Loading...
HomeMy WebLinkAbout20220954 Ver 2_ePCN Application_20221217DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 9/19/2022 BIMS # Assigned* Version#* 20220954 2 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification What amout is owed?* $240.00 $570.00 Reviewing Office* Select Project Reviewer* Washington Regional Office - (252) 946-6481 Robert Tankard:eads\rbtankard Information for Initial Review la. Name of project: Massey Road Tract la. Who is the Primary Contact?* Wyatt Brown lb. Primary Contact Email:* lc. Primary Contact Phone:* brownenvgrp@gmail.com (919)524-5956 Date Submitted 12/17/2022 Nearest Body of Water Yellow Marsh Branch Basin Neuse Water Classification WS-IV;NSW Site Coordinates Latitude: Longitude: 35.2770 78.0664 A. Processing Information County (or Counties) where the project is located: Wayne Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 29 - Residential Developments NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: PC PROPERTY LLC 2b. Deed book and page no.: 3732, 56 2c. Contact Person: Joey Creech 2d. Address Street Address PO BOX 222 Address Line 2 City Micro Postal /Zip Code 27555 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country US Yes No Yes No 2e. Telephone Number: (919)631-6956 2f. Fax Number: 2g. Email Address: * joey.creech@gmail.com 4. Agent/Consultant (if applicable) 4a. Name: Wyatt Brown 4b. Business Name: Brown's Environmental Group, Inc 4c. Address Street Address 242 Batten Farm Road Address Line 2 City Selma Postal / Zip Code 27576 4d. Telephone Number: (919)524-5956 4f. Email Address: * b row n e n vg rp @ g m a i I. co m C. Project Information and Prior Project History State / Province / Region NC Country US 4e. Fax Number: 1. Project Information 1b. Subdivision name: (if appropriate) lc. Nearest municipality / town: Dudley 2. Project Identification 2a. Property Identification Number: 2575875166 2c. Project Address Street Address Not assigned, on Massey Road Address Line 2 City 2b. Property size: -98.0 State / Province / Region Postal / Zip Code Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Yellow Marsh Branch 3b. Water Resources Classification of nearest receiving water: * WS-IV;NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202011404 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The existing conditions are approximately 70% of the area is in a 7-8 year old cutover with lanes cut for access. The other 30% are wooded areas around the riparian areas. The general land use in the vicinity is row crop farming. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: —37.36 4g. List the total estimated linear feet of all existing streams on the property: —4974.15 4h. Explain the purpose of the proposed project: * The purpose is to provide single family housing with paved streets. The utilities will be furnished by the developer except for the septic will be on site for each lot. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project is expected to yield 83 home sites. The developer will provide paved streets, utilities except for the on site septic will be provided by the developer. There will be 2 wetland, stream impacts. Impact area 1 will be a general street road crossing impacting stream, wetlands and buffers. Impact area 2 will be a wetland impact for a private drive that will serve 3 lots. The initial clearing will be just enough to install sediment control measures. The area will be rough graded by a bull dozier and fine graded by a motor grader. A bull dozier will be used to clear the wooded area for the streets. The crossing culverts will be installed by track hoe. The streets will be asphalt paved and utility lines will be placed in the street right of way. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No Unknown 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2022-02432 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans Wyatt Brown Brown's Environmental Group, Inc 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Not to my knowledge D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 2. Wetland Impacts Streams -tributaries Pond Construction Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type*(') 2c. Type of W.* 2d. W. name 2e. Forested* 2f. Type of Jurisdicition* (?) 2g. Impact area* Impact 1 culvert P Small -Basin Wetland Wetland A Yes Both 0.149 (acres) Impact 1 culvert T Small -Basin Wetland Wetland A Yes Both 0.059 (acres) Impact 2 culvert P Small -Basin Wetland Wetland A Yes Both 0.068 (acres) Impact 2 culvert T Small -Basin Wetland Wetland A Yes Both 0.065 (acres) 2g. Total Temporary Wetland Impact 0.124 2g. Total Wetland Impact 0.341 2i. Comments: 2g. Total Permanent Wetland Impact 0.217 E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The design avoided impacts as much as possible. The 2 crossings we propose are necessary to access proposed lots across the wetland. On crossing Impact 1 we are crossing the wetland as perpendicular as possible and are using headwalls to minimize the impact. The street on crossing Impact 2 has been change to a 30 ft wide drive to lessen the impacts. The road shoulders and side slopes have minimized by width and side slope to minimize the impacts. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The contractor will be instructed to follow the approved sediment and erosion control plan which will help protect the riparian areas from sedimentation. The crossing will not be installed during unusually wet weather or when heave rainfall is predicted. The wetland areas will be shown on the construction plans and clearly marked in the field to avoid and minimize impact to the wetlands from construction activities. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Falling Creek Umbrella Mitigation Bank, Wildlands 3b. Credits Purchased/Requested (attach receipt and letter) Type: Riparian wetland 3c. Comments Quantity: 0.44 acres The actual permanent riparian wetland impact is 0.217 acres, therefore we are reserving 0.434 acres of riparian wetland at 2:1. 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. Yes No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. This project covers the entire tract of land. There are no future planned development on any adjoining tracts. I cannot imagine this project generating additional development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 1) NC Natural Heritage- Letter attached 2) IPaC- 1) Tricolored Bat- Is Proposed Endangered, I saw to evidence of any bats on the property. I also saw no old barrels, culverts etc where bats might roost. 2) Red -cockaded Woodpecker - "makes its home in mature pine forest" Most of the area is an cutover, the only wooded areas are around the riparian areas, most of these trees are hardwoods and privet. No affect. 3) Neuse River Waterdog-"Usually found in streams wider than 15 meters with clean flowing water." Both crossing impacts will not be impacting streams only wetlands. If the crossings were impacting a stream it would be a small 1st order stream and still no affect. 3) Carolina Madtom - "Prefers clean water with permanent flow" No stream is impacted by the crossing, no affect. 4) Monarch Butterfly- "Are fount in meadows, roadsides and sandy areas where milkweed plants grow" As stated this is mostly a cutover area, no milkweeds were found. No affect. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* N/A 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No Sc. What source(s) did you use to make the floodplain determination?* There is a Flood AE Zone along the northern property line along Yellow Marsh Branch, no construction will be in the AE Zone. Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document File must be PDF or KMZ Comments Buffers go to Washington Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Signature Date 12/17/2022 Sign