HomeMy WebLinkAboutNCC224139_Site Plan or Location Map_20221219DocuSign Envelope ID: 066E47CA-5D9fi4051-B279-92DC6AFFA60C
1
9
A
F
E
C
B
(CftDUKE
ZENERGY
PROGRESS
R-2577A REIDSVILLE ROAD IMPROVEMENTS — PART 2
FORSYTH COUNTY, NC
EROSION & SEDIMENT CONTROL & ACCESS PLAN
SHEET LIST:
MIGRATORY BIRD HOTLINE
COVER SHEET
SHT 01 OF 15
PROJECT OVERVIEW
SHT 02 OF 15
STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT
THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,
EROSION & SEDIMENT CONTROL PLAN
SHT 03 OF 15
TRANSMISSION, AND DISTRIBUTIONS, SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT,
=
EROSION &SEDIMENT CONTROL PLAN
SHT 04 OF 15
AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY
r
EROSION & SEDIMENT CONTROL PLAN
SHT 05 OF 15
OPERATES THESE 24—HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND
-
EROSION & SEDIMENT CONTROL PLAN
SHT 06 OF 15
CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES.
EROSION& SEDIMENT CONTROL PLAN
SHT 07OF15
CAROLINAS: 800.573.3853 FLORIDA: 727.386.3084 MIDWEST: 317.430.4497
PROJECT AREA
EROSION & SEDIMENT CONTROL PLAN
SHT 08 OF 15
EROSION & SEDIMENT CONTROL PLAN
SHT 09 OF 15
SPILL REPORTING HOTLINE
EROSION & SEDIMENT CONTROL PLAN
SHT 10 OF 15
IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE
EROSION & SEDIMENT CONTROL PLAN
SHT 11 OF 15
ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF
EROSION & SEDIMENT CONTROL PLAN
SHT 12 OF 15
SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER
EROSION & SEDIMENT CONTROL DETAILS
SHT 13 OF 15
REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.
NCG01 DETAILS 1
SHT 14 OF 15
IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS
NCG01 DETAILS 2
SHT 15 OF 15
PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU
ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL,
--
CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT:
°
CAROLINAS & MIDWEST: 800.527.3853 FLORIDA: 866.769.1266
USGS The National Map: National 8oun0aries Dateset. 30EP,Elev:
Geographic Names Information System, Natbnal Hy@ograpM1y Rat[
Lantl Cover Database, National Structures Datase1,-antl National�rr,
Oatase4 USGS Global Ecosystems; U �S. Census BTI ureau GERIL,
- "'ftaatl Data', Nat 1 —1, Date; U.S. Department of Stele Na fmta
lnforrnation Unit, and NOAA National Centers for EnviionSnental lnfr
Coastal Relref Modal. Data refreshetl June, pm
VIEWPORT SCALE
1:24,000
19 Dewberry'
Dewberry Engineers Inc.
2619 WYCLIFF ROAD
SUITE410
RALEIGH, NC2—
PHONE: 919-1.9969
FAX: T..'.9923
NCBELS¥F-0M
Lu
JZ
W
> :5;
Cn
> cc
�
� aQ
a-
Lo
N0
CL o
1E
SEAL
° ��e5 bFES§j ••,,��y
�_ 030966
fi Ali
42�6�H IB FS �F��
w2i2022 �ignmlpuN��
KEY PLAN
SCALE
AS NOTED
1 11/01/22 1 EBS 100% FOR PERMITTING
0 6/17/22 1 EBS PRELIMINARY PLANS
No. DATE BY nFSCRIPTION
REVISIONS
ZAE/DM
DRAWN BY
EBS
APPROVED BY
EBS
CHECKED BY
11/01/22
DATE
TITLE
REIDSVILLE ROAD COVER PAGE
PROJECT NO. 50130652