -Developed 7 Reservoir 0.000 2 n/a 0 6 354.00 0.000 1.0-in Storm Thru Pond Wetland_ChapelHill.gpw Return Period: 2 Year Tuesday, 12 / 20 / 2022 Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 4.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 8.00 . 10 4.00 2.00 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 2 Year 360 480 600 720 840 960 Tuesday, 12 / 20 / 2022 = 7.335 cfs = 724 min = 21,274 tuft = 73.4 = 0 ft = 15.80 min = Type II = 484 Q (cfs) 8.00 M 4.00 2.00 — 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 1.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Tuesday, 12 / 20 / 2022 Peak discharge = 4.810 cfs Time to peak T 716 min Hyd. volume = 10,360 cuft Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution Type II Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 5.00 I 5.00 4.00 - 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 -- Hyd No. 2 Time (min) IHydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Stormwater Wetland Pond Max. Storage Storage Indication method used. Q (cfs) 5.00 4.00 3.00 2.00 1.00 Post Through Pond Hyd. No. 3 -- 2 Year 600 1200 1800 2400 Hyd No. 3 Hyd No. 2 Tuesday, 12 / 20 / 2022 = 0.342 cfs = 750 min = 9,649 cuft = 355.14 ft = 6,219 cult 3000 3600 4200 4800 ___ Total storage used = 6,219 cuft Q (cfs 5.00 4.00 1 3.00 2.00 1.00 �J- 0.00 5400 6000 Time (min) Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc v2022 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 3.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 7.00 . M 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed Bypass Hyd. No. 4 -- 2 Year Tuesday, 12 / 20 / 2022 = 6.859 cfs = 722 min = 18,116 cuft = 74.2 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 7.00 . 1M 5.00 4.00 3.00 2.00 1.00 0.00 ' r r - 1 I I I 1 1 n ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Summary Report 17 Hydraf low Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) (Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 14.68 2 722 41,316 ------ -- ------ Pre -Developed -Overall Site 2 SCS Runoff 7.241 2 716 16,045 - -- - Post Developed to Pond 3 Reservoir 0.934 2 728 15,311 2 355.58 9,154 Post Through Pond 4 SCS Runoff 13.40 2 720 34,800 - -- -- Post Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 - ------ - SCM Post -Developed 7 Reservoir 0.000 2 n/a 0 6 354.00 0.000 1.0-in Storm Thru Pond Wetland_ChapelHill.gpw Return Period: 10 Year Tuesday, 12 / 20 / 2022 Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.13 in Storm duration = 24 hrs 12.00 • R . �� 3.00 M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year 120 240 360 480 600 720 840 Hyd No. 1 Tuesday, 12 / 20 / 2022 = 14.68 cfs = 722 min = 41,316 cuft = 73.4 = 0 ft = 15.80 min = Type II = 484 Q (cfs) 15.00 12.00 M .W 3.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.13 in Storm duration = 24 hrs M 4.00 2.00 0.00 0 120 Hyd No. 2 Tuesday, 12 / 20 12022 Peak discharge = 7.241 cfs Time to peak = 716 min Hyd. volume = 16,045 cuft Curve number - 93 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor - 484 Post Developed to Pond Hyd. No. 2 -- 10 Year 240 360 480 600 720 840 960 Q (cfs) 8.00 . M 4.00 2.00 0.00 1080 1200 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Stormwater Wetland Pond Max. Storage Storage Indication method used. Q (cfs) 8.00 M 4.00 2.00 Post Through Pond Hyd. No. 3 -- 10 Year 480 960 1440 1920 2400 2880 Hyd No. 3 Hyd No. 2 Tuesday, 12 / 20 / 2022 = 0.934 cfs = 728 min = 15,311 cuft = 355.58 ft = 9,154 cuft Q (cfs) 8.00 4.00 2.00 0.00 3360 3840 4320 4800 5280 Time (min) Total storage used = 9,154 cult Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 3.