Loading...
HomeMy WebLinkAboutSW1221201_Stormwater Report_20221215BRO" C)KS Planning & Project Management / Civil Engineering / Surveying Soil Scienca Services / Environmental Engineering & Services EN G i N FFRI NO Ass cl CIATES 17 Arlington Street / Asheville NC 28801 / wwabroolcsea,com 1828-232-4700 JAMES RIVER EQUIPMENT BUNG®MBE C®I, NTY9 NORTH CAROLINA STORMWATER MANAGEM,ENT, EROSION AND HEDIMENTATION CONTROL: NARRATIVE AND CALCULATIONS PREPARED FOR: JRE MILLS RIVER, LLC CONTACT: DAN METCALF 11047 LEADBETTER ROAD ASHLAND, VA 23005 CArR PREPARED BY: MARK BRDDKS, PE BROOKs ENGINEERINI3 ASSOCIATES, PA 1 5 ARLINGTON ST -- ASHEVILLE, NC 28801 ORIGINAL: 1 1/O2/2022 REVISED: 1 2/1 4/2022 TABLE OF CONTENTS Project Narrative and Methodology.................................................................. Section 1.0 - 4.0 Current Property References — Deeds, Plat, Easement Agreements, Secretary of State....... Appendix A NOAA Precipitation Charts, USGS Quad, FEMA Flood and NRCS Maps, Soils Report.... Appendix B Pre and Post Development Drainage Maps ......................................................... Appendix C HydroCAD Routing Diagram........................................................................ Appendix D Pre and Post Developed Hydrographs............................................................... Appendix E Stage/Storage, Stage/Discharge, Draw -Down, and WQV Calculations ....................... Appendix F Stormwater Conveyance, Energy Dissipation, and ESC Calculation Tables ................. Appendix G Stormwater Operation and Maintenance (O&M) Manual ....................................... Appendix H 1.0 PROJECT NARRATIVE 1.1 Summary & Design Parameters The included calculations, specifications, and accompanying engineering plans are provided in order to demonstrate compliance of the project design with NCDEQ Stormwater, Erosion, and Sedimentation Control per 15A NCAC 02H and the NCDEQ Stormwater BMP Manual. The 16.61 acre subject property is to be developed into a commercial equipment sales facility, requiring land disturbance of approximately 13.69 acres. To ensure that these operations are lawful under the NCDEQ Ordinance, measures will be provided which aid in sediment trapping, surface stabilization, stormwater conveyance, stormwater discharge/outlet stabilization, post -construction stormwater quality treatment, and post - construction peak discharge mitigation. In addition to outlining the construction and implementation of these measures, this report will also outline the required site reporting and notifications through the duration of the project. 1.2 Existing Conditions The subject site is located on Fanning Fields Road, Henderson County, North Carolina, PIN 9642-15- 4293 (see Appendix A for current property references, including Deeds, Plat, and Easement Agreements with adjoining and landlocked parcels). Publicly available resources relevant to the project can be found in Appendix B, including the current printed USGS quadrangle map with site location and surrounding land use, FEMA Flood Panel, NOAA Atlas 14 Point Precipitation Charts, and NRCS Soil Survey results (soil characteristics, hydrologic soil group (HSG), and estimated depth to water table) for the project area The 16.61 acre site's use is currently undeveloped, consisting of an open field and wooded areas, with soil types Co, DeB, HyC, HyE, and TeC (all soils on site are reported to be HSG Q. Runoff from the site drains overland to MCDOWELL CREEK (INDEX: 6-58 CLASS: C), which drains to the FRENCH BROAD RIVER (INDEX: 6-(54.75), CLASS: Q. The entirety of the site discharges to McDowell Creek which is located on the western border of the subject property. 1.3 Proposed Disturbance Land disturbance will be performed in 3 phases. The first phase will provide sediment loss protection during Clearing and Grubbing operations through installation of perimeter measures including a stabilized construction entrance to protect against vehicle tracking of sediment onto public roads, silt fence with reinforced stabilized outlets for water filtration and sediment capture, and 2 skimmer sediment basins with associated temporary and permanent diversions to provide capture of runoff and allow for discrete particle settlement. The second phase covers the period where Mass Grading activities will take place on the site, specifically rough grading of roads and building pads. This phase includes maintenance of the existing Phase 1 measures, utilization of diversions and slope drains to protect slopes as they are brought to final grade and stabilized with matting and vegetation, and also installation of several components of the permanent stormwater conveyance system with appropriate inlet and outlet protection devices. The final phase covers achieving Final Surface Stabilization through the installation of remaining utilities such as water, sewer, and post -construction stormwater control measures, final construction of the roads, and forming of concrete elements such as gutter and sidewalks. Specifically, this phase delineates the inlet/outlet protection measures to be maintained until adequate stabilization is achieved and the steps included in conversion to full utilization of the post -construction stormwater facilities as well as removal of all temporary sediment devices. In accordance with NCDEQ standards, all erosion control measures are designed for the 10-year storm event. 1.3 Post -Development Conditions The proposed build -out for commercial property includes a sales and maintenance building, storage building, wash pad, asphalt parking lot, and gravel pad. Stormwater runoff will be collected through swales that will run the perimeter of the gravel pad. A stormwater collection system will be used to covey the proposed roof leaders to the swales. This runoff will be conveyed to one of two bioretention ponds. Each of these Stormwater BMPs have been designed to treat the Water Quality Volume resulting from the first inch of rainfall in its associated subcatchment for minimum 85% TSS removal, to and to safely pass the 25-year/24-hour storm through the system's outlet controls. Runoff volume drawdown time shall be a minimum of 48 hours, but not more than 120 hours. 2 2.0 STORMWA TER CONTROL MEASURE CALCULATION PROCEDURES 2.1 Water Quality Volume (WQV) Bioretention ponds will be provided to treat the runoff from the development and achieve 85% Total Suspended Solids removal. The required storage/treatment volume for each stormwater control measure was determined in accordance with the "Simple Method for Runoff Volume" as outlined in the NCDEQ Stormwater BMP Manual, Part B: Calculations Guidance. This method calculates the WQV as the runoff resulting from the first F of rainfall in each stormwater control measure watershed. Please see the WQV calculations included in Appendix F. 2.2 Water Quantity The SCS Method using a 24-hour, Type II storm was used to determine the pre -developed and developed annual peak stormwater discharges generated from this site. The HydroCAD runoff routing program was used to determine these peak flows and storm volumes as well as routing through the bioretention ponds and bypass areas. Stage/discharge rates for the systems were determined based on storage, culvert, orifices and weir equations within Hydrocad. Calculations for the 25-year storm event were performed to show the bioretention ponds are adequately sized to pass the 25-year storm event. Rip -rap aprons are provided along with outlet control structures for primary drainage from basin areas. 2.3 Results The following table shows the pre/post runoff rates for the project. As can be seen, there is no increase in the 1-year, 24-hour storm peak discharge rate at the study points. It is also shown that for this development, both the 25-year, 24-hour storm and 50-year, 24-hour storm will pass safely through the system's outlet control structures before exceeding the system's total storage capacity. PEAK RUNNOFF SUMMARY Basin Name 1-Year 25-Year 25-Yr Pondin2 50-Yr Ponding Basin Existing 15.53 66.34 Basin Proposed - Total 12.55 75.71 To SCM-1 18.68 42.27 To SCM -2 22.76 52.59 ::]& a SCM-1 1.14 21.28 2095.03' 2095.21' SCM-2 8.09 38.69 2093.55' 1 2093.71' Bypass 4.03 17.06 2.3 Conclusions Brooks Engineering Associates recommends that the proposed development utilize Stormwater Control Measures with outlet controls as outlined in this study and detailed in the associated engineering plans in order to treat runoff and mitigate developed peak stormwater discharges per the NCDEQ stormwater ordinance. Routine maintenance as outlined in the Operations and Maintenance (O&M) Manual (Appendix H) will need to be performed in order for the stormwater management facilities to operate as designed. 4 3.0 STORMWATER CONVEYANCE CALCULATION PROCEDURES 3.1 Stormwater Collection System Stormwater will be collected and conveyed onsite utilizing NCDOT Standard structures and inlets as well as HDPE pipe conforming to the standards of the pipe manufacturer and NCDOT. A number of open channel conveyances are utilized to capture runoff from building roofs and more thoroughly define the watersheds for the stormwater control measures (SCMs). All components of the stormwater system have been designed to safely convey the 25-year storm event at a minimum. 4. 0 EROSION/SEDIMENTATION CONTROL (ESQ CALCULATION PROCEDURES 4.1 Skimmer Sediment Basins All 2 of the post -construction basins will utilize skimmer -type sediment basins through the construction/land disturbance phases until final site stabilization is achieved. The basins are designed in accordance with NCDEQ 6.64, but using the 25-year storm instead of the 10-year storm. Ce Appendix "A" • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online - Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name JRE Mills River, LLC Information Sosld: 2242179 Status: Current -Active O Date Formed: 7/30/2021 Citizenship: Foreign State of Incorporation: VA Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: Robertson, R. Lee, Jr. Addresses Mailing Principal Office 11047 Leadbetter Road 11047 Leadbetter Road Ashland, VA 23005-3408 Ashland, VA 23005-3408 Reg Mailing 2730 East W.T. Harris Blvd. Suite 101 Charlotte, NC 28213-4063 Company Officials Reg Office 2730 East W.T. Harris Blvd. Suite 101 Charlotte, NC 28213-4063 All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. President Mark D Romer 11047 Leadbetter Road Ashland VA 23005-3408 BK 3852 PG 423 - 426 (4) This Document eRecorded: Fee: $26 0 00 Henderson County DOC# 971478 01/12/2022 North Carolina William Lee King, Register of Deeds 04:10:37 PM Tax: $11165000 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $1,,165..00 Parcel Identifier No: Tract I REID 80515 PIN 96421557204P Tract 24P REID 9962414 PIN 96421555704P Tract 3: REID 9968103 PIN 9642153631 Mafl/Box to: Ward & Smi PA 82 Patton Ave #300. Asheville. NC 28801 This instrument was prepared by: Sherri L. Brewer Brief description for the Index:3tracts off F THIS DEED made this 28th If DEED PREP ONLY Fields Rd day of December, 202 1, by and between GRANTOR JAMES GREGORY JONES and wife, CYNT 1A MAE JONES 1/2 Undivided Interest, And RUSSELL LEE JONES, and wife, MIC ELLE SPROUSE BLACKBURN 1/2 Undivided Interest 8708 Montauk Drive Raleigh, NC 27615 TITLE NOT EXAMINED JRE Asheville, Carolina Limit GRANTEE LLC, a North ed Liability Company 11047 LeadbeLLer Road Ashland, VA 23005 21m2919 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors', and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETHI, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Mills River Township, Henderson County, North Carolina and more particularly described as follows: SEE ATTACHED EXHIBIT A. The property here inabove described was acquired by Grantor by instrument recorded in Book 3132 at Page 161. All or a portion of the property herein conveyed x includes or _ does not include the primary residence of a Grantor,, A map showing the above described property is recorded in Plat Slide NC Bar Association Form No. 3 O 1976, Revised O 1/1/2010 Printed by Agreement with the NC Bar Association submitted electronically by "ward and smith, P.A." in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Henderson County Register of Deeds. BK 3852 PG 423 - 426 (4) DOC# 971478 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in flee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: Subject to Henderson County ad valorem taxes. Subject to Restrictions, Easements, and Rights of Way of Record. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. By: Print By:_ Title: Name and Title f� r James Gr o -Jones Cyntlil'a Mae Jones Russell Lee Jon A Y / 1 By. Title: Michelle Sprouse Blackburn (Affix Seal) State of NORTH CAROLINA - County of HENDERSON SEAL 'SEAL 'SEAL I, the undersigned Notary Public of the County and State aforesaid, certify that James Gregory Jones, Cynthia Mae Jones, Russell Lee Jones and Michelle Sprouse Blackburn SEAL personally appeared before me this day and acknowledged the due execution olf" the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this ;;Lt day of ; »r�,,�„�j�u.