Loading...
HomeMy WebLinkAboutNCC214471_NOT Closeout Documents_20221219Sedimentation/Construction Storinwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cleveland Project: Oak Crossing S/D River basin: Broad Person financially responsible: Stitzel Construction - Auston Stitzel, Manager Project #: CLEVE-2021-020 Address: 916 Old Boiling Springs Road, Shelby, NC 28152 1. Project Location: Hamilton Road, Boiling Springs Pictures: No 2. Weather and soil conditions: Cloudy, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No contact made Title: Inspection report: Sent Report Date given/sent: December 14, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:tledocs.deq.nc.gov/Forms/NCGO I -Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. All projects that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Joseph Hoy Date of inspection: December 13, 2022 cc: Yes Others present: Time arriving on site: 10:55 AM Time leaving site: 11:20 AM