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.13 in Storm duration = 24 hrs Q (cfs 14.00 12.00 10.00 :M$ Me M 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed Bypass Hyd. No. 4 -- 10 Year 0.00 0 Tuesday, 12 / 20 / 2022 = 13.40 cfs = 720 min = 34,800 cult = 74.2 0 ft 10.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 4.00 2.00 �1t 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Summary Report 24 Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) 19.42 Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) - - Hydrograph Description 1 2 722 54,455 ------ Pre -Developed -Overall Site 2 SCS Runoff 8.683 2 716 19,481 - -- --- ---- Post Developed to Pond 3 Reservoir 1.385 2 726 18,736 2 355.85 10,947 Post Through Pond 4 SCS Runoff 17.62 2 720 45,688 ------ -- - Post Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 ------- ------ ------ SCM Post -Developed 7 Reservoir 0.000 2 n/a 0 6 354.00 0.000 1.0-in Storm Thru Pond Wetland_ChapelHill.gpw Return Period: 25 Year Tuesday, 12 / 20 / 2022 Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 4.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.07 in Storm duration = 24 hrs 18.00 15.00 12.00 M 3.00 M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 25 Year Tuesday, 12 / 20 / 2022 = 19.42 cfs = 722 min = 54,455 cuft = 73.4 = 0 ft = 15.80 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 • ee NOR 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 1.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.07 in Storm duration = 24 hrs Tuesday, 12 / 20 / 2022 Peak discharge = 8.683 cfs Time to peak = 716 min Hyd. volume = 19,481 cuft Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 2 Time (min) Hydrograph Report 27 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Stormwater Wetland Pond Max. Storage Storage Indication method used. Tuesday, 12 / 20 / 2022 = 1.385 cfs = 726 min = 18,736 cuft = 355.85 ft = 10,947 cult Post Through Pond Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) Hyd No. 3 Hyd No. 2 - _ 'I Total storage used = 10,947 cult Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 3.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.07 in Storm duration = 24 hrs 15.00 12.00 •M . �� 3.00 Tuesday, 12 / 20 / 2022 17.62 cfs = 720 min = 45,688 cuft = 74.2 = 0 ft = 10.00 min Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed Bypass Hyd. No. 4 -- 25 Year Q (cfs) 18.00 15.00 12.00 3.00 0.00 -1 . J.. I- I I I— I I I I '- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Summary Report 31 Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow 1 Maximum hyd(s) elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 27.14 2 722 76,209 -- — Pre -Developed -Overall Site 2 SCS Runoff 10-94 2 716 24,913 ------ ------ Post Developed to Pond 3 Reservoir 5.266 2 722 24,157 2 356.10 12,706 Post Through Pond 4 SCS Runoff 24.48 2 720 63,670 - Post Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 -- ---- -- SCM Post -Developed 7 Reservoir 0.000 2 n/a 0 6 354.00 0.000 1.0-in Storm Thru Pond Wetland_ChapelHill.gpw Return Period: 100 Year Tuesday, 12 / 20 / 2022 Hydrograph Report 32 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 4.830 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.55 in Storm duration = 24 hrs Q (cfs 28.00 24.00 20.00 16.00 12.00 :M 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 100 Year 0.00 - 0 Tuesday, 12 / 20 / 2022 = 27.14 cfs = 722 min = 76,209 cuft = 73.4 = 0 ft = 15.80 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 1 e. 4.00 RiTil 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2022 Tuesday, 12 / 20 / 