�, , 202 1. My Commission Expires: 1�- I�i -ac�D NC Bar Association Form No. 3 C 1976, Revised 0 1/ 1 /20 10 Printed by Agreement with the NC Bar Association H Notary's Printed o i e,, Notary Public r Typed Name BK 3852 PG 423 - 426 (4) TRACT I0 : DOC# 971478 EXHIBIT A BEGINNING at a '/z inch open iron pipe,, said '/z inch open iron pipe being located i*n the common line of the property now or formerly owned by NCSU Mountain Horticulture (Deed Book 614 at Page 387, Henderson County Registry), and thence from said beginning point, North 07 deg. 03 min. 20 sec. East 568094 feet to a concrete monument with a nail; thence South 76 deg. 04 min. 34 sec. East 191.4D feet to a point; thence South 15 deg. 24 min. I 6 sec. East 445.08 feet to a 1.5 inch iron located 1 inch above grade; thence South 76 deg. 32 min. 23 sec. West, passing a #4 rebar at 33.17 feet, for a total distance of 384.45 feet to a '/z inch iron pipe, the POINT AND PLACE OF BEGINNING, containing 3o'...0 acres, more or less, and being designated a "Subject Tract #1" as shown on that survey by Brooks Engineering Associates entitled, "Survey for James River Equipmentdated December 21, 2021, reference to said plat is hereby made for a greater certainty of description. BEING all of Tract 1 consisting of 3.20 acres as shown on Plat Slide 3868 as recorded i*n the Office of the Register of Deeds for Henderson County, North Carolina. TRACT II: BEGINNING at a magnetic signal in the centerline of Fanning Fields Road (S.R. #1354), thence from said beginning point, South 76 deg. 32 min. 17 sec. West., passing a 1.5 inch iron bent at 20.16 feet", for a total distance of 167.68 feet to a 1.5 inch iron located 1 inch above grade, said '/z inch iron also being the southeastern corner of"Subject Tract I" as described above, thence North 15 deg. 24 min. 16 sec. West 131.89 feet to a point, said point also being the southwesternmost corner of "Subj*ect Tract 3" as described below; thence, North 76 deg.. 32 min. 24 sec. East 157.13 feet to a point in the southern edge of a gravel drive; thence North 76 deg. 32 min. 24 sec. East 6.52 feet to a point in Fanning Fields Road S.R. #1354 thence South 17 deg. 09 min. 10 sec. East 132.08 feet to the POINT AND PLACE OF BEGINNING, containing 0.50 acres', more or less', and being designated a"SubJ ect Tract #2" as shown on that survey by Brooks Engineering Associates entitled", "Survey for James River Equipment," dated December 211) 20211 reference to said plat is hereby made for a greater certainty of description. TRACT III: BEGINNING at a point located on the edge of Fanning Fields Road (S.R. 1354), thence South 76 deg. 32 min. 24 sec. West 157.13 feet to a point; thence North 15 deg. 24 min. 16 sec. West 313.19 feet to a point, said point being located on the common line with the property now or formerly owned by Mane -Jeanne and Narcisse Cadgene (Deed Book 910 at Page 713, lien hderson County Registry); tence South 76 deg. 04 min. 34 sec. East 171.66 feet to a one -inch open iron pipe-0 thence out 17 deg. 12 min. 30 sec. East 234.56 feet to the POINT AND PLACE OF BEGINNING, containing 0.96 acres, more or less, and being designated a "Subject BK 3852 PG 423 - 426 (4) DOC# 971478 Tract #3" as shown on that survey by Brooks Engineering Associates entitled', "Survey for James RiverEquip entl" dated December 211, 20211, reference to said plat is hereby madeforagreater certainty of description. The above three tracts were conveyed to James Gregory Jones', Russell Lee Jones', and Phillip Nathaniel Jones per the Last Will and Testament of James Franklin Jones as filed in Estate File 16-E-966 in Henderson County, North Carolina. BEING all of the same real property described in that Deed recorded in Book 3 the Office of the Register of Deeds of Henderson County, North Carolina. ND: 4859=6614=0680, v. 4 1321, Page 1611, in DocuSign Envelope ID: 9E7177OA-9FAE-4CO3-A6C9-OB54E4639085 CONCRETE MONUMENT W/ NAIL j I CONTROL CORNER l NCGS NAD 83-2011 l / N. 625937 44 \ l / E.• 947295. 95 \\ \ MARIE-JEANNE & NARCISSE �I CADGENE • DB. 910, PG. 713 PP SLIDE 3133 / I PIN: 9642-16-3389 1 ' I S 76 04'34,, e 1" OPEN IRON PIPE 3 1 1 \ 63 DISTURBED J CORNER IN LARGE TRASH PILE \ 06' NO EVIDENCE RECOVERED \ o • I nNO-3 \ \ i \ nNo a \\\ MG�ULq Q GRA EL DR/ VE l \ nNO-3 \ P w \ \\ nHo-3 S oy \ I \\ nNa3 1 't \ 0J 1 / I \ PP N_ ` \ ABOVE GROUND POOL 5' CHAINLINK FENCE I I \ G?' �, ON WEST SIDE OF PROPERTY LINE \ 1 y\ �7 'o I' o) BARBED WIRE FENCE o \ 50 coo ON EAST SIDE OF PROPERTY LINE \ o 03 � o W / N / O ` 02- Z \\\\ m ASPHALT DRIVE 0 gfPBANppNE % \ GV \ \ \ L1NE 0 In \ ( 500 YEAR FLOODPLAIN \ GR i 100 YEAR FLOODPLAIN I I I �1 1 / NCSU MOUNTAIN HORTICULTURE l l Da 614, PG. 387 PIN: 9642- 05-5915 I I A / I '( I I II i i r / 7 / / i i o 1 401 1 l W1 \' i �+ IN I O' oil Z' I I ( � 1 I I II " PIPE PER SLIDE 9977 I i 1 • I � ' 1 ( I o � I / � I `d o I �" PIPE PER SLIDE 9977 JACK & REBECCA NESBI TT DB. 1646, PG. 74 �� �\ i !W 258.2 SLIDE 786 -6 294� PIN: 9632-94-8966�S CLIFFORD AND DONNA LANCE \ DB. 841, PG. 409 \ PIN: 9642-14-2554 CONCRETE MONUMENT PER SLIDE 9977 PP 1 METAL FRAME / \ GARAGE 1 \ so 1 �/ / 1 �" IRON \\ ___,_, • 1' ABOVE j ( _ • • / 1 �" IRON BENT 1 1' ABOVE GRADE 0.4' NORTH OF LINE #4 REBAR AS �O BE ABPNp0NE0 ON SLIDE 9977REFERENCED I ALUMINUM R/W MONUMENT T' PER SLIDE 9977 4" OPEN IRON PIPE SUBJECT PARCEL LINE BEARING DISTANCE L1 N 76°32'24" E 6.52' L2 S 76*32'17" W 6.64' L3 S 17°07'51 " E 29.98' L4 S 17°07'51 " E 21.35' L5 S 17°14'59" W 39.47' L6 S 21°22'36" E 1.96' L7 N 89°22'37" E 10.23' CURVE RADIUS ARC LENGTH CHORD BEARING CHORD LENGTH C 1 507.63' 79.67' S 23*27' 16" E 79.59' C2 507.63' 23.21' S 29°15'38" E 23.21' C3 507.63' 171.69' S 40° 15'34" E 170.87' Submitted electronically by Brooks Engineering Associates, P.A. in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Henderson County Register of Deeds. PLAT NOTES: 1. The bearings on this plat are NC Grid (NAD 83) bearings, and distances shown are horizontal ground distances unless otherwise noted. 2. Total area of recombined parcel: 16.612 Acres or 723,604 square feet (determined by coordinate computation method). 3. The purpose of this plat is to recombine parcels as shown hereon. 3. Mills River Zoning: MR -MU 4. By graphic determination, the Subject Parcels are located in "Zone AE" and "Zone V per FIRM map number 3700964200K dated January 6, 2010. Henderson County GIS was used to determine adjoiner owner information. 5. Underground utilities were not marked at the time of the survey. Above ground utilities are located based on visible, above ground structures. 6. Property subject to all easements, rights -of -way and restrictions of record. 7. This plat was prepared without the benefit of a title report which may reveal additional conveyances, easements, rights -of -way or building restrictions. A North Carolina licensed attorney -at -law should be consulted. 8. Surveyor made no independent investigation to potential overlaps and/or gaps as referenced on Plat Slide 9977. See referenced plat for comments. RECOMBINATION OF DEED BOOK 3168 PAGE 575 DEED BOOK 3852, PAGE 423 SLIDE 9977 REFERENCE PLAT SLIDE 3868 TAX PIN: 9642-15-5016, 9642-15-3631, 9642-15-5570, & 9642-15-5720 16.612 Ac. 723,604 Sq. Ft. (Cp.\ MAGNETIC SIGNAL STATE OF NORTH CAROLINA C%NTY �F BUNCOMBE I, att C amp, on , Review Officer of Buncombe County, certify that the map or plat to which this certification is affixed meets all statutory requirements for recording. .—DocuSigned by: '­dReeiew0 fwcer 9/6/2022 Date: IN ASPHALT ROAD \ �2 �W \ r Q 644 FANNING FIELDS, LLC D z DB. 1651, PG. 44 \ Z PIN: 9642-25-0464 m � \ u)��m � `n o - O CP Oorn-M A Z N p PP\(J' cp: -o ' o o \ yG \ m ALUMINUM R/W MONUMENT PER SLIDE 9977 REBAR W/ CAP PP PER SLIDE 9977 hG 30' PRIVATE EASEMENT J" PIPE SEE SLIDE 9977 FOR COMMENTS PER SLIDE 9977 PIPE i PER SLIDE 9977 _ i o_ iW 85.20 ,! 4B 52 i i Ag154 ' �6°4� 2a \ JAMIE BURWELL \ DB. 1666, PG. 574 PIN: 9642-14-6623 \ SHEILA RAPP \ DB. 1080, PG. 1 \ PIN: 9642-14-4558 I, Troy A. Shriver, Professional Land Surveyor certify to one or more of the following as indicated (G.S. 47-30(f)(11): D. That the survey is of another category, such as the recombination of existing parcels, a court -ordered survey, or other exception to to the definition of a subdivision; I, Troy A. Shriver, certify that this plat was drawn by me from an actual survey made under my supervision (deed description recorded in Deed Book 3168, Page 575 and Deed Book 3852, Page 423); that the boundaries not surveyed are clearly indicated as drawn from information found in Plat Slide 9977; that the ratio of precision as calculated is 1:10000; that this plat was prepared in accordance with G.S. 47-30 as amended. 9/6/2022 Witness my hand and seal this date of DocuSigned by: fi'ra� SIA,vi�a,v' Signature Fnnr.�a n�aFFaa� Professional Land Surveyor Certificate Number L-5063 /GINEER��C \ NORTH f m CAROL INAn `) 1 ` F o yG \ \ P L6P 7 \ PP \ o ° \ \ =oom o \ 0 IZ53 Mo \ o o_ \ z j \ V,Ob \ Q. NARCISSE & w N \ \ MARIE JEANNA c CADGENE DB. 910, PG. 773 PIPE SLIDE 3134 PIN: 9642-24-1817 PER SLIDE 9977 _ / � g5.3 / • 46' 15 \N #4 REBAR / d OOPS 6`\� j PER SLIDE 9977 232. 32 00 ''��S 6.4g 23 i \ BONNIE & WILLIAM JONES DB. 1349, PG. 170 \ PIN: 9642-14-8619 BK 2022 PG 14397 - 14397 (1) DOC# 986026 This Document eRecorded: 09/06/2022 10:36:06 AM Fee: $21.00 Henderson County, North Carolina Tax: $0.00 William Lee King, Register of Deeds PROPERTY LINE — — — — — — — — — — PROPERTY LINE PER PLAT 9977 -------------------- PROPERTY LINE TO BE ABANDONED HISTORICAL TRACT LINE ADJOINER'S PROPERTY LINE — — RIGHT- OF- WA Y BUILDING PA VEMEN T EDGE OF GRAVEL o FENCE (AS NOTED) E-sr STORM WA TER PIPE E-OHU OVERHEAD UTILITY LINE ❑• MONUMENT FOUND 0 REBAR FOUND 0 IRON PIPE FOUND NAIL FOUND O CALCULATED POINT LIGHT POLE PP C-0 POWER POLE GV D4 GAS VALVE C 100 YEAR FLOODPLAIN r J 100 YEAR FLOODPLAIN [] 500 YEAR FLOODPLAIN SCALE 111=60' 0' 60' 120' 180' PROJECT#: 539621 eoou 3072 PAGE 5I5 (4) Mv°° 111111111111111111111 This document presented and filed: 06/29/2017 12:56:11 PM Aj WILLIAM LEE KING, Henderson COUNTY, NC Transfer Tax: $0.00 SEWER EASEMENT FROM 644 FANNING FIELDS, LLC TO COVE CREST, LLC Cove- CV.>E.ST , Lac CIO M. t . k Tv \S `3 `r IPt �0 2 2.o vt-zz-" t a7EQIS t•1\1\(-�—E) YvC zs-r 9 Z. Book 3072 Page 576 Return to: Cove Crest, LLC 1584 Airport Road Hendersonville, NC 28792 STATE OF NORTH CAROLINA SEWER EASEMENT COUNTY OF HENDERSON THIS INDENTURE, made and entered this the day of June, 2017, by and between 644 FANNING FIELDS, LLC, (herein after called Grantor, with a mailing address of c/o 1710 Ringwood, LLC, 777 First St PMB 510, Gilroy, CA 95020), his respective heirs, successors in interest or assigns, and COVE CREST, LLC, a North Carolina Limited Liability Company, (hereinafter called Grantee, with a mailing address of: c/o MT Industries, Inc., 1584 Airport Rd, Hendersonville, NC 28792); WITNESSETH: That the Grantor, for and in consideration of the sum of Ten Dollars ($10.00) and other valuable considerations to it in hand paid by the Grantee, the receipt whereof is hereby acknowledged, has given, granted, bargained, sold and conveyed, and by these presents does give, grant, bargain, sell, convey, and confirm unto the Grantee, its successors and assigns, a perpetual right of easement appurtenant to and for the benefit of only that real property described in deed of record in Deed Book 1653 at page 189 in the office of the Register of Deeds for Henderson County, North Carolina to construct, maintain and repair a sewer line, with all necessary manholes, fittings, fixtures, and accessories, in, over, and upon a certain piece or parcel of land in Henderson County, North Carolina, described as follows: BEING a strip of land shown as a 20' proposed sanitary sewer easement located along the northern margin of that parcel of property more particularly described in deed of record in Deed Book 1651 at Page 44 in the Office of Register of Deeds for Henderson County North Carolina, and shown on a map entitled "Plat of Survey for Cove Crest, LLC" which plat is recorded at Plat Slide 10500 in the office of the Register of Deeds for Henderson County, North Carolina, reference to which plat is hereby made for a more particular description. TOGETHER WITH the right to go upon said lands whenever the same is necessary for the purposes of inspecting, maintaining, and replacing said line, and together with the further right, only as necessary to inspect, maintain or replace said line, to clear said strip and keep the same clear at all times and to remove therefrom all brush, trees and other obstructions. It is understood and agreed that the Grantor shall at all times, other than while the said sewer line is under actual construction, have the right to pass and repass over and upon said strip; provided such cultivation or use shall in no manner interfere with the use thereof by the Grantee as provided herein. Nothing herein contained shall be construed as permitting the erection of a shed, building, or any other construction by the Grantor. If any man-made structures owned by the said Grantor are damaged during the installation of said sewer line, the Grantee hereby agrees to repair the same. If any of Grantor's lawn, landscaping or cultivated shrubs are damaged by the installation or maintenance of said sewer line, the Grantee hereby agrees to restore the same. Book 3072 Page 577 TO HAVE AND TO HOLD said right and easement unto the Grantee, and its successors and assigns forever, it being agreed that the right and easement hereby granted is appurtenant to and runs with the land now owned by the Grantor herein above referred to. And the Grantor covenants to and with the Grantee, its successors and assigns, that the Grantor is lawfully seized in fee simple of said lands and premises and has full right and power to convey this easement to the Grantee. IN WITNESS WHEREOF, the Grantor has caused this deed to be executed in its name by its undersigned member/manager, this the day and year first above written. STATE OF CALIFORNIA COUNTY OF I, hereby certify that SHARON L appeared before me this day and Deed by and on behalf of the said 644 FANNING FIELDS, LLC By: (SEAL) RON CASTILLO, Member/Manager a Notary Public, in and for the above County and State, do TILLO, Member/Manager of 644 Fanning Fields, LLC, personally nowledged the due and voluntary execution of the foregoing Sewer 54 anning Fields, LLC, for the purposes stated therein. WITNESS my hand and notarial seal, this th'�-i day of March, 2017. Notary Public' My commission expires: V� Book 3072 Page 578 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California 1 ) County of On 1 before me, �� �1 a vokv 4IL (_ Da re Insert ame and Title of the Officer personally appeared Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(d) whose name(t) is/are subscribed to the within instrument and acknowledged to me that file/she/th2q executed the same in his/her/th®ir authorized capacity(ies), and that by l� her/their signature(s) an the instrument the person(, or the entity upon behalf of which the person(ST—acted, executed the instrument. CINDA L. MEISTER Notary Public -California z:�ia Santa Clara County n a Commission # 2159861 M Comm. Expires Aug 11. 