Loading...
HomeMy WebLinkAboutSW5220801_Application Form_20221220IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from the developed areas of the site will be captured and treated in a stormwater wetland. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 4.83 acres Total Coastal Wetlands Area: 0 acres Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:4.83 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHIO line. The resultant project area is used to calculate overall percent built upon area (B UA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 17.18 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Collins Creek Stream Class * WS-V; NSW Stream Index Number 16-30-(0.5) Total Drainage Area (sf) 47,553 On -site Drainage Area (sf) 47,553 Off -site Drainage Area (sf) Proposed Impervious Area** (sf) 35,697 Impervious Area** (total) 75.07 Impervious- Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (sf) 10,640 On -site Streets (sf) On -site Parking (sf) 22,536 On -site Sidewalks (sf) 2,521 Other on -site (sf) Future (sf) Off -site (sf) Existing BUA*** (sf) 1,191 Total (sf): 35,697 * Stream Class and Index Number can be determined at: http.i&ortal.ncdenr.or web/wg&s/csu/classi{ications Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 06Aug2012 Page 3 of 6