Loading...
HomeMy WebLinkAbout20221779 Ver 1_Riparian Buffer Authorization Request_20221215Buffer Authorization Application Form 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form - Update 10/23/2018 Water Reources ENVIRONMENTAL QUALITY Original Submittal 12/15/2022 A. Owner/Applicant Information General Information Primary Contact Email:* Who is submitting the application?* laura@drgrp.com Please list the contact person's email for questions or payment on this project if needed. Owner Applicant other than Owner Agent Is there an agent working on this application but Yes not submitting it? • No 1. Property Owner Information: .................................................................................................................................... la. Name on Recorded Deed: * 1b. Responsible Party: lc. Mailing Address:* Id. Telephone:* 4153787331 Mt. Holly Owner, L.L.0 (for Corporations) Street Address 2964 Peachtree NW Address Line 2 Suite 275 City Atlanta Postal / Zip Code 30305 2. Applicant's Information (if different from owner): 2a. Name: 2b. Company Affiliation: 2c. Mailing Address: State / Province / Region GA Country United States of America 1e. Email Address:* gcarpenter@penler.com Laura Dadisman Design Resource Group, PA Street Address 2459 Wilkinson Boulevard Address Line 2 Suite 200 City State / Province / Region Charlotte NC Postal / Zip Code Country 28208 United States of America 2d. Telephone: 7043430608 2e. Email Address: laura@drgrp.com B. Project Information and Prior Project History 1. Project Information la. Name of Project: * Penler-Mt. Holly (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No Id. Subdivision Name: le. Nearest Municipality: If. Property Size: acres 1g. County (or Counties) where the project is located:* Gaston 1h. Property ID# 226178,226181,226182 Tax PIN or Parcel id 1 i. Deed Information Date of Purchase Type of Book Book# Page# Deed 4909 0692 J Map 3595765217 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document PDF only 1k. How would you like to provide the Latitude and Longitude information?* Address Lookup • Manually Latitude* 35.2617 Longitude* -81.0193 11. Is the project located in any of North Carolina's twenty coastal counties?* Yes • No 2. Surface Waters 2a. Name of the nearest body of water to proposed project: * Catawba River 2b. Water Quality Classification of nearest receiving water: WS-IV CA 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,280 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 3b. Attach an 8 1/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document PDF only 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: * Within the site/property limits, construction of 814 linear feet of a 5 foot wide concrete path that leads to kayak launch in the Catawba River. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document 60 Kayak Study 102822.pdf 61 Penler - Mt Holly - Kayak Study_12.01.22.pdf PDF only 5. Jurisdictional Determinations 1.66MB 1.08MB 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date Attach Corps Krysta Stygar (Name if known) 09/20/2021 I 1 pdf only *** Please include the date of the determination and upload a copy of the determination. Comments: 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * Yes No 6b. List any permits/approvals that have been requested or obtained for this project in the past. 6c. Please explain and detail according to "help file" instructions. 7. Future Project Plans 7a. Is this project a phased project?* C. Proposed Impacts Inventory Buffer Impacts O Yes O No Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) • Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 026.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 Waters A Map label (e.g. Road Crossing 1) Non- wetland waters Permanent (P) Perm or Temp J Allowable 1,168. 00 Square Feet 0.00 Square Feet Total Zone 1 Impacts: 1,168.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 1,168.00 Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. minimal grading to achieve the least impactful direction and path to the kayak launch on the river. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. minimal grading to achieve the least impactful direction and path to the kayak launch on the river. E. Diffuse Flow Plan la. What type of SCM are you providing?* Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) • Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen lc. Diffuse Flow Documentation F. Supplementary Information Environmental Documentation Click the upload button or drag and drop files here to attach document C4.50 OVERALL DRAINAGE PLAN.pdf 1.04MB C4.57 SCM DETAIL.pdf 1.51MB PDF only la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact buffer authorization application? Yes No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Additional Comments: H. Sign and Submit By digitally signing below, I certify that: Click the upload button or drag and drop files here to attach document PDF only . A . A o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name: * Laura Dadisman Signature 46l!/tez OlddG•Yeeaor Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* • Yes No Yes • No ID#* 20221779 Version:* 1 Select Reviewer: * Andrew Pitner:eads\ahpitner Select Reviewing Office* Mooresville Regional Office - (704) 663-1699 Is this project a public transportation project?* Has payment been received?* • No Payment Needed Fee Received Need Fee - send electronic notification _ s — —_ f o, f m �_ - 15ea" o <D ^ n / A 8 a _ m a I�a 96 e & _ .. - - n � � " •- 8 g � R 8 ___ N - �m. 2 -.. R / " mK� �IIj m i c o ' a � t ` r e a m S r 1, Rg os T � n O m n R F - � - l a m 8 m i F-I n� R m n � n F w, _ w ml J �e _ g e- r � " m m R o� / n " " I a m ----------------------- � A i\ ___ ■■_■■ _ -- =-"=�`-<_==—yam, - �, � �■ ,■ - -_� � moo- ��� -- ---- - --_ - - __ �- -_1 ------------- Po3 �3i — 1SE 8 — e ao�s t El El oo'� °�❑ - �oo o ❑o oo� :o r v m A w m n r r N � r m _ 0 I 1 � m ■ _ _ I \ �—_ ���� k1r ------ II I J � 1 � > I ly\y — @e88sl -� V/ `� d o a P .w^ o im m � r I V ■m o A ■ \ o o ci i oo�b. I O o o � r All \ ■ M1 ■ 1 \ S ■ 1, 1 � g ■ I s � w\ W c _ �o ��.� Dose ecs eoc V F soeoe d� diNmid J /W^ a ��� sLZ 31S'MN 02J 332J1H�d3d b88Zb J v � Q m w ew.m, � z -j oa NoN a O VNIIOHVO HiHON'AllOH 1Nnovv d U N I.L $Lo m®e uii oWc C3 as A��OH '1W s, imp Z U oass'scs'oo[ J O v �' ��5.^' ��0��� F 5LZ 315 MN 0>J 33b1H�tl3d b96Zb F � O pOWN��/J�: ,¢ w 2i3�N3d LU €i W N �wR/ % 11fe' er p VNII0btlOHi?JON'AIIOH1Nnovi OWC LVL AI]OH '1W `--------------- -� �r ------------ -- I- ml