HomeMy WebLinkAboutSW1221201_Supplement-EZ Form_20221215FORMS LOADED
PROJECT INFORMATION - -- - --
1 Project Name James River Equipment -Mills River
2
_
Project Area (ac)
16-61
3
Coastal Wetland Area (ac)
0
4
Surface Water Area (ac)
0
5
Is this project High or Low Density? �
High
6
Does this project use an off -site SCM?
No
NUMBER AND TYPE OF SCMS:
11m Infiltration System
12
Bioretention Cell
2
13
Wet Pond
14
Stormwater Wetland
15
Permeable Pavement�
16
Sand Filter
17
Rainwater Harvesting (RWH)
18 _
Green Roof _
19
Level Spreader -Filter Strip (LS-FSjw__
20
Disconnected Impervious Surface {DIS)
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
Bayfilter
26
Filterra
FORMSLOADED
DESIGNER CERTIFICATION
27 Name and Title: Mark Brooks, PE
28
Organization:
Brooks Engineering Associates, PA
29
Street address:
15 Arlington Street
30
City, State, Zip: W
Asheville, NC 28801
31
Phone number(s):
828-232-4700
32
Email:
mbrooks@brooksea.com
Certification Statement:
I certify, under penalty. of law that this Supplement-EZ form and all. supporting information were prepared under my direction or.supervision; that the
information provided in the form. is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,'!
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer E i+
AL
' Sea! / !/
Signature o Des gner
Date
Z =I I k"F `-
1
Is this a high densityproject?
Yes
__ 2
If so, number of drainage areaslSCMs
2
3
Does this project have low density areas? �_
No
4
If so, number of low density drainage areas
0
5
Is alllparl of this project subject to previous rule
versions?
No
CLICK TO LOAD FORM
DRAINAGE AREA INFORMATION -
Entire Site :'-:
Bioretention
1
Bioretention
.2
Bioretention
4
Type of SCM
5
Total drainage areas ft
510,681
225,834
284,847
6
Onsite drainage area (sq ft
510,681
225,834
284,847
7
Offsite drainage areas ft
0
0
0
_
8
Total BUA in project (sq ft _
370670 sf
170002 sf
200668 sf
9(sg
New BUA on subdivided lots (subject to permitting)
ft)
NIA
NIA
NIA
10
New BUA not on subdivided lots (subject to
permitting} (sf}
370670 sf
170002 sf
200668 sf
11
Offsite BUA (sq ft)
12
_-___�
Breakdown of new BUA not on subdivided lots:
Parking (sq ft) _
36054 sf
846a sf
27586 sf
Sidewalk (sq ft
1676 sf
1080 sf
596 sf
_
Roof (sq ft
48321 sf
33821 sf
14500 sf
Roadwa sq�
Future (sq ft
Other, please specify in the comment box
below s ft
284619 sf
126633 st
157986 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
_
New infiltrating permeable pavement not on
subdivided lots (sq ft)
_14
15permitting)
Existing BUA that will remain (not subject to
s ft}
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA _
73%
75%
70%
19
tlesi n storm inches
1.49 in
1.51 in
20
Design volume of S_CM ft�
13961 of
16237 cf
21 Calculation method for design volume
ADDITIONAL INFORMATION'
Simple Simple
22
Please use this space to provide any additional information about the
drainage area(s):
Ocher Areas: Gravel Equipment Storage Pad
111.01,111,111,11,1
'
1 1
Drainage area number
1
2
2
_
Minimum re uired treatment volume cu ft
13691 cf
16237 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils? _
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3A
3:1
_
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion_
(10-year storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
Drawdown Orifice
10
if applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
NIA
NIA
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
16
Does the SCM follow the device specific MDC?
Yes
Yes
mm 17
NO —RETENTION
Was the SCM designed by an NC licensed professional?
Yes
Yes
CELL MDC FROM 021-11.1052
�18
SHWT elevation (fmsl)
<2086
<2086
19
Bottom of the bioretention cell (fmsl)
2093.00
2091.00
20
Ponding depth of the design storm (inches)
12 in
12 in
21
_
Surface area of the bioretention cell (square feet)
17161 sf
10684 sf
22
Design volume of SCM (cu ft)
13691 cf
16237 cf
23
_
Is the bioretention cell used for peak attenuation?
Yes
Yes
24
Depth of peak attenuation over planting surface (in)
24 in
24 in
25
Height of peak attenuation outlet above the planting surface (in)
12 in
12 in
26
Infiltration rate of the in situ soil (inch/hour)
.06 in/hr
.25 inlhr
27
Diameter of the underdrain pipes (if applicable)
6 in
6 in
28
Does the design include Internal Water Storage (IWS)?
Yes
Yes
29
_
if so, elevation of the top of the IWS (fmsi)
2091.5
2089.5
30
Elevation of the planting surface (fmsl)
2093
2091
31
What type of vegetation will be planted? (grass, trees/shrub—s,
other)?
Grass
Grass
32
Media depth (inches)
36 In
36 in
33
Percentage of medium to coarse washed sand by volume
84%
84%
34
Percentage of fines (silt and clay) by volume
8%
8%
35
Percentage of organic matter by volume
8%
8%
36
Type of organic material
Pine Bark Fines
Pine Bark Fines
37�
Phosphorus Index (P-Index) of media (unitiess)
10
10
38
Will compaction be avoided during construction?
Yes
Yes
39
Will cell be maintained to a one inch/hour standard? _
Yes
Yes
40
Depth of mulch, if applicable (inches)
NIA
NIA
41
Type of mulch, if applicable
NIA
NIA
42
How many clean out pipes are being installed?
7
7
43
Type of pretreatment that will be used:
Grassed Swales
Grassed Swales
Bioretention 3 2:58 PM 12/14/2022