2020 Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. L Signature j Signature of Not Public - — OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Docu nt Title or Type of Document: _eWCk &U/44, Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): _ ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: ©2016 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 Appendix `B" NOAA Atlas 14, Volume 2, Version 3 Location name: Mills River, North Carolina, USA* A41 Latitude: 35.4165°, Longitude:-82.5516° Elevation: 2114.43 ft * *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.367 0.437 0.523 0.589 0.675 0.740 0.806 0.872 0.958 1.03 5-min (0.330-0.408) (0.394-0.485) (0.471-0.581) (0.529-0.653) (0.602-0.747) (0.656-0.819) (0.712-0.893) (0.764-0.969) (0.829-1.07) (0.880-1.15) 0.586 0.698 0.838 0.942 1.08 1.18 1.28 1.38 1.52 1.62 10-min (0.527-0.651) (0.630-0.775) (0.755-0.931) (0.846-1.04) (0.959-1.19) 1 (1.05-1.30) 1 (1.13-1.42) 1 (1.21-1.54) (1.31-1.69) (1.39-1.82) 0.732 0.878 1.06 1.19 1.36 1.49 1.62 1.74 1.91 2.03 15-min (0.659-0.814) (0.792-0.975) (0.955-1.18) 1 (1.07-1.32) 1 (1.22-1.51) 1 (1.32-1.65) 1 (1.43-1.80) 1 (1.53-1.94) (1.65-2.13) (1.74-2.28) 1.00 1.21 1.51 1.73 2.02 2.25 2.48 2.72 3.03 3.29 30-min (0.904-1.12) 1 (1.09-1.35) 1 (1.36-1.67) 1 (1.80-2.24) (1.99-2.49) (2.19-2.75) (2.38-3.02) (2.63-3.39) (2.82-3.70) 1.25 1.52 1.93 2.25 2.69 3.05 3.42 3.81 4.35 4.80 60-min (1.13-1.39) (1.37-1.69) (1.74-2.15) (2.02-2.49) (2.40-2.98) (2.70-3.37) (3.02-3.79) (3.34-4.23) (3.77-4.87) (4.11-5.39) 1.47 1.78 2.25 2.62 3.14 3.57 4.01 4.49 5.15 5.69 2-hr (1.32-1.63) (1.60-1.97) (2.02-2.49) (2.34-2.90) (2.79-3.48) (3.15-3.95) (3.51-4.45) (3.90-4.99) (4.42-5.75) (4.83-6.40) 1.57 1.89 2.38 2.77 3.35 3.83 4.33 4.89 5.68 6.34 3-hr (1.42-1.76) 1 (1.71-2.11) 1 (2.14-2.64) (2.48-3.08) (2.97-3.72) (3.37-4.25) (3.78-4.82) (4.22-5.45) (4.83-6.38) (5.33-7.16) 1.97 2.35 2.90 3.37 4.05 4.62 5.25 5.93 6.92 7.75 6-hr (1.80-2.17) 1 (2.14-2.58) 1 (2.64-3.18) (3.05-3.70) (3.64-4.44) (4.13-5.08) (4.64-5.78) (5.18-6.54) (5.94-7.67) (6.57-8.65) 2.48 2.96 3.63 4.17 4.92 5.53 6.16 6.82 7.74 8.46 12-hr (2.28-2.71) 1 (2.72-3.23) 1 (3.33-3.96) 1 (4.48-5.37) 1 (5.02-6.04) 1 (5.56-6.74) 1 (6.11-7.49) (6.86-8.56) (7.43-9.43) 2.95 3.54 4.35 5.00 5.89 6.61 7.36 8.13 9.21 10.1 24-hr (2.73-3.20) 1 (3.28-3.84) 1 (4.02-4.71) (4.61-5.41) (5.42-6.37) (6.07-7.15) (6.72-7.94) 1 (7.39-8.78) (8.29-9.96) (8.99-10.9) 3.51 4.18 5.10 5.82 6.82 7.63 8.45 9.31 10.5 11.4 2-day (3.27-3.77) 1 (3.90-4.51) (4.74-5.49) (5.41-6.26) (6.31-7.33) (7.04-8.19) (7.77-9.09) 1 (8.51-10.0) (9.51-11.3) (10.3-12.3) 3.74 4.46 5.39 6.12 7.12 7.91 8.72 9.55 10.7 11.6 3-day (3.49-4.01) 1 (4.16-4.78) (5.02-5.78) (5.70-6.56) (6.61-7.62) (7.32-8.48) (8.04-9.36) 1 (8.76-10.3) (9.72-11.5) (10.5-12.5) 3.98 4.73 5.68 6.42 7.42 8.20 8.99 9.79 10.9 11.7 4-day (3.72-4.25) (4.43-5.06) (5.30-6.06) (5.99-6.86) (6.90-7.92) (7.60-8.76) (8.31-9.62) 1 (9.01-10.5) (9.93-11.7) (10.7-12.6) 4.64 5.51 6.60 7.47 8.65 9.59 10.5 11.5 F 12.8 13.9 7-day (4.35-4.97) (5.16-5.90) (6.18-7.07) (6.98-8.00) (8.06-9.24) (8.91-10.3) 1 (9.76-11.3) 1 (10.6-12.3) (11.7-13.8) (12.6-14.9) 5.32 6.29 7.46 8.38 9.64 10.6 11.6 12.6 F 14.0 15.1 10-day (5.02-5.64) (5.94-6.68) (7.04-7.93) (7.91-8.90) (9.06-10.2) (9.96-11.3) 1 (10.9-12.4) 1 (11.8-13.4) (12.9-14.9) (13.8-16.1) 7.23 8.49 9.87 10.9 12.3 13.3 14.4 15.4 16.6 17.6 20-day (6.84-7.63) 1 (8.05-8.98) 1 (9.34-10.4) (10.3-11.5) (11.6-13.0) (12.6-14.1) 1 (13.5-15.2) 1 (14.4-16.3) (15.5-17.7) (16.4-18.7) 8.86 10.4 11.9 13.0 14.4 15.5 16.5 17.4 F 18.6 19.4 30-day (8.42-9.34) (9.87-10.9) (11.3-12.5) (12.4-13.7) (13.7-15.2) (14.7-16.3) 1 (15.6-17.4) 1 (16.4-18.4) (17.4-19.7) (18.2-20.6) 11.3 13.2 14.8 16.1 17.5 18.6 19.5 20.4 F 21.4 22.1 45-day (10.7-11.8) (12.5-13.8) (14.1-15.6) (15.3-16.9) (16.7-18.4) (17.6-19.5) 1 (18.5-20.5) 1 (19.3-21.4) (20.3-22.5) (20.9-23.3) 13.5 15.8 17.6 18.9 20.5 21.6 22.6 23.5 24.5 25.2 60-day (12.9-14.2) (15.0-16.6) (16.8-18.5) (18.0-19.9) (19.5-21.6) (20.6-22.8) (21.5-23.8) (22.3-24.8) (23.2-25.9) (23.9-26.7) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Pas -based depth -duration -frequency (DDF) curves Latitude: 35.4165°, Longitude: -32.5516' t 20 C a di U 15 4-1 49 10 CL a 5 n t t Jr t L N N O r{4 N rq rq rq N rq N Alb N rV A q O O O Ln O ,1 r-I rn w 1-4N rn v Ln Duration M 25 c s 20 a m a 15 49 a 16 a 5 n 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMT}: Wed Sep 14 12:21:40 2022 Back to Top Maps & aerials Small scale terrain Average recurrence mlerva I f years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — 4-day — 30-min — 7-day — 64-min — 14-day — 2fir — 20-day — 3-fir — 30-0ay — Bfir — 45-day — 12-hr — 60-eay 24-hr ASHFILiE .RCNL AJ.RPO.R dye -13(y Fletcher. S L I Large scale terrain Ki n9spoi t B I Istol Johnson City" Winston -Sales Knoxville MI Mitchell C, A5heAlle NORTH C Charl, Greenville 100km SOUTH CARCI Mi It Large scale map D Ff Ot Gre le u 100km Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer NOAA Atlas 14, Volume 2, Version 3 Location name: Mills River, North Carolina, USA* A41 Latitude: 35.4165°, Longitude:-82.5516° Elevation: 2114.43 ft * *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 5-min 4.40 (3.96-4.90) 11 5.24 (4.73-5.82) 11 6.28 (5.65-6.97) 11 7.07 (6.35-7.84) 11 8.10 (7.22-8.96) 8.88 1 (7.87-9.83) 9.67 1 (8.54-10.7) 10.5 1 (9.17-11.6) 11.5 1 (9.95-12.9) 12.3 1 (10.6-13.8) 3.52 4.19 5.03 5.65 6.46 7.07 7.69 8.29 9.09 9.70 10-min (3.16-3.91) 11 (3.78-4.65) 11 (4.53-5.59) 11 (5.08-6.26) 11 (5.75-7.15) 1 (6.27-7.82) 1 (6.79-8.52) 1 (7.27-9.22) 1 (7.87-10.2) 1 (8.32-10.9) 2.93 3.51 4.24 4.77 5.45 5.97 6.48 6.98 7.63 8.12 15-min (2.64-3.26) 1 1 (4.86-6.04) 1 (5.29-6.60) 1 (5.72-7.18) 1 (6.11-7.75) 1 (6.60-8.53) 1 (6.96-9.13) 2.01 2.42 3.01 3.45 4.04 4.50 4.96 5.43 6.07 6.57 30-min (1.81-2.23) 11 (2.19-2.69) 11 (2.71-3.35) 11 (3.10-3.83) 11 (3.60-4.47) 1 (3.99-4.97) 1 (4.38-5.50) 1 (4.76-6.03) 1 (5.26-6.78) 1 (5.63-7.39) 1.25 1.52 1.93 2.25 2.69 3.05 3.42 3.81 4.35 4.80 60-min (1.13-1.39) (1.37-1.69) (1.74-2.15) 1 (2.40-2.98) 1 (2.70-3.37) 1 (3.02-3.79) 1 (3.34-4.23) 1 (3.77-4.87) 1 (4.11-5.39) 0.734 0.890 1.12 1.31 1.57 1.78 2.01 2.24 2.58 2.85 2-hr (0.658-0.814) (0.800-0.986)1 1 (1.39-1.74) (1.57-1.98) 1 (1.76-2.23) 1 (1.95-2.49) 1 (2.21-2.88) 1 (2.42-3.20) 0.524 0.631 0.791 0.923 1.12 117 1.44 1.63 1.89 2.11 3-hr (0.472-0.585) (0.568-0.703) (0.711-0.879) (0.826-1.03) (0.988-1.24) 1 (1.12-1.42) 1 (1.26-1.61) 1 (1.41-1.82) 1 (1.61-2.13) 1 (1.77-2.38) 0.329 0.392 0.484 0.562 0.676 0.772 F 0.876 F 0.990 1.16 1.29 6-hr (0.301-0.363) (0.358-0.431) (0.441-0.531) (0.510-0.617) (0.608-0.742) (0.689-0.848) (0.774-0.965) (0.865-1.09) (0.992-1.28) (1.10-1.44) 0.206 0.246 0.301 0.346 0.408 0.459 0.511 0.566 0.642 0.702 12-hr (0.190-0.225) (0.226-0.268) (0.277-0.329) (0.317-0.378) (0.372-0.445) (0.417-0.501) (0.462-0.559) (0.507-0.622) (0.569-0.710) (0.617-0.783) 0.123 0.147 0.181 0.208 0.245 0.276 0.307 0.339 0.384 0.419 24-hr (0.114-0.133) (0.137-0.160) (0.168-0.196) (0.192-0.225) (0.226-0.265) (0.253-0.298) (0.280-0.331) (0.308-0.366) (0.345-0.415) (0.374-0.454) 0.073 0.087 0.106 0.121 0.142 0.159 0.176 0.194 0.218 0.238 2-day (0.068-0.079) (0.081-0.094) (0.099-0.114) (0.113-0.130) (0.132-0.153) (0.147-0.171) (0.162-0.189) (0.177-0.209) (0.198-0.236) (0.214-0.257) 0.052 0.062 0.075 0.085 0.099 0.110 0.121 0.133 0.148 0.161 3-day (0.049-0.056) (0.058-0.066) (0.070-0.080) (0.079-0.091) (0.092-0.106) (0.102-0.118) (0.112-0.130) (0.122-0.142) (0.135-0.160) (0.145-0.173) 0.041 0.049 0.059 0.067 0.077 0.085 0.094 0.102 0.113 0.122 4-day (0.039-0.044) (0.046-0.053) (0.055-0.063) (0.062-0.071) (0.072-0.083) (0.079-0.091) (0.087-0.100) (0.094-0.109) (0.103-0.122) (0.111-0.132) 0.028 0.033 0.039 0.044 0.051 0.057 0.063 0.069 0.076 0.083 7-day (0.026-0.030) (0.031-0.035) (0.037-0.042) (0.042-0.048) (0.048-0.055) (0.053-0.061) (0.058-0.067) (0.063-0.073) (0.070-0.082) (0.075-0.089) 0.022 0.026 0.031 0.035 0.040 0.044 0.048 0.053 0.058 0.063 10-day (0.021-0.024) (0.025-0.028) (0.029-0.033) (0.033-0.037) (0.038-0.043) (0.042-0.047) (0.045-0.051) (0.049-0.056) (0.054-0.062) (0.058-0.067) 0.015 0.018 0.021 0.023 0.026 0.028 0.030 0.032 0.035 0.037 20-day (0.014-0.016) (0.017-0.019) (0.019-0.022) (0.022-0.024) (0.024-0.027) (0.026-0.029) (0.028-0.032) (0.030-0.034) (0.032-0.037) (0.034-0.039) 0.012 0.014 0.017 0.018 0.020 0.021 0.023 0.024 0.026 0.027 30-day (0.012-0.013) (0.014-0.015) (0.016-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.023) (0.022-0.024) (0.023-0.026) (0.024-0.027) (0.025-0.029) 0.010 0.012 0.014 0.015 0.016 0.017 0.018 0.019 0.020 0.020 45-day (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.019-0.021) (0.019-0.022) 0.009 0.011 0.012 0.013 0.014 0.015 0.016 0.016 0.017 0.018 60-day (0.009-0.010) (0.010-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.014-0.016) (0.015-0.017) (0.015-0.017) (0.016-0.018) (0.017-0.019) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PD5-based intensity -duration -frequency (IDF) curves Latitude: 35.4165°, Longitude: -32.5516' 1161616I6161 10.000 C 41 1.000 C GJ a-� C � 0.100 L Ld a 0.010 0.001 t t Jr t L N N O r{4 N rq rq rq N rq N Alb A q r, O O O Ln O ,1 r-I rn w � N rn v Ln Duration 100.000 10.000 L k 1.000 w c e 0.100 4.1 49 0.010 0.001 i 1 1 1 1 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMT}: Wed Sep 14 12:22:14 2022 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — 4-day — 30-rnn — 7-day — 64-min — I"ay — 2fir — 20-day — 3-trr — 30-0ay — Bfir — 45-day — 12-hr — 60-eay 24-hr ASHFILiE .RCNL AJ.RPO.R dye -13(y Fletcher. S L I Large scale terrain Ki n9spoi t B I Istol Johnson City" Winston -Sales Knoxville MI Mitchell C, A5heAlle NORTH C Charl, Greenville 100km S 0 LIT H C A R Cl 6 mi Large scale map Kin(j.Fiat D Ff Ot Gre le u 100km M i Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer F THE INT U SGS U.S. DEPARTMENTU.S. GEOLOGICAL GOAL SURV YERIOR science for a changing world -82.6250' 35.5000' 3553000ME 54 55 3929000"N 8 0 28 27 26 25 24 23 22 21 20 19 18 17 16 Ri 4 8 0 A The National Map USTopo Ups 56 57 58 59 60 61 62 aker Cem -7 Ive 74 so�� $ y Ash r G 1 O r II ( Roberlts (� t TN[ W Lake rI� s�P Long Shoals sO Bridge ti\ NG Long �% Shoals t J 191 RD 0 0 R 0 O nnfKFNNA RD rCK LN oP Q i A C 0 s� D� f Asheville \\ Regional © o — �, Airport R FERNCL/F,\ �O Fop si--) 280 74 v Fanning ��, 52 Bridge > I PROJECT SITE ' O ?t Fo 1 t} \ WELEINGTON Y 3 280 W Alt Arden SKYLAND QUADRANGLE NORTH CAROLINA 7.5-MINUTE SERIES 63 Alt PO 'x --HENDERSONCO v , R�.. RD L "eekPo r — S rg :YARD RD -82.5000' 35.5000' v P o v 0 n R 4'j, ' 0 0 ti � �., (y Zj0 m `\"•�QQ,_ � B•rickton f TAP R00T RD 25 oButler or] ' Ige o 74 �� '",k``f kD �o 6" D EHIAWA kSEE W ` Q O \ •� t J _ s Cem g JEFFRE55 RD — i 25 _.... 74 191 ; = NAPLFS 280 3 „— Mills River Bri ge E t' N ESTVI W ,P� Naples �( v _ h { Q U\ t ak Hill Mills Court .. I• f 17 Mer4ional Innis Park .. ti\� � � Lake `� c 21 0 � Y ` QN O ME ISP✓ Bus CLEMENT DR �vQ- ,li` S 25 — �}� O if (� DOD l v' sk)y \CC G O aAKS'DR 2 hgY�00'`..03" 2�eb TOP FAR'N N o R CO RD 1426 m O 0 ,RED s� iver je�Ch . " �o Gov Qua O sbyterian� 191 Irch�Cem Z3� 53 54 55 56 57 58 59 60 61 35.3750° -82.6250° Produced by the United States Geological Survey * SCALE 1:24 000 MN North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 0.5 0 KILOMETERS 1 2 NORTH 1 000-meter grid:Universal Transverse Mercator, Zone 17S G CAROLINA This map is not a legal document. Boundaries may be 6°44' 1000 500 0 METERS 1000 2000 generalized for this map scale. Private lands within government 120 MILS 1 0° 54" 0.5 0 1 reservations may not be shown. Obtain permission before 16 MILS MILES entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION Imagery .....................................................NAIP, June 2016 - November 2016 FEET Roads ......................................... U.S. Census Bureau, 2016 UTM GRIDAND 2019 MAGNETIC NORTH 1 Enka 1 Enka Roads within US Forest Service Lands ........................FSTopo Data DECLINATIONAT CENTER OF SHEET with limited Forest Service updates, 2012 - 2016 CONTOUR INTERVAL 20 FEET 2 3 Asheville AshOteen Names............................................................................GNIS, 1980 - 2019 NORTH AONTOUR VERTICAL DATUM OF 1988 3 Hydrography............................... National Hydrography Dataset, 2003 - 2019 U.S. National Grid 4 5 4 Dunsmore Mountain Contours...........................................National Elevation Dataset, 2008 100,000-m Square ID This map was produced to conform with the 5 Fruitland Boundaries ..............Multiple sources; see metadata file 2017 2018 National Geospatial Program US Topo Product Standard, 2011. 