Loading...
HomeMy WebLinkAbout20221396 Ver 1_James Michael Bridges - Additional Drawing_20221129ands es Aeciiii0'-1 T-nf6wyt- C)in 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Level Shoreline j e{rlr� p CO Kvi do r GD O = L%oo I�x(�o = (000 i ooa — r 12 0 0 59t+' Plan View La ke (At Full Pond/ Normal Water Level) I -- to o-� - - Nok, ®' Jrnp �'Y�GS, S h►�Lrs 301 Pools + aJgti A in-f b +,vu l"e-oA a,� Lake n (At Full PW /NMMW WaW Level) Existing Dock CS 4— -10ftx7ft 3ftx15oft Full Pond/ Normal Water Level Below full PmW NWL � � t-t/�/► i (�(_L(a)/(/'' — SFioreTine Ri ra 4r. 150ft Riprap A-e IWI Pond/ NWL 2 ft.x150ft. ad�tional clearing If —..ry i i i Plan View FORM: SSGP 02-2017 Page 3 of 4