HomeMy WebLinkAboutSWA000015_180 Day Expiration Reminder_20221219.pdfP,OY COOPER
Governor
ELIZABETH S. B1SER
Secretary
DOUGLAS R. ANSEL
Interim Director
December 19, 2022
NORTH CAROLINA
Environmental Quality
Ardmore Waxhaw, LLC
Attn: Brantley E. White, Manager
1400 W. Northwood St.
Greensboro, NC 27408
Subject: Expiration Date Reminder — Less Than 180 Days
Fast Track Authorization to Construct Permit No. SWA000015
Ardmore at Price
Union County
Dear Mr. White:
The Post -Construction Stormwater Fast Tract Authorization to Construct (ATC) Permit SWA000015 for
the subject project expires in less than 180 days on December 21, 2022. Since a renewal application
has not been submitted a minimum of 180 days prior to this expiration date, please proceed with one of
the following options:
Apply for and receive a permit through the standard permitting process by submitting for review
a new application package that includes but is not limited to:
a. a new Permit Application Form (SWU-101)
b. a $505.00 fee
c. a completed Supplement-EZ form
d. a recorded or completed O&M-EZ form
e. as -built plans and calculations for any completed SCMs
f. the full or partial designer certifications for any SCMs or project areas that have been
completed (per Permit Condition 3.e)
g. a completed rescission form to be acted upon once the new permit is approved.
The various required forms can be found on the Post -Construction section of the website:
deq.nc.gov/SW.
2. If construction has not started and there are no longer plans to construct the project such that a
permit is no longer needed, please submit a permit rescission request form, which can be found
on the Post -Construction section of this website.
North Carolina General Statutes and the Coastal Stormwater rules require sites that have started
construction to remain covered under an active post construction stormwater permit. Failure to maintain a
permit subjects the owner to enforcement action as set forth in NCGS 143 Article 21, including the
assessment of civil penalties of up to $25,000 per day. Any enforcement actions taken by the Division
will consider the status of construction as well as any applications submitted for review.
If you have any questions regarding this matter, please contact Jim Farkas in the Central Office at
jim.farkas@ncdenr.gov or 919-707-3646.
Sincerely,
0"""t agwd Pry Pow 7
'07-
Douglas R. Ansel, Interim Director
Division of Energy, Mineral and Land Resources
DES/j£ \\\WaterResources\DEMLR - Stormwater\SW Permits\SWA000015
cc: Barret Hagen, PE; Hagen Engineering, PA
Mooresville Regional Office Stormwater File
D E Q�� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORT CAROLI+
D ^dm,tai � Iw6m'el ou.Z 919.707.9200