6 Pisgah Forest A metadata file associated with this product is draft version 0.6.18 6 7 8 7 Horse Shoe Wetlands.................FWS National Wetlands Inventory 1984 1986 Lv 8 Hendersonville ADJOINING QUADRANGLES Grid Zone Designation 7S 29 28 27 26 25 24 23 22 21 20 19 18 17 391 6000'"N 62 363 000mE -82.5000° 35.3750' ROAD CLASSIFICATION Expressway e Local Connector Secondary Hwy Local Road v Ramp 4WD — — — N (0 . Interstate Route C3 US Route O State Route N 0) �Y FS Primary Route O FS Passenger FS High Route Clearance Route N �O X Check with local Forest Service unit U) for current travel conditions and restrictions. O (D co U) Z SKYLAND, NC W 2019 z a �Cti TRANSYLVANIA Olh y5� C POLK DATUM INFORMATION The projection used in the preparation of this map was the North Carolina State Plane (FIPSZONE 3200). The horizontal datum was the North American Datum of 1983 GRS80 ellipsoid. Differences in datum ellipsoid, projection,rsal P P ,or Universal Transverse Mercator zones used in the production of FIRMS for adjacent jurisdictions may result in slight positional differences in map features across jurisdictional boundaries. These differences do not affect the accuracy of this FIRM. All coordinates on this map are in U.S. Survey Feel, where 1 U.S. Survey Foot = 1200/3937 Meters. Flood elevations on this map are referenced to the North American Vertical Datum of 1988 (NAVD 88). These flood elevations must be mmpamd to structure and ground elevations referenced to the same vertical datum. An average offset between NAVD 88 and the National Geodetic Vertical Datum of 1929 (NGVD 29) has been computed for each North Carolina county. This offset was then applied P Y to the NGVD 29 flood elevations that were not revised during the creation of this statewide format FIRM. The offsets for each county shown on this FIRM panel are shown in the vertical datum offset table below. Where a county boundary and a flooding source with unnevieed NGVD 29 flood elevations am coincident, an individual offset has been calculated and applied during the creation of this statewide format FIRM. See Section 6.1 of the accompanying Flood Insurance Study report to obtain further information on the conversion of elevations between NAVD 88 and NGVD 29. To obtain current elevation, description, and/or location ildormatioIt for bench marks shown on this map, please contact the North Carolina Geodetic Survey at the address shown below. You may also contact the Information Services Branch of the National Geodetic Survey at (301) 713-3242, or visit its website at htto:/Avww.nos noaa oov County R Avers vertical Datum Offset Table North Carolina Geodetic Survey punry emca Datum se 121 West Jones Street Buncombe -0.16 Raleigh, NC 27601 Henderson -o.1s 919 733-3836 htiD://www.ncas.stale.nc.us Eum le: NAVO BB = NGVO 29 + -0.15 All streams listed in the Flood Hazard Data Table below were studied by detailed methods using field survey. Other flood hazard data shown on this map may have been derived using either a coastal analysis or limited detailed rivenne analysis. Mom information on the flooding sources studied by these analyses is contained in the Flood Insuance Study report. FLOOD HAZARD DATA TABLE FI°°°wa°"r'aho.* IN lot B,I From season ggdn wd1O s'nerg 1 ow 5lu�YreeE)eve wrt(het Naw 80)�O° S rid, ooawm col« Tdo, Fo Mwaywdo CANE CREEK 038 33799 11,940 2,061.0' 1,056/6w 046 4,557 11,940 2,051.0' 976/T14 FRENCH BROAD RIVER 8731 873,100 NA 2.060.0 1,050 6754 875.371 NA ZOGID3 1,700 8766 576,586 NA 2,050.4 1,800' 8823 882.288 NA 2,061.1 1,30) W42 884,189 NA 2,051.5 1,910 HIGGINS BRANCH 003 261 wo 2,065.8 1]/11 We 554 930 2,058.E 15113 oog 911 930 2,069.6 26/34 016 1,811 930 ZGr6o 16116 On 2,262 930 2,085.4 16119 M4 2,437 Sea 2,0879 w/23 o26 2,828 930 2,089,0 61 / 41 KIMSEY CREEK all 1,078 1 1,860 1 2,0e1.s^ 78184 MCDOWELL CREEK 017 1,742 IM 2,060.3' 1w 036 3,854 1 NA 2,0629 200 a_ I' eraS tin Technical State - er This digital Flood Insurance, Rate Map (FIRM) was produced through a unique cooperative partnership between the Stale of North Carolina and the Federal Emergency Agency (FEMA). The State of North Carolina has implemented a long term approach of floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map floodplam areas at the local level. As a part of this effort, the State of Nnrth Camlina hoc ininaA in a Cnnncratinn Tarhniral Plata a,mamant with ::.:: \ FLOODING EFFECTS ow000 _ z R ZONE AEA!! \... ' \ Buncombe CountyFROM HIGGINS BRANCH ZONE X C I1cdd'crsbli County ASR AL Unincorporated Areas w J` .... ' .. - "�• AIRPORT I \ NOGA oEN cis "vR ' ; ; ; ; • • ; ' ; ; ' ' " 'lJ tjicorparated Areas 370031 -+� . : • • • • • : . • • : - Town of FIe1 Gov 60 ..:::: • .:. 1701b •�A o"i,� 1 370568 ZONE X to BN Z .\ LL m r0 ZONE X //��.. . ; O2 GOJ e Fvo City of Asheville o ° m 0 7 2, .,�,ryry6ry ' :... • : .. ; .. •\ \ !r , : �o��G���..:�.. 370032 0 _LID <o �A� F yi ' ' ' ' ' ' . J� J� AVL C Henderson County Z OLD 'ADDING FRIDGE Go ,ao , , 1 0 \• . Unincorporated Areas ZONE AI 0 0 Town itf Fleehel �.: A10121 rP �� I �70568 zs 352a3 J 370125 TRENCHRROAD RIITR� wOrERw " ,0", ZONE X � ZONE AE �. ZONE .:.:. _BUNCOMBE COUNTI'• .... bfcOnwell Creek e HENDERSON CO UNTY g1 ZI) ZONE AE ..::... / .\ .\ /_— �• 60. .:�.......:. mom 20 .: ,(:: ; Town of Mills River w \. pg.;{]„r:I/ i'BROO11 JUL I le HiXxirrt ZONE It ZONE X— ZONE X -ZONE X 11-21'c -ZONE X Town of Pletcher ....... •• I- ... y F I Icndcrson Count} n 2061 370568 `. \ n / ,. -. Unincorporated Areas .. t._,�k N \ ZONE X Net`"` '.:If 370125 ... . . � . \ .... . . 2062 AUTY WAY ADx` ° 22064 R. 061 2063 BROADPo NTE DR r • ' ZONE J(" . � J � . ZONE X 2065 _ City 'ofAA—ill, I Icndcrson County 370032 2066 Unincorporated Areas 370125 \ .::;....: ... • e • 3s. ' ... ............ ..... "( ...1i.i a-o OLD FA"" ND FELDS Rm ,ED Z.. .... (SR 2238) 3wn.oheG, . z ' '3'70508' ' F — N F ZONE AE x i .:::..:::..:...::::..:. Q-c' .:./ 3920 car r� 9 . . � . . . . • ' . . . . . . . . . . . . . . . . . . . . : . . . P. . t . �Fi�O / ��. . . . 5 PROJECT SITE ....... inf • :... ........ • . � � .......... . ....... ................... . ........ ... .. ZONE...... ... .. .............. ... ..... ..... ....:. as2o^'^° \' f ZONE X • . F .. I► //a!S�• Henderson County o $ 9 mFFs :.: • :.: , :. -. , . %�.,1....' •.• Unincorporated Areas e'Ro :.::::.::: , ' :::: �aI1':::: F.. ' . 370125 9 ... ... ,/. .'. WEB PIT SAC' ooa • .�\•\• . • . • ..:.. ' \.. ... . o Y" AD z RRIE LN .. 1 ' .. /-/2/;N('H• Sc ME ' 'X[tOAU.lU4'lif<' (°P •� ZONE BoTLER eBIL- Ro m ..... • ... • ' :.......:...... ' • ZONE AE z 6225002FEET \ \ a 1�� ....... .. .. .... .... .. . a ° ' • TOWII of Mills'IiiVer' w3 Q ° 370025... .::\:: .. LN TR �\ ..... • • : �\ z4 3r O ® :..:: PROOT DAIRY RD OREN :9unBESE14D ERd DG4659 <—RACHELE on ELEMENTARY SCHOOL GLE"coo Iuw rsR leas)• 'TOWN OF MILLS RIVER; ; 2061 tCEpeeto5eao Tm K � —ENATs LN Fox HILL Ro • .. ..... - • HENDERSON COUNT.Y::.: ZONE X �4 n wa -......\ Town of Mills River 370025 :::::.: :::: :: I lenderson Couch tlnincorpo, led Arers..:.... . o wew off • • • : ,.. M ZONE AE " " " " . " " ' I ZONE X 3919a^m 2062 H w .... yea — l=lflL\'fill RR(IAN IUr'/:R ...... ........... 620000 FEET • 620000 FEET 940000 FEET 359 °'°" 94a 500 FEET 0230231 350�'" JOINS PANEL 9641 02320 361 950000 FEET 82-33 30 NOTES TO USERS This map is for use in administering the National Flood Insumnce Program. It does not necessarily Certain areas not in Special Flood Hazard Areas may be protected by flood control structures, This map reflects more detailed and up-to-date stream channel conflgumdpns than those shown MAP REPOSITORY identify all areas subject to flooding, particularly from local drainage sources of small size. The Refer to Section 4.4 'Flood Protection Measures" of the Flood Insurance Study report for on the previous FIRM for this jurisdiction. The floodplains and floodways that were transferred fron community map repository should be consulted for possible updated or additional flood hazard information on the flood control structures in this jurisdiction. the previous FIRM may have been adjusted to conform to these nee stream channel Refer to listing of Map Repositories on Map Indexor NSlt Fro://vnvw.ncgoodmaos.com. information configurations. As a result the Flood Profiles and Floodway Data tables in the Flood Insurance EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL Base map information and geospal al data used to develop this FIRM were obtained from various Study report (which contains authoritative hydraulic data) may reflect stream channel distances that To obtain more detailed information in areas where Base Flood Elevations (BEES) and/or organizations, including the participating local cemmuntyfss) state and federal agencies and/or differ from what's shown on this map OCTOBER Z 2008 floodways have been determined, ueers are encouraged to consult the Flood Profiles Floodway, other sources. The primary base for this FIRM is aerial imagery acquired by Buncombe County Data, Lrm tied Detailed Flood Hazard Data and/or Summary of Stillwater Elevations tables and Henderson County. The time period of collection for the Henderson imagery is 2001. The [ me Please refer to the separately printed Map Index for an overview map of the county showing the EFFECTIVE DATE(S) OF REVISION(S) TO THIS PANEL contained wnthin the Flood Insurance Study (FIS) report that accompanies this FIRM. Users should period of collection for the Buncombe Imagery Is 2002. Information and geospatial data supplied layout of map panels, community map repository addresses, and a Listing of Communities table be aware that BEES shown on the FIRM represent rounded whole -foot elevations. These BEES are by the local community(ies) that mat FEMA base map specifications were considered the preferred containing National Flood Insurance Program dates for each community as well as a listing of the JANUARY 6, 20101 intended for flood insurance rating purposes only and should not be used as the sole source of source for development of the base map. See geospatial metadata for the associated digital FIRM panels on which each community is located. flood elevation information. Accordingly, flood elevation data presented in the FIS report should be for additional information about base map preparation, utilized in conjunction with the FIRM for purposes of construction and/orfloodplain management. If you have questions about this map, or questions concerning the National Flood Insurance 'Updated flood hazards to reflect seamless statewide mapping Base map features shown on this map, such as corporate limits, are based on the most up -to- Program in general, please call 1-877-FEMA MAP (1-877-336-2627) or visit the FEMA website at Boundaries of regulatory floodways shown on the FIRM for flooding sources studied by detailed sate data available at the time of publication. Changes in the corporate limits may have htto:/Avvmtfema.aov. For community map reHsion history prior to statewide mapping, refer to the Community Map History rred since this ma w published. Ma users should consult the appropriate communi table loceletl in the Flood Insurance Stud report for this jurisdiction. methods were computed al Ross sections and interpolated between cross sections. The floodways occu f was p secascommunity Y P I vnve haseA on hvtlmulir. rnnsitleratinna with renarA fin rmrnranenL[ M the Netinnal FInnA official R website to veri current conditions d luristlictional boundaries and base map features. An accomoanvino Flood Insurance Study report. Letter of Mao Revision (LOMR1 or Letter of Mao that has a 1% cM1ance of being Vequaletl Vor exceeded~in any given �yo., The Special Flood Hazard Area is R. area subject to flooding by the 1% annual chance food. Areas of Special Flood Hazard 'include Zones A, AE, All, AO, AR, A99, V, and VE. The Base Flood Elevation is the water-surtace elevation of the 1 %annual chance good. ZONE A No Base Flood Elevations determined. ZONE AE Base Flood Elevations determined. ZONE AN Flood depths of 1 to 3 feel (usually areas of pondng) Base Flood Elmat ons determined ZONE AO Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain) rage depths determined. For areas of alluvial fan flooding, velocities also del mined. ZONE AR Special Flood Hazard Area formerly protected from the 1% annual chance flood by a flood control system that was subsequently cis rifled, Zone AR indicates that the former flood control system is bang restored to provde protection from the 1% annual chance or greater flood. ZONE A99 Area to be protected from 1% annual chance flood by a Federal flood protector, system under construction no Base Flood Elevations determined. ZONE VE Coastal flood zone with velocity hazard (wave action); Base Flood Elevations determined. FLOODWAY AREAS IN ZONE AE The floodways the channel of a stream plus any adjacent floodpla n areas that must be kept free of encroachment so that the 1% annual chance flood can be tarred without substantial increases in flood heights. OTHER FLOOD AREAS ZONE X Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood. OTHER AREAS ZONEX Areas determined to be outside the 0.2% annual chance 11m,plain. ZONE D Areas in which flood hazards are undetermined, but possible. ® COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS OTHERWISE PROTECTED AREAS (OPAs) CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas. 1%annual chance floodpla n boundary 0.2% annual chance floodplain boundary — FlootlY wa bounda ry — Zone D boundary • CBRS andORA boundary Boundary d Brig Specal Flood:,,,,f Zones endboundary d E' g Bp Flood Hazard Areas oft Zone, Bese Flood EI valor., hood depths orr.,x veloc tiila. 'w 513 ^^- Bese Flood Elevation line end value; elevation in Bier (EL 987) Base Flood on value where uniform wilhin zone, elevation in star 'Referenced to the North American Vertical Datum of 1988 Crass section line o--__--2� Trum- line l�•30 32.2 Geogrephcwordmiatrefnercedtothe North American Datum of 1983 (NAD 83 4276°°°a 1000mater Unver.al Transverse Mercator end ticks zone 17 1477500 FEET 2500foot grid veto.. North Carolina State Plane coordinate sv slam FIPSZONE 3200 State Plana NAD 83 feel BM5510 Nath Carol na GeodNCSurveybench mark(for morenformation x Vsg Mtn lNnvw ncos state nc us) BM5510 National Geodetic Survey bench mark(for, morenformaton cost ® M1Mo.