HomeMy WebLinkAboutNCG590033_Supplemental DMR Information Form_20221117Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 11/17/2022 2:07:25 PM (Supplemental Submittal)
Submit by Bennett, Tilman B 12/20/2022 2:07:31 PM (Supplemental Info Submittal)
• Bennett, Tilman B assigned the task to Bennett, Tilman B 12/20/2022 2:07 PM
• The task was assigned to Thedford, Wren, Bennett, Tilman B 11/17/2022 2:07 PM
Initial Review Information
Updated ID#: * IMPORTANT: REVIEWER SHOULD VERIFY and revise here if necessary.
NCG590033
How should this project be handled?*
File Discard
Information Submitted on 11/17/2022
Submitter Information
Name: Nolan R Hallman
Who is submitting the information?
Email Address:* nhallman@lincolntonnc.org
Submittal Information
The Division of Water Resources (DWR) is providing this site to allow for the upload of required supplemental information
associated with discharge monitoring reports (DMR). All DMR data is required to be submitted electronically through
the eDMR system and should not be submitted here. Division staff will review all uploaded documents and will only
maintain required information. Documents such as laboratory reports are not required to be submitted and will not be
maintained in the system.
Project Information:
Please supply the permit number for this project.
......................................................................................................................................................................................................................................................................................................................................................................................................
Existing ID#* Permit Number
NCG590033
Examples: NCxxxxxxx or NCGxxxxxx
Facility Name: * City of Lincolnton Water Treatment Plant
County: Lincoln
Please upload all files that need to be submited.*
Click the upload button or drag and drop files here to attach document
October 2022 Duration of flow.pdf 197.52KB
Only pdf files are accepted.
Please provide descriptive comments about the attached information.*
PDF of daily pump runtimes
* By checking the box and signing box below, I certify that:
o I have given true, accurate, and complete information on this form;
a I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the
NC General Statutes (the "Uniform Electronic Transactions Act)
a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Supplemental Information form."
Full Name: Nolan R Hallman
Signature:
Date Submitted: 11/17/2022
Duration of Flow October 2022
1
3.3
2
8.9
3
2.9
4
9.2
5
5.5
6
6.8
7
5.2
8
6.5
9
5.8
10
5.1
11
6.9
12
5.9
13
7
14
5.3
15
7.3
16
5.2
17
7.3
18
5.3
19
7.5
20
5.7
21
4.9
22
7
23
5.8
24
7.6
25
5.4
26
7.1
27
5.3
28
6.8
29
5.2
30
7.1
31
6
PUMP #1&2
Monthly 190.8
Total