Loading...
HomeMy WebLinkAboutUpdated documents for circulationForm DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 250' Av. Width 80' Avg. Existing NA NA Depth -2 65' Final Project NA NA Depth -4.0 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Sand and Silt 1,151 cubic yards C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), N/A or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL YNone (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Approx. 83' x 113' or 9,286 ftz C. (i) Do you claim title to disposal area? d. (i) Wi I a disposal area be available for future maintenance? LV Yes ❑No ❑NA es ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), ❑Yes VNo ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB ❑WL VNone (ii) Describe the purpose of disposal in these areas: role A-r-k! iM!P-? Fyu-,nvatinn1 �9. d cy!!, Pnv-e 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: 5.7' e. Type of stabilization material: Vinyl Sheets g. Number of square feet of fill to be placed below water level Bulkhead backfill 1,004 ftz Riprap Breakwater/Sill Other i. Source of fill material. b. Length: 212 Width: 1.5' d. Maximum distance waterward of NHW or NWL: -17' f. (i) Has there been shoreline erosion during preceding 12 months? f 6es ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. Unknown h. Type of fill material. Sand or clay mix Permitted offsite borrow and suitable material from maintenance excavation 4. OTHER FILL ACTIVITIES This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Spoil material will be sloped, graded and provided groung cover once material has dewate I be hauled to an upland area offsite. C. (i) Will naviga tonal aids be required as a result of the project? ❑Yes WNo ❑NA (ii) If yes, explain what type and how they will be implemented. Equipment barge equiped with spoil containment structure, excavator, duml d. (i) Will wetlands be crosse in transporting equipment to project site? ❑Yes ❑No MNA (d) If yes, explain steps that will be taken to avoid or minimize environmental impacts. July 10, 2022, Modified December 3, 2022 Steve Trowell A ent for Ann O'Conner Date Applica a Atlantic Seafood Redevelopment Project Name Applicant Signature revised: 2 2&U6 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government Private/Community El This section not applicable b. (i) Will the facility be open to the general public? ❑Yes VNo c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? 2fYes ❑No (ii) Number 2 If yes: (iii) Length 84', 104„ 150' (��) a Number 7 (iv) Width 10', 6, 6" (iii) Length 15" (v) Floating ❑Yes VNo (iv) Width 3' (v) Floating ❑Yes VNo e. (i) Are Platforms included? ❑Yes VNo f. (i) Are Boatlifts included? &eYes ❑No If yes: If yes: (ii) Number (ii) Number 10 - 10,000 Ibs lifts (iii) Length (iii) Length 1 T, 10' (iv) Width (iv) Width 1 T, 8' (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 10 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 0 ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 10 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ❑Open water; no dredging required Other; please describe: Maintenance dredging of an existing land and open water cut k. Typical boat length: 17' to 25' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open runabout I. (i) Will the facility be open to the general public? ❑Yes ®No Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS VThis section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes S/No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes MNo o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL VNone p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes VNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) &This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) M�This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) C(This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS VThis section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community C. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form +DCM MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 15' to the West and 68' to the East Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 2 miles e. (i) Will navigational aids be required as a result of the project? ❑Yes tj No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. There are no other active docking facilities in Harbor. d. Water depth at waterward end of structure at NLW or NWL -4.0' N LW 18. OTHER This section not applicable a. Give complete description: July 10, 2022, Modified December 3, 2022 Date Atlantic Seafood Redevelopment Project Name Steve Trowell Agent for Ann O'Conner Applican Applicant Signature cv -v 8 tatia :: 1-888-4-RC AS s .. wwvv.nccoastaimas:auerrieiit.net revised: 12r27i06 70 O 0 (1) U CO Z U V m i -I L- a) E O LL O cn O � U cn a) O N tf -0 M cU m L- a) 'oil ri � o N o E m � 2 >, 0 T �m >�a�i 0 of 0 co O 70 0 oU Mz (1) c U U C � M Q Q a) E C 0 0 LL U M a) N a) tf 0)M -0 U a) L- r) !f 0 • LU • • o ro • ••Lu O Rt N N O N m E U 0- 0 0 N -0 0 = CCO G (n cn N N p O m ,O 0 ca O 00 E (/) U U 0 l0 }, ° ca Q U z 0 cn • 4L •r• •r• Qa �yl- M1 Y•. i ' l �I M LU 1 1 1� 1 1 1 1 1 r-i W N Q 0 N c C6 r-I N % ( 4- 0 m