Loading...
HomeMy WebLinkAbout20030179 Ver 6_General Correspondence_20070817O~O~ W A T ~RQG ~ ~ r ~ ~ o ~ August 17, 2007 MEMO TO: Steve Tedder FROM: John Dorn RE: Public Hearing for Dillsboro dam removal Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Attached is a copy of the CD of the application for the Dillsboro dam removal which is the subject of the public hearing on September 25 at Western Carolina. Periann Russell and I will be in Highlands on Spet 24 and 25 working on stream mapping with the Town of Highlands so we can readily meet you at the site if you want to see the dam before the hearing. Please advise as to your interest in doing a site visit. After looking at the CD, if you need any additional information, please advise. The public notice states that the hearing will start at 6 pm but the building is only available starting at 6 pm. Therefore, Periann and I will be there a starting at 5:30 pm begging WCU staff to let us in early to set up the hearing. If that is not possible, there may be some delay and confusion in starting the hearing and I apologize in advance for that confusion. I will copy you on all relevant correspondence to the public from before the hearing and of course, with all comments received after the hearing. I can be reached at 919-733-9646 if you have any questions. Thankx. None Carolina ~tura!!y Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612 An Equal OpportunitylAffirmative Action Empbyer- 50% Recycled/10% Post Consumer Paper