//wiw.noa noaa cowl BM5510 NGS 58 GPS 2 5 cm Vii Control Marks Or Contractor Establ shed ® NCFMP Bench Marks (for more information visit hflo://wvm•.ncas.slate.nc.usl •M1.5 River Mile GRID NORTH MAP SCALE 1•' = 500' (1 : 6,000) 250 0 Soo 1000 EET METERS 150 0 150 300 =1RM LOOD INSURANCE RATE MAP JORTH CAROLINA IANEL 9642 LEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM NNEL LAYOUT) )MAINS: )MMUNITY CID No. PANEL SUFFIX ETCHER, TOWN OF NOERSONCO UNITY 370125 ed. K IS RIVER, TOWN OF 37m25 8642 K tio: to User The Map Number sbovm be—IT1uld be used to plating map orders the Community Number shown w should be used on insurance 1POI. lions roil he s ubjed ,munity. AP REVISED MAP NUMBER 4NUARY 6, 2010 3700964200K (4 d� 1*Rt; 358820 35o 255" N 35o 24'49"N 358820 358880 358940 359000 Map Scale: 1:2,360 if printed on A portrait (8.5" x 11") sheet. Meters N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Soil Map —Henderson County, North Carolina (Soils) 358880 358940 359000 359060 359120 359060 359120 359180 35o 255" N I 1 35o 24' 49" N m 9/30/2022 Page 1 of 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons ,N Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit �i Gravelly Spot 0 Landfill A. Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip o Sodic Spot Soil Map —Henderson County, North Carolina (Soils) MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:20,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil 4� Other line placement. The maps do not show the small areas of Special Line Features contrasting soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation Rails Source of Map: Natural Resources Conservation Service Web Soil Survey URL: . 0 Interstate Highways Coordinate System: Web Mercator (EPSG:3857) US Routes Maps from the Web Soil Survey are based on the Web Mercator Major Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Local Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Background Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Henderson County, North Carolina Survey Area Data: Version 22, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 1, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 9/30/2022 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Henderson County, North Carolina Soils Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Co Codorus loam (arkaqua) 0.3 2.0% DeB Delanco (dillard) loam, 2 to 7 percent slopes 0.6 3.4% HyC Hayesville loam, 7 to 15 percent slopes 10.2 61.7% HyE Hayesville loam, 15 to 25 percent slopes 5.3 32.4% TeC Tate fine sandy loam, 7 to 15 percent slopes 0.1 0.4% Totals for Area of Interest 16.6 100.0% USDA Natural Resources Web Soil Survey 9/30/2022 Conservation Service National Cooperative Soil Survey Page 3 of 3 358820 35o 255" N 35o 24'49"N 358820 358880 358940 359000 Map Scale: 1:2,360 if printed on A portrait (8.5" x 11") sheet. Meters N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Henderson County, North Carolina (Soils) 358880 358940 359000 359060 359120 359060 359120 359180 35o 255" N I 1 35o 24' 49" N m 9/30/2022 Pagel of 4 Hydrologic Soil Group —Henderson County, North Carolina (Soils) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Henderson County, North Carolina Survey Area Data: Version 22, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 1, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 9/30/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Henderson County, North Carolina Soils Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Co Codorus loam (arkaqua) B/D 0.3 2.0% DeB Delanco (dillard) loam, 2 to 7 percent slopes C 0.6 3.4% HyC Hayesville loam, 7 to 15 percent slopes C 10.2 61.7% HyE Hayesville loam, 15 to 25 percent slopes C 5.3 32.4% TeC Tate fine sandy loam, 7 to 15 percent slopes B 0.1 0.4% Totals for Area of Interest 16.6 100.0% USDA Natural Resources Web Soil Survey 9/30/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Henderson County, North Carolina Soils Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 9/30/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 358820 35o 255" N 35o 24'49"N 358820 358880 358940 359000 Map Scale: 1:2,360 if printed on A portrait (8.5" x 11") sheet. Meters N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Depth to Water Table —Henderson County, North Carolina (Soils) 358880 358940 359000 359060 359120 359060 359120 359180 35o 255" N I 1 35o 24' 49" N m 12/13/2022 Page 1 of 3 Depth to Water Table —Henderson County, North Carolina (Soils) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons W 0-25 25-50 0 50 - 100 0 100 - 150 0 150 - 200 0 > 200 0 Not rated or not available Soil Rating Lines ,.y r 0 - 25 f 25-50 50 - 100 100 - 150 150 - 200 ~ > 200 r 0 Not rated or not available Soil Rating Points 0-25 25-50 ❑ 50 - 100 ❑ 100 - 150 ❑ 150 - 200 > 200 ❑ Not rated or not available Water Features Streams and Canals Transportation Rails .,_. Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Henderson County, North Carolina Survey Area Data: Version 23, Sep 8, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 1, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 2 of 3 Depth to Water Table —Henderson County, North Carolina Soils Depth to Water Table Map unit symbol Map unit name Rating (centimeters) Acres in AOI Percent of AOI Co Codorus loam (arkaqua) 54 0.3 2.0% DeB Delanco (dillard) loam, 2 to 7 percent slopes 91 0.6 3.4% HyC Hayesville loam, 7 to 15 percent slopes >200 10.2 61.7% HyE Hayesville loam, 15 to 25 percent slopes >200 5.3 32.4% TeC Tate fine sandy loam, 7 to 15 percent slopes >200 0.1 0.4% Totals for Area of Interest 16.6 100.0% Description "Water table" refers to a saturated zone in the soil. It occurs during specified months. Estimates of the upper limit are based mainly on observations of the water table at selected sites and on evidence of a saturated zone, namely grayish colors (redoximorphic features) in the soil. A saturated zone that lasts for less than a month is not considered a water table. This attribute is actually recorded as three separate values in the database. A low value and a high value indicate the range of this attribute for the soil component. A "representative" value indicates the expected value of this attribute for the component. For this soil property, only the representative value is used. Rating Options Units of Measure: centimeters Aggregation Method: Dominant Component Component Percent Cutoff. None Specified Tie -break Rule: Lower Interpret Nulls as Zero: No Beginning Month: January Ending Month: December USDA Natural Resources Web Soil Survey 12/13/2022 Conservation Service National Cooperative Soil Survey Page 3 of 3 ECS SOUTHEAST, LLP Setting the Standard for Service" w Geoteehnical • Construction Materials • Environmental • Facilities N` Registered EGeolo pits Firm F -405 NC Registered Geologists Firm C-406 SC Registered Engineering Firm 3239 December 14, 2022 Mr. Mark Brooks Brooks Engineering 17 Arlington St Asheville, NC 28801 Reference: James River Equipment Infiltration Testing Fanning Field Road Mills River, North Carolina 28759 ECS Project No. 31-3593-A Mr. Brooks: As authorized by your acceptance of ECS Proposal No. 31-7351-P, dated December 1, 2022, ECS Southeast, LLP (ECS) has completed our infiltration testing supplemental subsurface exploration for the proposed stormwater control measures (SCM) of the James River Equipment project in Mills River, North Carolina, as depicted on the attached Site Location Diagram. PROJECT UNDERSTANDING Our understanding of the project is based on recent correspondence between Mark Brooks and ECS' Matthew Fogleman, P.E., as well as the provided James River Equipment Grading & Stormwater Plan, sheet C-5.0, prepared by Brooks Engineering Associates, dated October 28, 2022. We understand that the SCMs at the proposed James River Equipment site will consist of two bioretention ponds. You have requested that we assess the potential for a seasonal high water table (SHWT) within two feet of the bottom of the systems, estimated to be an approximate elevation of 2090.0 feet at the northern pond (SCM-A) and an approximate elevation of 2088.0 feet at the southern pond (SCM-B). The location of the SCMs were indicated on the provided plan. SUBSURFACE EXPLORATION The infiltration testing was performed using a CCHP testing apparatus. The hand auger was conducted in general conformance with ASTM D1452. The infiltration testing recorded the following measurements: Location Test Depth BGS B-1 (SCM-B) Depth 6.25 feet B-2 (SCM-A) Depth 2.5 feet Approx Test Elev Ksat 2086 feet 0.25 in/hr 2087 feet 0.06 in/hr Groundwater was not encountered in the hand auger borings at the time of our exploration. Also, we did not observe evidence of a SHWT above an elevation of 2086 feet. It appears that the SHWT in these areas of the site is below an elevation of 2086 feet. 1900 Hendersonville Road, Suite 10, Asheville, NC 28803 • T: 828.665.2307 • F: 828.665.8128 • ecslimited.com ECS Capitol Services, PLLC • ECS Florida, LLC • ECS Mid -Atlantic, LLC • ECS Midwest, LLC • ECS Southeast, LLP • ECS Southwest, LLP James River Equipment Infiltration Testing December 14, 2022 ECS Project No. 31-3593 A CLOSING Page 2 ECS has prepared this letter report to evaluate the infiltration rate of the soil near the bottom of the planned SCMs and to help identify the possible presence of a seasonal high water table. Our understanding of the project and proposed construction is based on information provided to ECS by the Owner and project design team. If any of this information is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted immediately so that we can review the report in light of the changes and provide additional or alternate recommendations, as required, to reflect the proposed construction. We appreciate the opportunity to be of continued service to you and your project team. If you have any questions concerning the information provided in this letter, please do not hesitate to contact us. Respectfully submitted, ECS SOUTHEAST, LLP Nicole Pearlman, E.I. Geotechnical Professional NPearlman@ecslimited.com Attachments: Site Location Diagram Exploration Location Diagram Matthew Fogleman, P.E. Asheville Branch Manager, Principal MFogleman@ecslimited.com -2- Service Layer Credits: Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, N s w E - o F - g Kunz Park 1 ' 1 1 Oua1M1`I� �0 �a z oc o� r 2B0 f T d 3 T � c = d o o y�a`e C,r 2181 eoi rn .bye a � boo 5 Count,L" -IS *\oc� 00` b®P�Fo m O` o �0 27s6 h K F I:,B.• . 'Ln �'- kbridge Rd o 0 1,000 m 2,000 .„ nt Feet Site Location DiagramRP cN 11N INFILTRATION TESTING SCALE AS NOTED PROJECT NO. 31:3593-A FANNING FIELD ROAD, MILLS RIVER, NC SHEET 1 Nor—JAMES RIVER EQUIPMENT DATE 12/12/2022 EXIST. BOUNDARY EXIST. ADJOINER 1 1\VI EXIST. STREAM j /,\\f ,/ / 1/ 1I EXIST. STREAM BUFFER EXIST WETLAND lEl FERIA NON -ENCROACHMENT S� III (// 1 I II\ IV, \ 1 J 1' I FEMA FLOOD HAZARD AREA (1R) FEMA FLOOD HAZARD AREA (C-) - - - =EXIST. RIGHT OF WAY EXIST. EASEMENT - - -EXISL BUILDING SETBACK J E------JEXISn NC BUILDING f �EXISIING SIDEWALK EXISTING PAVEMENT -E-ST- EXIST. STORM GRAN EXIST. MINOR CONTOUR EXIST. MAJOR CONTOUR MEW BUILDING —NEW PAVEMENT NEW CONCRETE SIDEWALK ® NEW GRAVEL \ \ I NEW CURB h GUiIER \II m NEW JINCIION BO% ®I ROOK PIPE INLET i A "a'r mea mw. y® NEW OUTLET PRCTECTON 1C11 MEW YARD INLET SSpTTp �—(yy]i] NEW STORM PIPE CIIAOOODW'RIF RAP LINED DITCH 11 NEW MINOR CONTOUR NEW MAJOR CONTOUR NEW SPOT GRADE it l- I/ 1 , II rn - - - NMIIS OF DISTURBANCE I II N W E ! +\ O I ! a0 t0 i 1 sr.ILc•1"= 60 DEVELOPMENT DATA PROPERTYADDRESS. N Nc F ELOs RonD I I \ PNNU293 MB NORTH CARCLINA TOw 16.01 AC. ZON NGR N OFMINcL9 RIVER DE0 MRrmv RREVIEW, ZONING CLASSIFICATCN MRNU PD PROBEDNUMIBE OFUNTS - I ! PROPERTYMNDRR JREASHEVILLE.LLC AODRIS B-1 VA 33005 EOUIPMENT.COM IONE ER III O YE�RESS , O E D6ETlERROAD Not to Scale \ \ ,; 1II ASHLANO. VA R30L 1p181 11\ FNG' Image adapted from McGill Associates Schematic Site Plan (Sheet SK-1) Dated October 2017 ot \ I B-2 \ t 1 x \ 1 % s 1 I � P, I = 1.2 ` 2110M�D r s1 1-1-111c"RA-11 11.1211 1e 1 aN.BBDRw \ 4019 IF 'OND El: DPDSED ]A ELV:2i0BB.00' REQUIRED SED .2 FT ROB6.0U) 'fltfa._6 1 1 In F.\ LTUT \ 1 fR.Ts 2."2„DC»2 MDFP�DEtiX MD.M2,AELY2DBB�D , .. "- -ZING GROurvD ELv 2D9x se , P2FT u i p (zoas.BD) _ mNLTRAnw HATE RATE 0\1\ FROPoBED BOTTOM OF RELY, ELV 23090.00' EpumEDSEF_'GN zLFT (zcee oD7 INFILTRATION RATE BOH-A BORTRG z2 PRO PoSEDBOTTOMOF INDB.V:2093.0U RWPoS®BOTTOM OFMEDIAELV NI90.00' REQUIRED SEPARATION:3FT (3OBB.00'] EXPLORATION LOCATION DIAGRAM LEGEND Infiltration Testing ❑ Approximate Hand Auger Location James River Equipment Mills River, Henderson County, North Carolina ECS Project No. 31-3593-A Appendix "C" JAMES RIVER EXISTING �0 �� 1,I ,1 l /1 111,I , I 1 11I11 I 1'I I II1 IIIt l,II 'III II 1I'I IIII 1III V�'a-9o"Pv�o`a,n�3o�"` `�♦ \\ l\�wl r\`—,\\ �� \ff III n � "I I-E-,f"EEI. S ,E \CONDITIONS /I (Dn1'e DRAINAGE AREA MAP `\\ O\ I\°✓i ra jt 1/ ,1///�,/%i , / III 1 t 1 I ' 1 i i l I 11 1 I\ "" °aS� \ \� `\\\ =r,= `` 1 f \ I I �♦\ \ \\\ a `� 11 o �� I pp I YY \ �, � \\ \ Q — � I1 t ' I 1 I I ` t 1 t \ ' t , `♦`,1 ! �`\ I \'- ' i /` ' - t 1 I t I :fit I / I ' \ \ I I 1 I 1 1 1 \ \ \ 1 \ ( t \ \� `� . �1• � , \ `, 1 l l\ f1r 11/f I 93r"' l I O I p I \ \ \ \ \ \ \ \ \ \\ \ 1 1\ \ I > \ \ \ \ \ \ \ 11 _ • \ III1 Eo'Md� ul, 0 1 \ t 1 I I l 1 / / 1 ! I 1 1 / ' ' . / I I I I 1 I I I I / / r �-� ^ \ - _- = �=_ - _ , \ � I \ ,\ . I /♦ , t \` \\ � I j �i I 1 I ♦ � �� i' ii' ��-_ / I ' l I / / , / l / / - y Q,�'^_...�-- _��_' i�-\\\\ \ \ \l \l\\ I I it 1 1 / //r r,ii �� '� 1, l / / / / ,- `. \I \ \ 1 1�/ \ ♦ \ Tj it \\0 \)Us,5TATE OF NORTH IINA ° Eo"E°M°M° / fl ,/ 111 / / / / ,'^`♦ \ \ ` �-� / I I ' , ' 1 I / r' 1 �` \ , \ ` \ \\\ \ t `)\ \ � I", ' 1 \ ` � I 1 /-' \ I 1 I'll I'I I t 1 t \ \ \ , \ ♦ , 1 I , , / / 1 ` __` __ "�\ \ \\ ,1 l l/i 1 I It ),I' 1, 1, \ \ , \ ` \ �i_- ` - I 1 I / ! -�'�•, \ \\ t ' I t 11l % 111 11 t, -- / --- , \ / / ,III\I' I11\ \`\�,`♦ `\ 1 \ �` - �_ r /( , , r / / ,' \ - \ �`\ , i, I, I,I, 111 ... ♦ � I / t 1 I 0 1 � \�J ,/ / 111 1\\t \ ♦\` �♦\ \ \ \ 1 - _- / 1 / l / r- \ < t I III t � 1`- `, \♦ � / / I ` VVV / 1 t I I t\\\`\ ♦.