HomeMy WebLinkAboutSW3221203_Supplement-EZ Form_20221216SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT
INFORMATION
1
Project Name
McCanless Village
2
Project Area ac
21.49
3
Coastal Wetland Area ac
0
4
Surface Water Area ac
0
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of v etated setbacks provided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
113ayfilter
26
lFilterra
FORMS LOADED
27 1 Name and Title:
31 JPhone numbers :
32 Email:
y Design Group, PLLC
,16 Foxbridge Dr
dington, NC 28104
910-840-2661
Certification Statement:
I certify, under penalty of law that this Supplement-E2 form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief. true, accurate, and complete, and that the engineering plans.
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
oFES3/&
SEAL
048418
•/�` �'VGINEE� Z'
Sign f Designer
IZ-13- ZZ
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE
AREA INFORMATION
Type of SCM
Entire Site
1
4
Wet and
5
Total drainage area (sq ft
533610
533610
6
Onsite drainage area (sq ft
507140
7
Offsite drainage area (sq ft)
Total BUA in project (sq ft
New BUA on subdivided lots (subject to
s ft)
New BUA not on subdivided lots (subject to
sf
Offsite BUA (sq ft
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft
- Sidewalk (sq ft
- Roof (sq ft
26470
8
219525 sf
218655 sf
9permitting)
219525 sf
218655 sf
10permitting)
sf
sf
11
sf
18529 sf
12
sf
sf
sf
sf
sf
sf
- Roadway s ft
87670 sf
86800 sf
- Future (sq ft
sf
sf
- Other, please specify in the comment box
below (sq ft
sf
sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
14
New infiltrating permeable pavement not on
subdivided lots s ft)
Existing BUA that will remain (not subject to
s ft
sf
sf
15permitting)
sf
sf
16
Existing BUA that is already permitted (sq ft
sf
sf
17
Existing BUA that will be removed (sq ft
sf
sf
18
Percent BUA
23%
44%
19
Design storm inches
1.0 in
20 Design volume of SCM cu ft
21 lCalculation method for design volume
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
65497 cf
Hydrocad
WET PO N D
11
Drainage area number
1
2
Minimum required treatment volume cu ft
20012 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
en ineered side slopes?
Are the inlets, outlets, and receiving stream protected from erosion
0-year storm)? 1
Is there an overflow or bypass for inflow volume in excess of the
design volume?
What is the method for dewatering the SCM for maintenance?
NO
7
Yes
8
Yes
Drawdown Orifice
Yes
9
10
If applicable, will the SCM be cleaned out after construction?
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
696.50
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
697.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
700.00
23
Elevation of the permanent pool (fmsl)
700.50
24
Elevation of the top of the vegetated shelf (fmsl)
701.00
25
Elevation of the temporary pool (fmsl)
701.72
26
Surface area of the main permanent pool (square feet)
7406
27
Volume of the main permanent pool (cubic feet)
17888 cf
28
Average depth of the main pool (feet)
3.50 ft
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
6403 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
48 in
35
Design volume of SCM (cu ft)
65497 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
If weir, weir height (inches)
If weir, weir length (inches)
Drawdown time for the temporary pool (days)
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Are berms or baffles provided to improve the flow path?
3 in
38
12 in
39
36 in
40
2.3
41
Yes
42
Yes
43
Depth of forebay at entrance (inches)
60 in
44
Depth of forebay at exit (inches)
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the No
permanentpool?
the pond minimize impacts to the receiving channel from the 1-
nstorm? Yes
Are fountains proposed? (If Y, please provide documentation that No
MDC(9) is met.)
Is a trash rack or other device provided to protect the outlet system? Yes
Are the dam and embankment planted in non -clumping turf grass? Yes
Species of turf that will be used on the dam and embankment Bermuda
494-hr
50
51
52
53
54
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):