2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 10.94 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 24,913 cuft Drainage area = 1.090 ac Curve number = 93 Basin Slope = 0.0 % Hydraulic length = .0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 10.00 M .W M OR 2.00 we Post Developed to Pond Hyd. No. 2 -- 100 Year 120 240 360 480 600 Hyd No. 2 Q (cfs) 12.00 10.00 .m 4.0.0 2.00 0.00 720 840 960 1080 1200 Time (min) Hydrograph Report 34 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 12 / 20 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 5.266 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 24,157 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 356.10 ft Reservoir name = Stormwater Wetland Pond Max. Storage = 12,706 cuft Storage Indication method used Q (cfs 12.00 10.00 M AM 4.00 2.00 Post Through Pond Hyd. No. 3 -- 100 Year Q (cfs) 12.00 10.00 EMS -MU 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 - Hyd No. 2 _ _ Total storage used = 12,706 cuft Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 4 Post Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 3.740 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.55 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 R MOM Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed Bypass Hyd. No. 4 -- 100 Year Tuesday, 12 / 20 / 2022 = 24.48 cfs = 720 min = 63,670 cuft = 74.2 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 | . I{ ; k$ ( +: �! ! 2 #i f |! | ) nj k�(/{|! J! ! £I � |} ; �# \ & 2 ! (& k £| ■a �!� �! @ !. ! ! ƒi& � 22 k (i & di� M ( |; + � � ;!« | i� O O hF N O N N � N N 0 O T T U) O N O .� MT LLL U co U a N m C_ w O N E 7 Z M O T O U ch 0 T O U E N N Z _N lL t N O IL �■ X :1 e R m e f F � j § � 2 � A q A § � . 3 � . � » R m 2 I La Ek§ b � k k_ _� g q q q U) { I k z f f f 2 _ jS 8 8 8 8 _ ¥ ¥ It �£ § t 8 8 8 8 E ] § § § § 2 S G S ; F R w 5 G © / o G § 0 w § k� ) \ o { 2 « ] E g 4 £ £ C, & ) ■ E _ � k o m - _z m m IL IL It 0 JCL E E c L 3 A E L -W / A c O N c 0 y c a `o 2 m o m 0 H F= c c N 7 U O U OO cN NO N 0 N y m c c= O 0 J Z W N co N N 0 C NE OR a' ccq O N O _ LO n � U') 0 O c N 2$ N C (0 C v c ! c J cq ON1. N OO O co fD fO c0 N O N W U' O ^ W) u') � L Z 2 � � m O N OO M CD to 1l Lq C O ^ J fA O O O O M O O a7 U) LO LO co > C J _ Lu LO UA m O 00 o o c cl U') LO LD LO > _ J C w LO u'1 Y7 In t 00 00co O O N O Cl) J m J N N a 7 - N C J (A ',7— T t 3 m y � � (OO, y C lL N C J } O o n e o J � a E E 2 � r LU� w z m C O N M J Z i v N ca c9 W C cC C O m Lq Lq rn o J O ; U Y 0 — 0 � N T N C. N Ol N m c0 (U (U `c O j O a c c c N Y N m U m L 00 00 O O O U ^ a U) 0 V) 0 0 0 0 O O O h Q e O O O Lq w N e O O O O 00 I : M � .- O J > m^ . LO LO LO LU W m LO eq N LO � LqO C cc M M M a+ O j m O 00 O w N w Q N O O O O 7 i kk k w k Z G rlO (NO (n Cii m 0 0 0 0 O N 00 J V m ^LO o0 O) N 00 V (O (0 = m an LO LO LO IA (n lfJ V O M O O _ m (Ln LO LD u O O O O O O O O C m ^+ o0 M �2 L2 J O O O MO c O O O N N o O O O O N_ W _ W J > W m V, LO ui (o ((i Ln (( to `nn `nn O 0) Q 10 M N 7LO O 0 II > O C. O d W M O � O 17 (n M N N y C m U 11 Q (0 (O N U OQ N O CD O a CR � c(04 9 (n E c 0 0 0 0 c0 (0 N cD cq 0) N L W M m 10 L (O c LO Lo Ln U O O O O c i O OM I�v c m LO LO LO LO � J Ln L Lqv (0D0 a a) v a M N '- o U LO to L y t to - r N M y O N o Z m C J H 0 L 2L n E 0 0 0 0 0 0 0 c i LO LO � ai ui N h LO 0 0 to 1#O0 v b :u M O M N co O M n N O ill " so 1#O0 g:u LO N N L U o o N ti 0 0 0 '° N 1#80 J LO n Z:u *'° W WOO 4 :u J mill Lf) N .1110 C 111 OOl#S�� III 0 Ilegn o 0 0 0 0 0 M m Ul U IV w 1 A HEN m Triangle Site Design, PLLC Dollar General Chapel Hill, NC - Storm Drain "C" calculations Rational Runoff