1
Proiect Name
Utility Improvements to Serve Shabain Reserve - Phase 1
2
Project Area ac
115.32
3
Coastal Wetland Area ac
-
4
Surface Water Area ac
-
5
Is this project High or Low Densit ?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
No
10
Is streambank stabilization proposed on thisproject?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
1
12
Bioretention Cell
0
13
Wet Pond
3
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
1 Rainwater Harvesting. RWH
0
18
lGreen Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
0
23
_
StormFilter
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Carlo Pardo, PE
28
Organization:
Bowman North Carolina, Ltd.
29
Street address:
City, State, Zip:
4006 Barrett Drive, Suite 104
Raleigh, NC 27609
30
31
Phone number(s):
919-553-6570
32
Email:
! cpardo@bowman.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
�����tultllrrr��
�►k C A R0�''�•f,
SEAL
051571
c..........
A
Signature of Designer
Date
DRAINAGE AREAS
1
Is this a hi h density project?
Yes
2
If so, number of drainage areas/SCMs
4
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
AREA INFORMATION
Entire Site
1
2
3
4
4
T e of SCM
-
Wet Pond
Infiltration Basin
Wet Pond
Wet Pond
5
Total draina a area s ft
5023339 sf
883772
394402
176822
874858
6
Onsite draina a areas ft
883772
394402
176822
874858
7
Offsite draina a area s ft
8
Total BUA in project (sq ft
980497 sf
371638 sf
171155 sf
86745 sf
350959 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
680000 sf
272000 sf
112000 sf
64000 sf
232000 sf
10permitting)
New BUA not on subdivided lots (subject to
s
300497 sf
99638 sf
59155 sf
22745 sf
118959 sf
11
10ffsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
Sidewalk (sq ft
75573 sf
27645 sf
15376 sf
5672 sf
26880 sf
Roof (sq ft
Roadway s ft
215004 sf
71993 sf
43779 sf
17073 sf
82159 sf
Future (sq ft
Other, please specify in the comment box
below (sq ft
9920 sf
9920 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
1 Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
19.52%
42.1%
43%
49%
40%
19
Design storm inches
1.0 in
1.0 in
1.0 in
1.0 in
20
Design volume of SCM cu ft
32182 cf
62235 cf
7580 cf
31488 cf
21 Calculation method for design volume Simple Method Simple Method Simple Method Simple Method
ONAL INFORMATION
ease use this space to provide any additional information about the
"22drainagearea(s):
12-Postal Kiosk for additional BUA
WET POND
1 11 Drainage area number 1 3 4
21 Minimum required treatment volume (cu ft) 32182 cf 7580 cf 31488 cf
NERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
Pump (preferred)
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
N/A
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
Yes
161
Does the SCM follow the device specific MDC?
Yes
Yes
Yes
17
Was the SCM designed b an NC licensedprofessional?
Yes
Yes
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
SA/DA
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
206.00
189.00
202.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
207.00
190.00
203.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
211.50
195.50
206.50
23
Elevation of the permanent pool (fmsl)
212.00
196.00
207.00
24
Elevation of the top of the vegetated shelf (fmsl)
212.50
196.50
207.50
25
Elevation of the temporary pool (fmsl)
213.90
197.50
208.70
26
Surface area of the main permanent pool (square feet)
11390
2950
13155
27
Volume of the main permanent pool (cubic feet)
43138 cf
8526 cf
42764 cf
28
Average depth of the main pool (feet)
4.22 ft
3.66 ft
3.58 ft
29
Average depth equation used
Equation 3
Equation 3
Equation 3
301
If using equation 3, main pool perimeter (feet)
423.0 ft
237.0 ft
442.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
3.0 ft
3.0 ft
32
Volume of the forebay (cubic feet)
6715 cf
1583 cf
7964 cf
33
Is this 15-20% of the volume in the main pool?
Yes
Yes
Yes
34
Clean -out depth for forebay (inches)
48 in
48 in
48 in
35
Design volume of SCM (cu ft)
32182 cf
7580 cf
31488 cf
36
Is the outlet an orifice or a weir?
Orifice
Orifice
Orifice
371
If orifice, orifice diameter (inches)
2.00 in
1.00 in
2.50 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
3.59
3.61
2.41
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
Yes
Yes
431
Depth of forebay at entrance (inches)
60 in
60 in
60 in
44
Depth of forebay at exit (inches)
54 in
54 in
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
Yes
46
Width of the vegetated shelf (feet)
6 ft
6 ft
6 ft
47
Slope of vegetated shelf (H:V)
6:1
6:1
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.
No
No
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
Yes
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
Yes
53
Species of turf that will be used on the dam and embankment
Hybrid Bermuda
Hybrid Bermuda
Hybrid Bermuda
54
Hasa planting plan been provided for the vegetated shelf?
Yes
Yes
Yes
ADDITIONAL INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 1 10:18 AM 12/19/2022
INFILTRATION SYSTEM
1 Drainage area number
2 1 Minimum required treatment volume (cu ft)
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V or enter "Vertical' for
trenches)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
lWhat is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
18 1 Proposed slope of the subgrade surface (%) 0%
19 jAre terraces or baffles provided? No
20 1Tvpe of pretreatment: Forebay
Data
21
Was the soil investigated in the footprint and at the elevation of the
infiltrations stem?
Yes
22
SHWT elevation (fmsl)
189.00
23
Depth to SHWT per soils report (in)
120 in
24
Ground elevation at boring in soils report (fmsl)
199.00
25
Is a detailed hydrogeologic study attached if the separation is
between 1 and 2 feet?
N/A
26
ISoil infiltration rate (in/hr)
4.00
27
1 Factor of safety (FS) (2 is recommended):
2.00
Elevations
29
113ottom elevation (fmsl)
199 ft
30
IStorage elevation (fmsl)
204.5 ft
31
1 Bypass elevation (fmsl)
204.5 ft
Basins
32 113ottom surface area(ft) 7230 ft
33 Istorage elevation surface area(ft) 15675. ft
For Trenches Only
34
Length (ft)
35
Width (ft)
36
Perforated pipe diameter, if applicable (inches)
37
Number of laterals
38
Total length of perforated piping
39
Stone type, if applicable
40
Stone porosity (%)
41
Is stone free of fines?
42
Is the stone wrapped in geotextile fabric?
43
Has at least one inspection port been provided?
Volumes/Drawdown
44 IDesign volume of SCM (cu ft) 62235 cf
45 ITime to draw down (hours) 23.8 hrs
46 Please use this space to provide any additional information about
the infiltration system(s):
Line 26 - The soils report found the infiltration rate of the soil to be 8.0"/hr. A more
conservative value of 4.0"/hr was used in the calculations, to account for clogging of
the soils that will happen over time.
Infiltration 1 1:15 PM 12/19/2022