HomeMy WebLinkAbout20221396 Ver 1_James Michael Bridges - Additional Drawing_20221129ands es Aeciiii0'-1
T-nf6wyt- C)in
12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
Full Pond/ Normal Water Level
Shoreline
j e{rlr� p CO Kvi do r
GD O = L%oo
I�x(�o = (000
i ooa — r
12 0 0 59t+'
Plan View
La ke
(At Full Pond/ Normal Water Level)
I -- to o-� - -
Nok,
®' Jrnp
�'Y�GS, S h►�Lrs
301
Pools + aJgti A
in-f b +,vu l"e-oA a,�
Lake n
(At Full PW /NMMW WaW Level) Existing Dock CS 4—
-10ftx7ft
3ftx15oft
Full Pond/ Normal Water Level Below full PmW NWL
� � t-t/�/► i (�(_L(a)/(/''
— SFioreTine Ri ra 4r. 150ft
Riprap A-e IWI Pond/ NWL
2 ft.x150ft.
ad�tional clearing
If —..ry
i
i
i
Plan View
FORM: SSGP 02-2017 Page 3 of 4