Coefficient "C" Catch Basin#101 DmOareArea (acres}: 0.16 p+ovosed Land uses. - Land Use Desaipdon Acres % Site Runoff "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.16 100% 0.95 0.95 Lawn 0.00 0% 0.3 0.00 Wooded 0.00 0% 0.2 0.00 Total Area= 0.16 Cumulative "C° = OAS 1 iio= 7.38 Q1o= 1.14 Catch Basin#102 Drainaoe Area Iacresl: 0.11 Pipposed Land Uses: Land Use Description Acres ° Site Runoff "C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.11 100% 0.95 0.95 Lawn 0.00 0% 0.3 0.00 Wooded 0.00 0% 0.2 0,00 Total Area= 0.11 Cumulative "C" = 0,95 1 ilo= 7.38 Q1o= 0.75 SD. Cleanout#103 d1hVme Area La 0.12 Pressed Land Uses.• Land Use Description Acres % Site Runoff "C" "C" Roofs 0.12 100% 0.95 0.95 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 0.00 0% 0.3 0.00 Wooded 0.00 0% 0.2 0.00 Total Area= 0.12 Cumulative "C" = 0.95 1 110= 7.38 Q1o= 0.84 SD Cleanout#104 Drainaae Area (acres}: 0.12 Land Use Description Roofs Asphalt/Concrete Pavement Lawn Wooded Total Area= Acres ° Sife 0.12 100% 0.00 0% 0.00 0% 0.00 0% 0.12 cumulatly6'C`= i1o= Q10= Runoff "C" "C" 0.95 0.95 0.95 0.00 0.3 0.00 0.2 0.00 0.95 7.38 0.84 VNf1ONVO H1NON 'IIIH l3dVHO N4, UeLUAROS S131NI01V3HV3O1SOd EJVNIVHO03dO13A3�" e a y At arau silo � n _ ` d9 aRQ�§�eeE EROSION CONTROL CALCULATIONS EROSION CONTROL CALCS (RIP -RAP CALCULATIONS) Project Information Rip -Rao Aaron#1 Project Name: Chapel Hill (DG) Project #: 004-229 Designed by: 13N1 Date: 1212012022 Revised by: Date: Checked by: Date: Pipe Diameter d= 15 Pipe Slope s= 3.33 % Manning's number n= 0.013 Flow Q= 0.934 cfs Velocity V = 5.73 ft/s Dissipator Dimensions Zone = 2 Stone Filling Class = B Entry Width ( 3 X Do ) = 3.8 ft Length (6 X Do) = 7.5 ft Width (La + Do) = 8.8 ft Min. Thickness = 22 inches Min. Stone Diamete— 6 inches All units are in feet " Dissipator pad designed for full flow of pipe i 31 RIP-RAP.xls 12/20/2022 Page 1 of 5 Rio -Ran Aoron#2 Pipe Diameter d= Flume in Pipe Slope s= 20 % Manning's number n= 0.013 Flow Q= 2 cfs Velocity V = 2.00 ft/s Dissipator Dimensions ` Zone = 2 Stone Filling Class = B Entry Width ( 3 X Do ) = 5.0 ft Length ( 6 X Do ) = 6.0 ft Width (La + Do) = 7.0 ft Min. Thickness = 22 inches Min. Stone Diamete— 6 inches All units are in feet — Dissipator pad designed for full flow of pipe RIP-RAP.xls 12/20/2022 Page 2 of 5 Rip -Rap Apron#3 Pipe Diameter d= Flume in Pipe Slope s= 20 % Manning's number n= 0.013 Flow IV Q= 4 2 cfs 1 4 Velocity V = 2.00 ft/s Dissipator Dimensions * Zone = 2 Stone Filling Class = B Entry Width ( 3 X AO ) = 5.0 ft Length (6XAO) = 6.0ft Width (La + AO) = 7.0 ft Min. Thickness = 22 inches Min. Stone Diameter-- 6 inches 6.0 50 7.0 * All units are in feet - Dissipator pad designed for full flow of pipe 4 RIP-RAP.xIs 12/20/2022 Page 3 of 5 Rio -Rao Aoron#4 Pipe Diameter d= 15 in Pipe Slope s= 1 % Manning's number n= 0.013 Flow 4 Q= 4 3.57 cfs Velocity V = 5.39 ft/s Dissipator Dimensions Zone = 4 2 Stone Filling Class = B Entry Width ( 3 X AO ) = 3.8 ft Length (6 X AO) = 7.5 ft Width (La + AO) = 8.8 ft Min. Thickness = 22 inches Min. Stone Diamete— 6 inches ■ 7.5 ► All units are in feet " Dissipator pad designed for full flow of pipe RIP-RAP.xIs 12/20/2022 Page 4 of 5 Rio -Rao Aoron#5 Pipe Diameter d= 15 in Pipe Slope s= 0.6 % Manning's number n= 0.013 Flow 14 Q= 4 2 cfs Velocity V = 2.00 fds Dissipator Dimensions * Zone = 4 2 Stone Filling Class = B Entry Width ( 3 X AO ) = 3.8 ft Length (6 X AO) = 7.5 It Width (La + AO) = 8.8 ft Min. Thickness = 22 inches Min. Stone Diameter— 6 inches All units are in feet — Dissipator pad designed for full flow of pipe RIP-RAP.xls 12/20/2022 Page 5 of 5 EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: DG-Chappl bill Project M 004-229 Designed by: 8M Dale: 5123f2022 Revised by: Date: Checked by: Date: Skimmer Basin 111,11 Drainage Area Total, AT= 2.8 Ac Disturbed, An= 2.8 Ac 10-year Runoff (Q10) C = 0.50 T. = 5.00 min I,o = 7.38 in/hr 070 = 10.3 cfs Surface Area Required SA = 325sf x Q,e SA = 3,358 sf Volume Required VR = 1800 cf/Ac x Ao Va = 5,040 cf Sediment Trap Dimensions L = 120 ft (Spillway Length) W = 32 ft (Spillway Width) D = 2.0 ft (Depth of Storage) Side Slopes = 2 1 L.. _ Lr. = 128 it Lam,= 112 11 Wi., W10 W,.= 40 f1 Lz:= Ws,= 24 ft UW Ratio= 3.8 :1 (must be 2:1 to 6:1) Elevations Descni)Uon Elevation Top of Berm 555.00 (allow 1ft freeboard above spillway flow height) Emergency Spillway 553.50 Sediment Storage 553.00 Cleanout Mark 552.00 (half of storage height) Bottom 551.00 Provided SAP= 3,840 sf > 3,358 Vp = 6,528.0 cf > 5,040 Emergency Spillway -10 Year Storm I,p = 7.38 in/hr also 10.33 cfs h = 0.5 ft C„ = 3 Lw= 10 ft Calculate Skimmer Size Basin Volume in Cubic Feet 6,528 CuFt Skimmer Size 2.0 Inch Days to Drain' 3 Days Orifice Radius 0.8 Inch[es] Orifice Diameter 1.6 Inch[es] In NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet 120 32 Feet VOLUME 6528 Cu. Ft. Bottom dimensions in feet 112 24 Feet Depth in feet 2 Feet EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Project #: Designed by: Date: _ Revised by: Date: _ Checked by: Date: Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Top of Basin Elev.: 553.0 Bottom of Basin Elev.: 551.0 Volume: 32.0 cf Weight: 1997 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 2,396 Ibs Volume of Concrete Req'd: 16.0 cf Volume Provided: 69.5 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (4'x4' riser x 2.0' = 32cf, 5'x5' footing x 1.5'=37.5cf) 5/23/22, 1:53 PM NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > Temporary Dit h 1 Name Temporary Ditch #1 Discharge 10.3 Channel Slope 0.0037 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam (GM) DS75 ECMDS 7.0 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Depth Mannings N Shear Stress Shear Stress Factor Remarks Pattern DS75 Straight 10.3 cfs 1.94 ft/s 1.4 ft 0.038 1.6 Ibs/ft2 0,32 Ibs/ft2 4.95 STABLE D Unvegetated Underlying Straight 10.3 cfs 1.94 ft/s 1.4 ft 0.038 1.51 Ibs/ft2 0.17 Ibs/ft2 8.96 STABLE D Substrate https://ecmds.com/project/139235/channel-analysis/208780/show 1/1 5/23/22. 1:58 PM NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > Temporary Dit h 2 Name Temporary Ditch #2 Discharge 10.3 Channel Slope 0.033 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam (GM) DS150 ECMDS 7.0 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Staple Depth Shear Stress Shear Stress Factor Pattern uS15u Straight 10.3 cfs 4.62 ft/s Unvegetated Underlying Straight 10.3 cfs 4.62 ft/s Substrate 0.83 ft 0.035 1.8 Ibs/ft2 0.83 ft 0.035 1.7 Ibs/ft2 1.72lbs/ft2 1.05 STABLE D 0.97lbs/ft2 1.76 STABLE D https://eemds.com/projecVl39235/channel-analysis/208780/show 1 /1 5/23/22, 2:00 PM NORTH AMERICAN GREEN' CHANNEL ANALYSIS > > > Temporary Dit h Name Temporary Ditch #3 Discharge 10.3 Channel Slope 0.005 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam (GM) DS75 ECMDS 7.0 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Remarks Staple Phase Reach Discharge Velocity Depth Mannings N Shear Stress I Shear Stress Factor Pattern DS75 Straight 10.3 cfs 2.22 ft/s 1.29 ft 0.037 1.6 Ibs/ft2 0.4 Ibs/ft2 3.96 STABLE D Unvegetated Underlying Straight 10.3 cfs 2.22 ft/s 1.29 ft 0.037 1.51 Ibs/ft2 0.21 Ibs/ft2 7.1 STABLE D Substrate https://ecmds.Gom/project/139235/channel-analysis/208780/show 1 /1