Loading...
HomeMy WebLinkAboutNCC205524_NOT Closeout Documents_20221219North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Rockingham Project: Dollar General Eden River basin: Roanoke Person financially responsible: Teramore Construction - Joe Strickland Project #: ROCKI-2021-020 Address: 214 Klumac Road, Suite 101, Salisbury, NC 27016 1. Project Location: NC 14, Leaksville Township Pictures: Yes - Digital 2. Weather and soil conditions: 50s, sunny, workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 18, 2022 10. Comments: A site inspection was conducted on November 9, 2022 to facilitate a site closure. All construction has been completed and temporary erosion and sedimentation control devices have been removed. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions, please contact the Winston Salem Regional Office or nate.gainerAancdenr.gov or 336-776-9660. Reported by: Nate Gainer Others present: Date of inspection: November 09, 2022 Time arriving on site: 11:45 AM Time leaving site: 12:00 PM