- ` `\\ `` \ \\ t _---- --' I 1/ / j 1 f \ 1 ! I j, 1 I I I j J ' %� /-.` t,/ I I °iq�El, I' \/ I' 1 1 / / / / ' ) l I t 1 / I / 1 ° sfE(JEI I I t t II 1 / 1 1 / I I - / 11 I'd - j!0`\�8� I // / / / / / % % % ' / l I - i /� I J / / ^\\ .-\ .` / l I Fo"EE�jlE,�t\\ 1j1 '- `\ `♦� mil``', �I I I I l r I I / I / / / / ' / / I t -_' / I I t ' / . _ / 1 1 / 1 I I \ \ ,1 II '� \,� ..1 tit\ 11I I I , / / ' / j ' '-.\♦ I ��` \ I I / t I I ``,\`\ il,.� ' / 1 ♦ < '! 11 r\ t \ \ ` �\ \ 1 ( l /r-- � / I f � �, � �� � \\1 I\ � l l r 1 ___- --ii j�1 Op An it `^. �' / 1 , / 1, ,/// /, , / / , I I / / / , / _ t 1 I 1 \\`♦ \ `��\ta,� �,� / / SHAY POINT ti = EX AREAE61,418 SF I I 1 / / / / / / �.Eo I 1 It / / / , / IIPERVIOUS`7.374 SF / TC:8.9 WIN s4E ° Taaa„ EEC E 1/-NE i''r i ♦�� ,A A V A V A � __� � v ,o"ED"a"1 D B 7' 11 t4,14 Eo.`95" - - - - - - ♦ , �/ 1 1 I I I l / / I I ! \` - ``� ame '�,,\,C"4\\.` 1 \ \ \ , \ \ \` \ \ - -\___ _ / / / / / / / l l / / / ' % / i �.' l/J/ //, / t r � I / `-` / � ' �-� 1 I I I 1 1 l l l I 1 1 �---` `-`��'`\ `\,\\ `�♦`\ `,` \ \\ \ \\ ` ` `,\`, ``-- \ �_-� ` / ! / / // / I , , / / / 1 \ / � /!, /, // r � /- l \ �/ / r �♦♦ \ 11,,, % ----�-/ I 1 I I I I , I ' I l I , l \� �,`, \\ \\ \\\\`\ \ \\`\ ` 1 � \ \ \ I j / j I 1 1 I I I 1 ♦ ! '� / i%//i', � - /err � , \ \\ 1'l, f //---♦ -\ / I I � I I , I I I 1 I I I I .�^ \ \ \ \ \ `\ \ \\\ \ \ \ \ \\ ` E \ \` \ \ -♦ 1 I t / / I l 1 / I 1 I I I I I \ �--- � �' �'- / //' / "/�� . ♦ `� � � �i II \ ,� / I � � i i i I I I I � / �_ \\\ \ \\ \\\� \.\\ \ \ \ -`\. \. 1 I f / / � f f i r 1 1 I i � _ r -l: /j! ,� ,/�j/� . ..boo IN I � � " � �`•1 i1'r'"IA i \ 111'"E�� •N�t',aI',�'O'I ,!I'oA�l yY .•Y i .•Y yrY yY yf �Y L•[ 7Y L, L2 �•Y •[ •Y iuY.w[ yY iGY.�•1 �, I„f�� �I��• s��I �� � Y !•Y ,� qY iNY �mY - �, Lr III r�L: ►Y L, D�••� � y�2�i+Y�i•, LY , ��� 1 � f,�N Ay1►�I,„1 �FI� � iY i ,yY L .Y L ,•Y yY i�Y •Y •[ • � i�7 . •Y r♦Y �iY 7Y i•L •Y yY �siY ��� r s GY r !Y Gi 1•Z •Y -•Y • s�; r N� COL � Y •Y it •Y �Y •Y — s� ;ef.�iif yY.��. yY ;�S �►` r�I f�LY L; yY Q y, it:• OWES, 1 � �i�Y•.yY- e. ;� ^ti=1y=1I �Y LY �. V _ Ov IINN � I I � I SF 0 eTs I I o (r I I `� v �� v`v 1 I I1111V � I Appendix "D" 1S SS 3S 4S DA-EX DA TO SCM-A DA TO CM-B B PASS 7P 5P SCM-A SC -B 7L DA-PR Subcat Reach on Link Routing Diagram for HydroCAD-Update Prepared by {enter your company name here}, Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Appendix "E" HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 6 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA-EX Runoff Area=661,415 sf 1.11% Impervious Runoff Depth=0.69" Tc=8.9 min CN=70 Runoff=15.53 cfs 37,848 cf Subcatchment 2S: DA TO SCM-A Runoff Area=225,834 sf 75.28% Impervious Runoff Depth=2.02" Tc=5.0 min CN=91 Runoff=18.68 cfs 38,103 cf Subcatchment 3S: DA TO SCM-B Runoff Area=284,847 sf 70.45% Impervious Runoff Depth=1.94" Tc=5.0 min CN=90 Runoff=22.76 cfs 46,009 cf Pond 4P: SCM-A Peak EIev=2,094.14' Storage=20,597 cf Inflow=18.68 cfs 38,103 cf Outflow=1.14 cfs 38,103 cf Pond 5P: SCM-B Peak EIev=2,092.60' Storage=18,853 cf Inflow=22.76 cfs 46,009 cf Outflow=8.90 cfs 46,009 cf Subcatchment 6S: BYPASS Runoff Area=161,407 sf 0.00% Impervious Runoff Depth=0.69" Tc=7.5 min CN=70 Runoff=4.03 cfs 9,236 cf Link 7L: DA-PR Inflow=12.55 cfs 93,348 cf Primary=12.55 cfs 93,348 cf Total Runoff Area = 1,333,503 sf Runoff Volume = 131,196 cf Average Runoff Depth = 1.18" 71.65% Pervious = 955,459 sf 28.35% Impervious = 378,044 sf HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: DA-EX Runoff = 15.53 cfs @ 12.02 hrs, Volume= 37,848 cf, Depth= 0.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-YR Rainfall=2.95" Area (sf) CN Description 7,374 98 Paved parking, HSG C 654,041 70 Brush, Fair, HSG C 661,415 70 Weighted Average 654,041 98.89% Pervious Area 7,374 1.11 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 Direct Entry, Subcatchment 1S: DA-EX Hydrograph 7 6 15.53 cfs 5 - r 4 - V' 3 2 notT Arez=165 I , 1 — 0 9 — 8 Tc 8. m n 7 _ 6 5 4 3 2 1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 2S: DA TO SCM-A Runoff = 18.68 cfs @ 11.96 hrs, Volume= 38,103 cf, Depth= 2.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-YR Rainfall=2.95" Area (sf) CN Description 170,002 98 Paved parking, HSG C 55,832 70 Brush, Fair, HSG C 225,834 91 Weighted Average 55,832 24.72% Pervious Area 170,002 75.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, N 3 0 LL Subcatchment 2S: DA TO SCM-A Hydrograph 20 19 8.68 cfs 18 — r 17 M i I I F I I 1 ®t�ep= 1615 14 131211n 10 9 8 7 6 5 4 3 2 1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 3S: DA TO SCM-B Runoff = 22.76 cfs @ 11.96 hrs, Volume= 46,009 cf, Depth= 1.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-YR Rainfall=2.95" Area (sf) CN Description 200,668 98 Paved parking, HSG C 84,179 70 Brush, Fair, HSG C 284,847 90 Weighted Average 84,179 29.55% Pervious Area 200,668 70.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: DA TO SCM-B Hydrograph ❑ Runoff Time (hours) HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 10 Summary for Pond 4P: SCM-A Inflow Area = 225,834 sf, 75.28% Impervious, Inflow Depth = 2.02" for 1-YR event Inflow = 18.68 cfs @ 11.96 hrs, Volume= 38,103 cf Outflow = 1.14 cfs @ 12.66 hrs, Volume= 38,103 cf, Atten= 94%, Lag= 41.9 min Primary = 1.14 cfs @ 12.66 hrs, Volume= 38,103 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,094.14' @ 12.66 hrs Surf.Area= 18,990 sf Storage= 20,597 cf Plug -Flow detention time= 623.8 min calculated for 38,103 cf (100% of inflow) Center -of -Mass det. time= 623.8 min ( 1,425.3 - 801.5 ) Volume Invert # 1 2,093.00' UV01 Description 58,835 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,093.00 17,161 0 0 2,094.00 18,758 17,960 17,960 2,095.00 20,421 19,590 37,549 2,096.00 22,151 21,286 58,835 Device Routing Invert Outlet Devices #1 Primary 2,089.50' 24.0" Round Culvert L= 104.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,089.50' / 2,076.00' S= 0.1298 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,091.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,093.00' 1.000 in/hr Exfiltration over Surface area from 2,090.00' - 2,093.00' Excluded Surface area = 0 sf #4 Primary 2,094.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=1.14 cfs @ 12.66 hrs HW=2,094.14' (Free Discharge) 1=Culvert (Passes 0.26 cfs of 25.46 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.26 cfs @ 7.67 fps) L3=Exfiltration (Passes 0.26 cfs of 0.40 cfs potential flow) 4=Broad-Crested Rectangular Weir (Weir Controls 0.88 cfs @ 1.05 fps) HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 11 N U Pond 4P: SCM-A Hyd rog raph Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 12 Summary for Pond 5P: SCM-B Inflow Area = 284,847 sf, 70.45% Impervious, Inflow Depth = 1.94" for 1-YR event Inflow = 22.76 cfs @ 11.96 hrs, Volume= 46,009 cf Outflow = 8.90 cfs @ 12.06 hrs, Volume= 46,009 cf, Atten= 61 %, Lag= 5.9 min Primary = 8.90 cfs @ 12.06 hrs, Volume= 46,009 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,092.60' @ 12.06 hrs Surf.Area= 12,873 sf Storage= 18,853 cf Plug -Flow detention time= 290.8 min calculated for 46,006 cf (100% of inflow) Center -of -Mass det. time= 290.8 min ( 1,096.9 - 806.1 ) Volume Invert # 1 2, 091.00' UV01 Description 38,255 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,091.00 10,684 0 0 2,092.00 12,024 11,354 11,354 2,093.00 13,433 12,729 24,083 2,094.00 14,912 14,173 38,255 Device Routing Invert Outlet Devices #1 Primary 2,087.50' 24.0" Round Culvert L= 70.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,087.50' / 2,078.00' S= 0.1357 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,089.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,091.00' 1.000 in/hr Exfiltration over Surface area from 2,088.00' - 2,091.00' Excluded Surface area = 0 sf #4 Primary 2,092.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=8.89 cfs @ 12.06 hrs HW=2,092.60' (Free Discharge) 1=Culvert (Passes 0.25 cfs of 27.03 cfs potential flow) L2=Orifice/Grate (Passes 0.25 cfs of 0.28 cfs potential flow) L3=Exfiltration (Exfiltration Controls 0.25 cfs) 4=Broad-Crested Rectangular Weir (Weir Controls 8.64 cfs @ 2.39 fps) HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 13 N U Pond 5P: SCM-B Hyd rog raph Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 6S: BYPASS Runoff = 4.03 cfs @ 12.00 hrs, Volume= 9,236 cf, Depth= 0.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 1-YR Rainfall=2.95" Area (so CN Description 161,407 70 Brush, Fair, HSG C 161,407 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Subcatchment 6S: BYPASS Hydrograph ❑ Runoff 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) HydroCAD-Update Type 11 24-hr 1-YR Rainfall=2.95" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 15 Summary for Link 7L: DA-PR Inflow Area = 672,088 sf, 55.15% Impervious, Inflow Depth = 1.67" for 1-YR event Inflow = 12.55 cfs @ 12.04 hrs, Volume= 93,348 cf Primary = 12.55 cfs @ 12.04 hrs, Volume= 93,348 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 7L: DA-PR Hyd rog raph 14 2.55 cfs 13 12.55 cfs 12 11 10 9 N 8 U 3 7 0 LL 6 5 4 3 2 1- 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) C Inflow ❑ Primary HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 16 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA-EX Runoff Area=661,415 sf 1.11% Impervious Runoff Depth=2.72" Tc=8.9 min CN=70 Runoff=66.34 cfs 149,821 cf Subcatchment 2S: DA TO SCM-A Runoff Area=225,834 sf 75.28% Impervious Runoff Depth=4.85" Tc=5.0 min CN=91 Runoff=42.27 cfs 91,267 cf Subcatchment 3S: DA TO SCM-B Runoff Area=284,847 sf 70.45% Impervious Runoff Depth=4.74" Tc=5.0 min CN=90 Runoff=52.59 cfs 112,486 cf Pond 4P: SCM-A Peak EIev=2,095.03' Storage=38,262 cf Inflow=42.27 cfs 91,267 cf Outflow=21.28 cfs 91,267 cf Pond 5P: SCM-B Peak EIev=2,093.55' Storage=31,695 cf Inflow=52.59 cfs 112,486 cf Outflow=38.69 cfs 112,486 cf Subcatchment 6S: BYPASS Runoff Area=161,407 sf 0.00% Impervious Runoff Depth=2.72" Tc=7.5 min CN=70 Runoff=17.06 cfs 36,561 cf Link 7L: DA-PR Inflow=75.71 cfs 240,314 cf Primary=75.71 cfs 240,314 cf Total Runoff Area = 1,333,503 sf Runoff Volume = 390,135 cf Average Runoff Depth = 3.51" 71.65% Pervious = 955,459 sf 28.35% Impervious = 378,044 sf HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 1S: DA-EX Runoff = 66.34 cfs @ 12.01 hrs, Volume= 149,821 cf, Depth= 2.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 25-YR Rainfall=5.89" Area (sf) CN Description 7,374 98 Paved parking, HSG C 654,041 70 Brush, Fair, HSG C 661,415 70 Weighted Average 654,041 98.89% Pervious Area 7,374 1.11 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 Direct Entry, N U 3 0 E Subcatchment 1S: DA-EX Hydrograph 70 66.34 cfs 65 Type II 24- r 60 2-Y Rin II . " 55 _ 50 3 45 [lull Vol , 40 U n e 35 Td=8.9 min 3o N= 0 2s 20 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 2S: DA TO SCM-A Runoff = 42.27 cfs @ 11.96 hrs, Volume= 91,267 cf, Depth= 4.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 25-YR Rainfall=5.89" Area (sf) CN Description 170,002 98 Paved parking, HSG C 55,832 70 Brush, Fair, HSG C 225,834 91 Weighted Average 55,832 24.72% Pervious Area 170,002 75.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: DA TO SCM-A Hydrograph ❑ Runoff Time (hours) HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 3S: DA TO SCM-B Runoff = 52.59 cfs @ 11.96 hrs, Volume= 112,486 cf, Depth= 4.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 25-YR Rainfall=5.89" Area (sf) CN Description 200,668 98 Paved parking, HSG C 84,179 70 Brush, Fair, HSG C 284,847 90 Weighted Average 84,179 29.55% Pervious Area 200,668 70.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: DA TO SCM-B Hydrograph 55 52.59 cfs 50 45 ' 40 35 � � 30 25 N= 0 20 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 20 Summary for Pond 4P: SCM-A Inflow Area = 225,834 sf, 75.28% Impervious, Inflow Depth = 4.85" for 25-YR event Inflow = 42.27 cfs @ 11.96 hrs, Volume= 91,267 cf Outflow = 21.28 cfs @ 12.04 hrs, Volume= 91,267 cf, Atten= 50%, Lag= 5.0 min Primary = 21.28 cfs @ 12.04 hrs, Volume= 91,267 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,095.03' @ 12.04 hrs Surf.Area= 20,481 sf Storage= 38,262 cf Plug -Flow detention time= 310.8 min calculated for 91,267 cf (100% of inflow) Center -of -Mass det. time= 310.7 min ( 1,088.1 - 777.3 ) Volume Invert # 1 2,093.00' UV01 Description 58,835 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,093.00 17,161 0 0 2,094.00 18,758 17,960 17,960 2,095.00 20,421 19,590 37,549 2,096.00 22,151 21,286 58,835 Device Routing Invert Outlet Devices #1 Primary 2,089.50' 24.0" Round Culvert L= 104.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,089.50' / 2,076.00' S= 0.1298 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,091.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,093.00' 1.000 in/hr Exfiltration over Surface area from 2,090.00' - 2,093.00' Excluded Surface area = 0 sf #4 Primary 2,094.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=21.27 cfs @ 12.04 hrs HW=2,095.03' (Free Discharge) 1=Culvert (Passes 0.30 cfs of 28.42 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.30 cfs @ 8.92 fps) L3=Exfiltration (Passes 0.30 cfs of 0.40 cfs potential flow) 4=Broad-Crested Rectangular Weir (Weir Controls 20.96 cfs @ 3.38 fps) HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 21 N U Pond 4P: SCM-A Hyd rog raph Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 22 Summary for Pond 5P: SCM-B Inflow Area = 284,847 sf, 70.45% Impervious, Inflow Depth = 4.74" for 25-YR event Inflow = 52.59 cfs @ 11.96 hrs, Volume= 112,486 cf Outflow = 38.69 cfs @ 12.01 hrs, Volume= 112,486 cf, Atten= 26%, Lag= 3.3 min Primary = 38.69 cfs @ 12.01 hrs, Volume= 112,486 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,093.55' @ 12.01 hrs Surf.Area= 14,247 sf Storage= 31,695 cf Plug -Flow detention time= 144.1 min calculated for 112,486 cf (100% of inflow) Center -of -Mass det. time= 144.1 min ( 925.2 - 781.1 ) Volume Invert # 1 2, 091.00' UV01 Description 38,255 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,091.00 10,684 0 0 2,092.00 12,024 11,354 11,354 2,093.00 13,433 12,729 24,083 2,094.00 14,912 14,173 38,255 Device Routing Invert Outlet Devices #1 Primary 2,087.50' 24.0" Round Culvert L= 70.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,087.50' / 2,078.00' S= 0.1357 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,089.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,091.00' 1.000 in/hr Exfiltration over Surface area from 2,088.00' - 2,091.00' Excluded Surface area = 0 sf #4 Primary 2,092.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=38.65 cfs @ 12.01 hrs HW=2,093.55' (Free Discharge) 1=Culvert (Passes 0.25 cfs of 29.99 cfs potential flow) L2=Orifice/Grate (Passes 0.25 cfs of 0.33 cfs potential flow) L3=Exfiltration (Exfiltration Controls 0.25 cfs) 4=Broad-Crested Rectangular Weir (Weir Controls 38.40 cfs @ 4.13 fps) HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 23 Pond 5P: SCM-B Hyd rog raph 52.59 cfs 55 50 ea e = 45 St r ge 3 ,6 5 f 40 38.69 cfs 35 30 25 20 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 6S: BYPASS Runoff = 17.06 cfs @ 11.99 hrs, Volume= 36,561 cf, Depth= 2.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 25-YR Rainfall=5.89" Area (so CN Description 161,407 70 Brush, Fair, HSG C 161,407 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, 1 1 1 1 1 1 1 1 H 1 3 0 LL Subcatchment 6S: BYPASS Hydrograph 9 8 17.06 cfs 7 _ 6 5 25 YR R inf 11= " 4 _ 3 2 1 0 9 8 _ 7 TU 5 4 3 2 1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type/1 24-hr 25-YR Rainfall=5.89" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 25 Summary for Link 7L: DA-PR Inflow Area = 672,088 sf, 55.15% Impervious, Inflow Depth = 4.29" for 25-YR event Inflow = 75.71 cfs @ 12.01 hrs, Volume= 240,314 cf Primary = 75.71 cfs @ 12.01 hrs, Volume= 240,314 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Link 7L: DA-PR Hyd rog raph 75.71 cfs 80 75.71 cfs 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) C Inflow ❑ Primary HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 26 Time span=0.00-180.00 hrs, dt=0.01 hrs, 18001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA-EX Runoff Area=661,415 sf 1.11% Impervious Runoff Depth=3.30" Tc=8.9 min CN=70 Runoff=80.39 cfs 181,714 cf Subcatchment 2S: DA TO SCM-A Runoff Area=225,834 sf 75.28% Impervious Runoff Depth=5.56" Tc=5.0 min CN=91 Runoff=47.97 cfs 104,549 cf Subcatchment 3S: DA TO SCM-B Runoff Area=284,847 sf 70.45% Impervious Runoff Depth=5.44" Tc=5.0 min CN=90 Runoff=59.82 cfs 129,162 cf Pond 4P: SCM-A Peak EIev=2,095.21' Storage=41,778 cf Inflow=47.97 cfs 104,549 cf Outflow=26.67 cfs 104,549 cf Pond 5P: SCM-B Peak EIev=2,093.71' Storage=33,962 cf Inflow=59.82 cfs 129,162 cf Outflow=44.71 cfs 129,162 cf Subcatchment 6S: BYPASS Runoff Area=161,407 sf 0.00% Impervious Runoff Depth=3.30" Tc=7.5 min CN=70 Runoff=20.66 cfs 44,344 cf Link 7L: DA-PR Inflow=90.79 cfs 278,055 cf Primary=90.79 cfs 278,055 cf Total Runoff Area = 1,333,503 sf Runoff Volume = 459,768 cf Average Runoff Depth = 4.14" 71.65% Pervious = 955,459 sf 28.35% Impervious = 378,044 sf HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 1S: DA-EX Runoff = 80.39 cfs @ 12.01 hrs, Volume= 181,714 cf, Depth= 3.30" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 50-YR Rainfall=6.61" Area (sf) CN Description 7,374 98 Paved parking, HSG C 654,041 70 Brush, Fair, HSG C 661,415 70 Weighted Average 654,041 98.89% Pervious Area 7,374 1.11 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 Direct Entry, N U 3 0 LL Subcatchment 1S: DA-EX Hydrograph 90 85 80.39 cfs 80 75 JF IF 70 - n a 65 60 55 � 50 Ruwff a th 3.3 " 45 win 40 35 N= 0 30 25 20 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 2S: DA TO SCM-A Runoff = 47.97 cfs @ 11.96 hrs, Volume= 104,549 cf, Depth= 5.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 50-YR Rainfall=6.61" Area (sf) CN Description 170,002 98 Paved parking, HSG C 55,832 70 Brush, Fair, HSG C 225,834 91 Weighted Average 55,832 24.72% Pervious Area 170,002 75.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: DA TO SCM-A Hydrograph ❑ Runoff Time (hours) HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 3S: DA TO SCM-B Runoff = 59.82 cfs @ 11.96 hrs, Volume= 129,162 cf, Depth= 5.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 50-YR Rainfall=6.61" Area (sf) CN Description 200,668 98 Paved parking, HSG C 84,179 70 Brush, Fair, HSG C 284,847 90 Weighted Average 84,179 29.55% Pervious Area 200,668 70.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, w 3 0 E Subcatchment 3S: DA TO SCM-B Hydrograph 65 59.82 cfs 60 55 n 50 45 40 35 ' 30 25 20 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 30 Summary for Pond 4P: SCM-A Inflow Area = 225,834 sf, 75.28% Impervious, Inflow Depth = 5.56" for 50-YR event Inflow = 47.97 cfs @ 11.96 hrs, Volume= 104,549 cf Outflow = 26.67 cfs @ 12.03 hrs, Volume= 104,549 cf, Atten= 44%, Lag= 4.6 min Primary = 26.67 cfs @ 12.03 hrs, Volume= 104,549 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,095.21' @ 12.03 hrs Surf.Area= 20,776 sf Storage= 41,778 cf Plug -Flow detention time= 278.8 min calculated for 104,543 cf (100% of inflow) Center -of -Mass det. time= 278.9 min ( 1,052.6 - 773.7 ) Volume Invert # 1 2,093.00' UV01 Description 58,835 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,093.00 17,161 0 0 2,094.00 18,758 17,960 17,960 2,095.00 20,421 19,590 37,549 2,096.00 22,151 21,286 58,835 Device Routing Invert Outlet Devices #1 Primary 2,089.50' 24.0" Round Culvert L= 104.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,089.50' / 2,076.00' S= 0.1298 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,091.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,093.00' 1.000 in/hr Exfiltration over Surface area from 2,090.00' - 2,093.00' Excluded Surface area = 0 sf #4 Primary 2,094.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=26.64 cfs @ 12.03 hrs HW=2,095.20' (Free Discharge) 1=Culvert (Passes 0.31 cfs of 28.95 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.31 cfs @ 9.14 fps) L3=Exfiltration (Passes 0.31 cfs of 0.40 cfs potential flow) 4=Broad-Crested Rectangular Weir (Weir Controls 26.33 cfs @ 3.64 fps) HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 31 Pond 4P: SCM-A Hyd rog raph 47.97 cfs 50 45 r, 40 7 35 30 26.67 cfs 25 20 15 -x 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 32 Summary for Pond 5P: SCM-B Inflow Area = 284,847 sf, 70.45% Impervious, Inflow Depth = 5.44" for 50-YR event Inflow = 59.82 cfs @ 11.96 hrs, Volume= 129,162 cf Outflow = 44.71 cfs @ 12.01 hrs, Volume= 129,162 cf, Atten= 25%, Lag= 3.3 min Primary = 44.71 cfs @ 12.01 hrs, Volume= 129,162 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,093.71' @ 12.01 hrs Surf.Area= 14,480 sf Storage= 33,962 cf Plug -Flow detention time= 130.3 min calculated for 129,154 cf (100% of inflow) Center -of -Mass det. time= 130.3 min ( 907.7 - 777.4 ) Volume Invert # 1 2, 091.00' UV01 Description 38,255 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,091.00 10,684 0 0 2,092.00 12,024 11,354 11,354 2,093.00 13,433 12,729 24,083 2,094.00 14,912 14,173 38,255 Device Routing Invert Outlet Devices #1 Primary 2,087.50' 24.0" Round Culvert L= 70.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,087.50' / 2,078.00' S= 0.1357 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,089.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,091.00' 1.000 in/hr Exfiltration over Surface area from 2,088.00' - 2,091.00' Excluded Surface area = 0 sf #4 Primary 2,092.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=44.68 cfs @ 12.01 hrs HW=2,093.71' (Free Discharge) 1=Culvert (Passes 0.25 cfs of 30.46 cfs potential flow) L2=Orifice/Grate (Passes 0.25 cfs of 0.33 cfs potential flow) L3=Exfiltration (Exfiltration Controls 0.25 cfs) 4=Broad-Crested Rectangular Weir (Weir Controls 44.44 cfs @ 4.34 fps) HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 33 Pond 5P: SCM-B Hyd rog raph 65 59.82 cfs 60 55 50 44.71 cfs r g e , 45 40 35 30 25 20 15 10 5 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 6S: BYPASS Runoff = 20.66 cfs @ 11.99 hrs, Volume= 44,344 cf, Depth= 3.30" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Type II 24-hr 50-YR Rainfall=6.61" Area (so CN Description 161,407 70 Brush, Fair, HSG C 161,407 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, N U 3 0 LL Subcatchment 6S: BYPASS Hydrograph 23 22 21 20.66 cfs 20 — 19 _ 18 17 16 Runoff re 15 r _ 14 13 _ 12 11 10 9 - 8 7 6 5 4 3 2 1 LILL", 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Runoff HydroCAD-Update Type 11 24-hr 50-YR Rainfall=6.61" Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 35 Summary for Link 7L: DA-PR Inflow Area = 672,088 sf, 55.15% Impervious, Inflow Depth = 4.96" for 50-YR event Inflow = 90.79 cfs @ 12.01 hrs, Volume= 278,055 cf Primary = 90.79 cfs @ 12.01 hrs, Volume= 278,055 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs 1 N U 3 0 LL Link 7L: DA-PR Hyd rog raph 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) C Inflow ❑ Primary Appendix "F" Detained Bypass Total Area (sgft) Impervious Area Pervious Area Impervious Area Total Area (sgft) Impervious percent Runoff Volume in 1" Storm (cf) Height in Pond/Stormtech chamber Pond 1 225,834 170,002 55,832 76,656 75.3% 13,691 2,093.43 Pond 2 284,847 200,668 84,179 84,752 70.4% 16,237 2,091.80 TOTAL 510,681 370,670 140,011 - 76,656 1 HydroCAD-Update Type 11 24-hr WQV A Rainfall= 1. 49 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Pond 4P: SCM-A Inflow Area = 225,834 sf, 75.28% Impervious, Inflow Depth = 0.73" for WQV A event Inflow = 7.04 cfs @ 11.96 hrs, Volume= 13,775 cf Outflow = 0.22 cfs @ 14.05 hrs, Volume= 13,775 cf, Atten= 97%, Lag= 125.5 min Primary = 0.22 cfs @ 14.05 hrs, Volume= 13,775 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,093.43' @ 14.05 hrs Surf.Area= 17,843 sf Storage= 7,477 cf Plug -Flow detention time= 366.6 min calculated for 13,775 cf (100% of inflow) Center -of -Mass det. time= 366.6 min ( 1,197.2 - 830.5 ) Volume Invert # 1 2,093.00' UV01 Description 58,835 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,093.00 17,161 0 0 2,094.00 18,758 17,960 17,960 2,095.00 20,421 19,590 37,549 2,096.00 22,151 21,286 58,835 Device Routing Invert Outlet Devices #1 Primary 2,089.50' 24.0" Round Culvert L= 104.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,089.50' / 2,076.00' S= 0.1298 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,091.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,093.00' 1.000 in/hr Exfiltration over Surface area from 2,090.00' - 2,093.00' Excluded Surface area = 0 sf #4 Primary 2,094.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.22 cfs @ 14.05 hrs HW=2,093.43' (Free Discharge) 1=Culvert (Passes 0.22 cfs of 22.84 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.22 cfs @ 6.50 fps) L3=Exfiltration (Passes 0.22 cfs of 0.40 cfs potential flow) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) HydroCAD-Update Type 11 24-hr WQV A Rainfall= 1. 49 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 8 N U Pond 4P: SCM-A Hyd rog raph 77.04cfs 7I fl w ra=2,84 f ea e = 6 twaga_ 3-41 5 4 3 2 1 0.22 cfs 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type 11 24-hr WQV A Rainfall= 1. 49 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 9 Hydrograph for Pond 4P: SCM-A Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 2,093.00 0.00 5.00 0.00 0 2,093.00 0.00 10.00 0.04 48 2,093.00 0.02 15.00 0.18 7,409 2,093.42 0.22 20.00 0.08 5,668 2,093.33 0.22 25.00 0.00 2,980 2,093.17 0.21 30.00 0.00 58 2,093.00 0.02 35.00 0.00 0 2,093.00 0.00 40.00 0.00 0 2,093.00 0.00 45.00 0.00 0 2,093.00 0.00 50.00 0.00 0 2,093.00 0.00 55.00 0.00 0 2,093.00 0.00 60.00 0.00 0 2,093.00 0.00 65.00 0.00 0 2,093.00 0.00 70.00 0.00 0 2,093.00 0.00 75.00 0.00 0 2,093.00 0.00 80.00 0.00 0 2,093.00 0.00 85.00 0.00 0 2,093.00 0.00 90.00 0.00 0 2,093.00 0.00 95.00 0.00 0 2,093.00 0.00 100.00 0.00 0 2,093.00 0.00 105.00 0.00 0 2,093.00 0.00 110.00 0.00 0 2,093.00 0.00 115.00 0.00 0 2,093.00 0.00 120.00 0.00 0 2,093.00 0.00 125.00 0.00 0 2,093.00 0.00 130.00 0.00 0 2,093.00 0.00 135.00 0.00 0 2,093.00 0.00 140.00 0.00 0 2,093.00 0.00 145.00 0.00 0 2,093.00 0.00 150.00 0.00 0 2,093.00 0.00 155.00 0.00 0 2,093.00 0.00 160.00 0.00 0 2,093.00 0.00 165.00 0.00 0 2,093.00 0.00 170.00 0.00 0 2,093.00 0.00 175.00 0.00 0 2,093.00 0.00 180.00 0.00 0 2,093.00 0.00 HydroCAD-Update Type 11 24-hr WQV A Rainfall= 1. 49 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 10 Elevation Primary (feet) (cfs) 2,093.00 0.00 2,093.02 0.20 2,093.04 0.20 2,093.06 0.20 2,093.08 0.20 2,093.10 0.20 2,093.12 0.20 2,093.14 0.20 2,093.16 0.20 2,093.18 0.21 2,093.20 0.21 2,093.22 0.21 2,093.24 0.21 2,093.26 0.21 2,093.28 0.21 2,093.30 0.21 2,093.32 0.22 2,093.34 0.22 2,093.36 0.22 2,093.38 0.22 2,093.40 0.22 2,093.42 0.22 2,093.44 0.22 2,093.46 0.22 2,093.48 0.22 2,093.50 0.23 2,093.52 0.23 2,093.54 0.23 2,093.56 0.23 2,093.58 0.23 2,093.60 0.23 2,093.62 0.23 2,093.64 0.23 2,093.66 0.24 2,093.68 0.24 2,093.70 0.24 2,093.72 0.24 2,093.74 0.24 2,093.76 0.24 2,093.78 0.24 2,093.80 0.24 2,093.82 0.24 2,093.84 0.25 2,093.86 0.25 2,093.88 0.25 2,093.90 0.25 2,093.92 0.25 2,093.94 0.25 2,093.96 0.25 2,093.98 0.25 2,094.00 0.25 2,094.02 0.30 Stage -Discharge for Pond 4P: SCM-A Elevation Primary (feet) (cfs) 2,094.04 0.39 2,094.06 0.50 2,094.08 0.64 2,094.10 0.79 2,094.12 0.96 2,094.14 1.14 2,094.16 1.34 2,094.18 1.55 2,094.20 1.77 2,094.22 2.01 2,094.24 2.26 2,094.26 2.52 2,094.28 2.80 2,094.30 3.09 2,094.32 3.39 2,094.34 3.70 2,094.36 4.03 2,094.38 4.36 2,094.40 4.71 2,094.42 5.07 2,094.44 5.45 2,094.46 5.83 2,094.48 6.23 2,094.50 6.64 2,094.52 7.07 2,094.54 7.50 2,094.56 7.95 2,094.58 8.40 2,094.60 8.87 2,094.62 9.37 2,094.64 9.88 2,094.66 10.41 2,094.68 10.95 2,094.70 11.50 2,094.72 12.06 2,094.74 12.64 2,094.76 13.24 2,094.78 13.84 2,094.80 14.46 2,094.82 15.01 2,094.84 15.56 2,094.86 16.12 2,094.88 16.68 2,094.90 17.25 2,094.92 17.83 2,094.94 18.42 2,094.96 19.01 2,094.98 19.62 2,095.00 20.22 2,095.02 20.82 2,095.04 21.43 2,095.06 22.04 Elevation Primary (feet) (cfs) 2,095.08 22.66 2,095.10 23.29 2,095.12 23.92 2,095.14 24.56 2,095.16 25.20 2,095.18 25.84 2,095.20 26.50 2,095.22 27.15 2,095.24 27.82 2,095.26 28.49 2,095.28 29.16 2,095.30 29.84 2,095.32 30.53 2,095.34 31.22 2,095.36 31.91 2,095.38 32.61 2,095.40 33.32 2,095.42 34.03 2,095.44 34.74 2,095.46 35.46 2,095.48 36.19 2,095.50 36.92 2,095.52 37.65 2,095.54 38.39 2,095.56 39.14 2,095.58 39.89 2,095.60 40.64 2,095.62 41.40 2,095.64 42.17 2,095.66 42.93 2,095.68 43.71 2,095.70 44.49 2,095.72 45.27 2,095.74 46.05 2,095.76 46.85 2,095.78 47.64 2,095.80 48.44 2,095.82 49.25 2,095.84 50.06 2,095.86 50.87 2,095.88 51.69 2,095.90 52.51 2,095.92 53.34 2,095.94 54.17 2,095.96 55.00 2,095.98 55.84 2,096.00 56.69 HydroCAD-Update Type 11 24-hr WQV A Rainfall= 1. 49 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 11 Stage -Area -Storage for Pond 4P: SCM-A Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 2,093.00 17,161 0 2,093.05 17,241 860 2,093.10 17,321 1,724 2,093.15 17,401 2,592 2,093.20 17,480 3,464 2,093.25 17,560 4,340 2,093.30 17,640 5,220 2,093.35 17,720 6,104 2,093.40 17,800 6,992 2,093.45 17,880 7,884 2,093.50 17,960 8,780 2,093.55 18,039 9,680 2,093.60 18,119 10,584 2,093.65 18,199 11,492 2,093.70 18,279 12,404 2,093.75 18,359 13,320 2,093.80 18,439 14,240 2,093.85 18,518 15,164 2,093.90 18,598 16,092 2,093.95 18,678 17,024 2,094.00 18,758 17,960 2,094.05 18,841 18,899 2,094.10 18,924 19,844 2,094.15 19,007 20,792 2,094.20 19,091 21,744 2,094.25 19,174 22,701 2,094.30 19,257 23,662 2,094.35 19,340 24,627 2,094.40 19,423 25,596 2,094.45 19,506 26,569 2,094.50 19,590 27,546 2,094.55 19,673 28,528 2,094.60 19,756 29,514 2,094.65 19,839 30,504 2,094.70 19,922 31,498 2,094.75 20,005 32,496 2,094.80 20,088 33,498 2,094.85 20,172 34,505 2,094.90 20,255 35,515 2,094.95 20,338 36,530 2,095.00 20,421 37,549 2,095.05 20,508 38,572 2,095.10 20,594 39,600 2,095.15 20,681 40,632 2,095.20 20,767 41,668 2,095.25 20,854 42,708 2,095.30 20,940 43,753 2,095.35 21,026 44,802 2,095.40 21,113 45,856 2,095.45 21,199 46,914 2,095.50 21,286 47,976 2,095.55 21,373 49,042 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 2,095.60 21,459 50,113 2,095.65 21,546 51,188 2,095.70 21,632 52,268 2,095.75 21,719 53,351 2,095.80 21,805 54,439 2,095.85 21,891 55,532 2,095.90 21,978 56,629 2,095.95 22,064 57,730 2,096.00 22,151 58,835 HydroCAD-Update Type 1124-hr WQV B Rainfall= 1. 51 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 23 Summary for Pond 5P: SCM-B Inflow Area = 284,847 sf, 70.45% Impervious, Inflow Depth = 0.69" for WQV B event Inflow = 8.41 cfs @ 11.96 hrs, Volume= 16,410 cf Outflow = 0.24 cfs @ 14.61 hrs, Volume= 16,410 cf, Atten= 97%, Lag= 158.6 min Primary = 0.24 cfs @ 14.61 hrs, Volume= 16,410 cf Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.01 hrs Peak Elev= 2,091.80' @ 14.61 hrs Surf.Area= 11,759 sf Storage= 9,001 cf Plug -Flow detention time= 412.2 min calculated for 16,409 cf (100% of inflow) Center -of -Mass det. time= 412.2 min ( 1,247.7 - 835.5 ) Volume Invert # 1 2, 091.00' UV01 Description 38,255 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 2,091.00 10,684 0 0 2,092.00 12,024 11,354 11,354 2,093.00 13,433 12,729 24,083 2,094.00 14,912 14,173 38,255 Device Routing Invert Outlet Devices #1 Primary 2,087.50' 24.0" Round Culvert L= 70.0' Box, 00 wingwalls, square crown edge, Ke= 0.700 Inlet / Outlet Invert= 2,087.50' / 2,078.00' S= 0.1357 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf #2 Device 1 2,089.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 2 2,091.00' 1.000 in/hr Exfiltration over Surface area from 2,088.00' - 2,091.00' Excluded Surface area = 0 sf #4 Primary 2,092.00' 6.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.24 cfs @ 14.61 hrs HW=2,091.80' (Free Discharge) 1=Culvert (Passes 0.24 cfs of 24.25 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.24 cfs @ 7.14 fps) L3=Exfiltration (Passes 0.24 cfs of 0.25 cfs potential flow) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) HydroCAD-Update Type 1124-hr WQV B Rainfall= 1. 51 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 24 N U Pond 5P: SCM-B Hyd rog raph 9 8.41 cfs Inflow AIVE 8 , 7 6 5 4 3 2 1 0.24 cfs 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) ❑ Inflow ❑ Primary HydroCAD-Update Type 1124-hr WQV B Rainfall= 1. 51 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 25 Hydrograph for Pond 5P: SCM-B Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 2,091.00 0.00 5.00 0.00 0 2,091.00 0.00 10.00 0.03 26 2,091.00 0.02 15.00 0.22 8,988 2,091.80 0.24 20.00 0.10 7,370 2,091.66 0.24 25.00 0.00 4,614 2,091.42 0.22 30.00 0.00 829 2,091.08 0.20 35.00 0.00 0 2,091.00 0.00 40.00 0.00 0 2,091.00 0.00 45.00 0.00 0 2,091.00 0.00 50.00 0.00 0 2,091.00 0.00 55.00 0.00 0 2,091.00 0.00 60.00 0.00 0 2,091.00 0.00 65.00 0.00 0 2,091.00 0.00 70.00 0.00 0 2,091.00 0.00 75.00 0.00 0 2,091.00 0.00 80.00 0.00 0 2,091.00 0.00 85.00 0.00 0 2,091.00 0.00 90.00 0.00 0 2,091.00 0.00 95.00 0.00 0 2,091.00 0.00 100.00 0.00 0 2,091.00 0.00 105.00 0.00 0 2,091.00 0.00 110.00 0.00 0 2,091.00 0.00 115.00 0.00 0 2,091.00 0.00 120.00 0.00 0 2,091.00 0.00 125.00 0.00 0 2,091.00 0.00 130.00 0.00 0 2,091.00 0.00 135.00 0.00 0 2,091.00 0.00 140.00 0.00 0 2,091.00 0.00 145.00 0.00 0 2,091.00 0.00 150.00 0.00 0 2,091.00 0.00 155.00 0.00 0 2,091.00 0.00 160.00 0.00 0 2,091.00 0.00 165.00 0.00 0 2,091.00 0.00 170.00 0.00 0 2,091.00 0.00 175.00 0.00 0 2,091.00 0.00 180.00 0.00 0 2,091.00 0.00 HydroCAD-Update Type 1124-hr WQV B Rainfall= 1. 51 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 26 Elevation Primary (feet) (cfs) 2,091.00 0.00 2,091.02 0.20 2,091.04 0.20 2,091.06 0.20 2,091.08 0.20 2,091.10 0.20 2,091.12 0.20 2,091.14 0.20 2,091.16 0.20 2,091.18 0.21 2,091.20 0.21 2,091.22 0.21 2,091.24 0.21 2,091.26 0.21 2,091.28 0.21 2,091.30 0.21 2,091.32 0.22 2,091.34 0.22 2,091.36 0.22 2,091.38 0.22 2,091.40 0.22 2,091.42 0.22 2,091.44 0.22 2,091.46 0.22 2,091.48 0.22 2,091.50 0.23 2,091.52 0.23 2,091.54 0.23 2,091.56 0.23 2,091.58 0.23 2,091.60 0.23 2,091.62 0.23 2,091.64 0.23 2,091.66 0.24 2,091.68 0.24 2,091.70 0.24 2,091.72 0.24 2,091.74 0.24 2,091.76 0.24 2,091.78 0.24 2,091.80 0.24 2,091.82 0.24 2,091.84 0.25 2,091.86 0.25 2,091.88 0.25 2,091.90 0.25 2,091.92 0.25 2,091.94 0.25 2,091.96 0.25 2,091.98 0.25 2,092.00 0.25 2,092.02 0.29 Stage -Discharge for Pond 5P: SCM-B Elevation Primary (feet) (cfs) 2,092.04 0.38 2,092.06 0.49 2,092.08 0.63 2,092.10 0.78 2,092.12 0.95 2,092.14 1.13 2,092.16 1.32 2,092.18 1.53 2,092.20 1.75 2,092.22 1.99 2,092.24 2.24 2,092.26 2.50 2,092.28 2.78 2,092.30 3.07 2,092.32 3.37 2,092.34 3.68 2,092.36 4.00 2,092.38 4.33 2,092.40 4.68 2,092.42 5.04 2,092.44 5.42 2,092.46 5.80 2,092.48 6.20 2,092.50 6.61 2,092.52 7.03 2,092.54 7.47 2,092.56 7.91 2,092.58 8.37 2,092.60 8.84 2,092.62 9.33 2,092.64 9.84 2,092.66 10.37 2,092.68 10.91 2,092.70 11.46 2,092.72 12.02 2,092.74 12.60 2,092.76 13.19 2,092.78 13.80 2,092.80 14.42 2,092.82 14.96 2,092.84 15.51 2,092.86 16.07 2,092.88 16.63 2,092.90 17.20 2,092.92 17.78 2,092.94 18.37 2,092.96 18.96 2,092.98 19.56 2,093.00 20.17 2,093.02 20.77 2,093.04 21.37 2,093.06 21.99 Elevation Primary (feet) (cfs) 2,093.08 22.60 2,093.10 23.23 2,093.12 23.86 2,093.14 24.49 2,093.16 25.13 2,093.18 25.78 2,093.20 26.43 2,093.22 27.09 2,093.24 27.75 2,093.26 28.42 2,093.28 29.09 2,093.30 29.77 2,093.32 30.46 2,093.34 31.15 2,093.36 31.84 2,093.38 32.54 2,093.40 33.24 2,093.42 33.95 2,093.44 34.67 2,093.46 35.39 2,093.48 36.11 2,093.50 36.84 2,093.52 37.58 2,093.54 38.32 2,093.56 39.06 2,093.58 39.81 2,093.60 40.56 2,093.62 41.32 2,093.64 42.08 2,093.66 42.85 2,093.68 43.62 2,093.70 44.40 2,093.72 45.18 2,093.74 45.97 2,093.76 46.76 2,093.78 47.55 2,093.80 48.35 2,093.82 49.16 2,093.84 49.97 2,093.86 50.78 2,093.88 51.60 2,093.90 52.42 2,093.92 53.24 2,093.94 54.07 2,093.96 54.91 2,093.98 55.75 2,094.00 56.59 HydroCAD-Update Type 1124-hr WQV B Rainfall= 1. 51 " Prepared by {enter your company name here} Printed 10/4/2022 HydroCAD® 10.00-24 s/n 05122 © 2018 HydroCAD Software Solutions LLC Page 27 Stage -Area -Storage for Pond 5P: SCM-B Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 2,091.00 10,684 0 2,091.05 10,751 536 2,091.10 10,818 1,075 2,091.15 10,885 1,618 2,091.20 10,952 2,164 2,091.25 11,019 2,713 2,091.30 11,086 3,266 2,091.35 11,153 3,821 2,091.40 11,220 4,381 2,091.45 11,287 4,943 2,091.50 11,354 5,510 2,091.55 11,421 6,079 2,091.60 11,488 6,652 2,091.65 11,555 7,228 2,091.70 11,622 7,807 2,091.75 11,689 8,390 2,091.80 11,756 8,976 2,091.85 11,823 9,565 2,091.90 11,890 10,158 2,091.95 11,957 10,754 2,092.00 12,024 11,354 2,092.05 12,094 11,957 2,092.10 12,165 12,563 2,092.15 12,235 13,173 2,092.20 12,306 13,787 2,092.25 12,376 14,404 2,092.30 12,447 15,025 2,092.35 12,517 15,649 2,092.40 12,588 16,276 2,092.45 12,658 16,907 2,092.50 12,729 17,542 2,092.55 12,799 18,180 2,092.60 12,869 18,822 2,092.65 12,940 19,467 2,092.70 13,010 20,116 2,092.75 13,081 20,768 2,092.80 13,151 21,424 2,092.85 13,222 22,083 2,092.90 13,292 22,746 2,092.95 13,363 23,413 2,093.00 13,433 24,083 2,093.05 13,507 24,756 2,093.10 13,581 25,433 2,093.15 13,655 26,114 2,093.20 13,729 26,799 2,093.25 13,803 27,487 2,093.30 13,877 28,179 2,093.35 13,951 28,875 2,093.40 14,025 29,574 2,093.45 14,099 30,277 2,093.50 14,173 30,984 2,093.55 14,246 31,694 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 2,093.60 14,320 32,409 2,093.65 14,394 33,126 2,093.70 14,468 33,848 2,093.75 14,542 34,573 2,093.80 14,616 35,302 2,093.85 14,690 36,035 2,093.90 14,764 36,771 2,093.95 14,838 37,511 2,094.00 14,912 38,255 Appendix "G" Project Stormwater Calculations -Collection Project Name: Jurisdiction: Henderson County James River Project Number: 539621 PIPE CALCULATIONS Pipe Name Up Invert Down Invert Pipe Size Pipe Material Length Slope DRAINAGE of UPSTREAM FLOW DESIGN FLOW RESULTS OUTLET PROTECTION CALCS Da to Inlet Da to Inlet C Value TOC Izs q inlet structure structure I Upstream q Total q Flow Depth Velocity d50 Stone Size I Apron Thickness Pad Length Pad Width P.1 2116.0' 2115.0' 15.0 in HDPE 35 ft 2.9% 10,576 sf 0.2 ac 0.41 5 min 8.1 0.81 cfs 0.011 none none 0.00 cfs 0.81 cfs 2.7 in 5.5 fps 6 in 9 in 10 ft 14 ft P.2 2111.3' 2108.5' 18.0 in HDPE 121 ft 2.3% 33,821 sf 0.8 ac 0.95 5 min 8.1 5.97 cfs 0.011 none none 0.00 cfs 5.97 cfs 7.0 in 9.3 fps 6 in 9 in loft 15 ft P.3 2100.0' 2094.0' 36.0 in HDPE 25 ft 24.0% 0.0 ac 8.1 0.00 cfs 0.011 SW.3 SWA 31.55 cfs 1 31.55 cfs 7.3 in 30.9 fps 12 in 18 in 20 ft 29 ft PA 2104.0' 2092.0' 36.0 in HDPE 42 ft 28.6% 0.0 ac 8.1 0.00 cfs 0.011 SW.1 SW.2 39.62 cfs 39.62 cfs 7.8 in 35.3 fps 12 in 18 in 20 ft 29 ft Project Stormwater Calculations -Collection Project Name: Jurisdiction: Henderson County James River Project Number: 539621 SWALE CHART SWALE CALCULATIONS Swale Name Up Invert Down Invert Side Slope - Z �btm width b(ft) Length Slope DRAINAGE I of DESIGN FLOW RESULTS Da to Inlet Da to Inlet C Value TOC 1 125 q swale [Upstream q Total q Flow Depth Velocity Sheer Stress Reinforcement SW.1 2114.0' 2103.0' 3.0 1.0 ft 1074 ft 1.0% 187,092 sf 4.3 ac 0.76 5 min 8.1 26.44 cfs 0.025 0.00 cfs 26.44 cfs 14.8 in 4.6 fps 0.79 NAG SC150 SW.2 2111.0' 2103.0' 3.0 1.0 ft 426 ft 1.9% 77,909 sf 1.8 ac 0.91 5 min 8.1 13.18 cfs 0.025 0.00 cfs 13.18 cfs 9.6 in 4.8 fps 0.94 NAG SC150 SW.3 2111.0' 2100.0' 3.0 1.0 ft 591 ft 1.9% 152,915 sf 3.5 ac 0.91 5 min 8.1 25.88 cfs 0.025 0.00 cfs 25.88 cfs 12.8 in 5.7 fps 1.24 NAG SC150 SW.4 2114.0' 2100.0' 3.0 1.0 ft 243 ft 5.8% 40,182 sf 0.9 ac 0.76 5 min 8.1 5.68 cfs 0.025 0.00 cfs 5.68 cfs 5.0 in 6.0 fps 1.51 NAG SC150 �R= JAMES RIVER EQUIPTMENT SKIMMER SEDIMENT BASIN SIZING CHART Basin Drainage Area / Flow Calcs.: I Min. Size Calcs.: Basin Storage Dimensions: Spillway Calcs.: #: Drainage area (ac.) Weighted C: 2yr intensity: 25yr intensity: Q2"242.47 Min. Surface Area (ft) Min. Volume (ft) Bottom Elevation: Width (ft): Length (ft.): Area : (ft): Depth (ft.): Volume ft3 : Dewatering Time (hrs.): Number of Skimmers: Skimmer Size: Skimmer Orifice Size: Ponding Elevation: Emergency SpillwayEl.: Emergency Spillway Dim.: Emergency Spillway V(f/s): Water Depth (ft): Free -board (ft): Top of Dam El.: Total: Disturbed: To Bottom: To Bottom: A 4.45 4.34 0.40 5.24 7.07 �15. 4,052.1 7,812.0 2072.0' S5.0 47.0 110.0 102.0 6,050.0 2.0 10,844.0 48 hours 1 2.5 in 2.Oin 2074.0' 2074.5' 7.0' X 2.0' 1.78 0.76 1.24 2076.5' B 7.26 7.09 0.40 5.24 7.07 6,614.1 12,762.0 2090.0' 144.0 135.0 92.0 78.0 13,248.0 2.0 23,778.0 48 hours 1 3.0 in 2.4in 2092.0' 2092.5' 11.0' X 2.0' 1.85 0.78 1.72 2095.0' Skimmer Sediment Basin Design Notes: 1. Sediment Basins have been designed in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual Standard (Revision number 6/06) Standard number 6.64 2. Maximum Drainage Area = 10 Acres 3. Minimum Volume = 1800 ft' per Acre of Disturbed Area. 4. Minimum Surface Area = 325 ftZ per Q10 (cfs) of peak inflow. 5. Dewatering time is from 24 to 72 hours 6. Each basin requires 3 baffles BN0KS0 l N G A S S C C i AT E S 17 Arlington Street I Asheville, NC 2W 1 U&2324700 General Notes: Date: 09/14/2022 Calculations By: ZAW Appendix "H"