HomeMy WebLinkAboutSW1221201_O&M Agreement/Plan_20221215Operation & Maintenance Agreement
Project Name:
James River Equipment
Project Location: (Mills River, NC
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & cor
Infiltration Basin
Quantity:)
Infiltration Trench
Quantity:
Bioretention Cell
Quantity:
Wet Pond
Quantity:
Stormwater Wetland
Quantity:
Permeable Pavement
Quantity:
Sand Filter
Quantity:
Rainwater Harvesting
Quantity:
Green Roof
Quantity:
Level Spreader - Filter Strip
Quantity:
Proprietary System
Quantity:
Treatment Swale
Quantity:
Dry Pond
Quantity:
Disconnected Impervious Surface
Present:
User Defined SCM
Present:
Low Density
Present:
tonding O&M sheets will be added automatically):
Location(s):
Location(s):
2 Location(s): 35.2174/-82.5539 & 35.4146/-82.5540
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
No Location(s):
No Location(s):
No Type:
acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
Signature: if I
l,`)a ta1`3'
County of
Mark Romer
Owner & JRE Mills River LLC
11047 Leadbetter Road
Ashland, VA 23005
804-338-2123
mromer@jamesriverequipment.com
o)(Isc=n
w VEr , do hereby certify that
personally appeared before me this
�— Date. r 2 ��
a Notary Public for the State of V ) r G i n (Cv
I� VV 1"
I day of and
acknowledge the due execution of the Q �rations(Nnd ainnance Agreement .
``�.• �F .........
. . ..
5 pOrARY Oy2p'
Re PUBLIC �?
Y MYC - 241 ?Eg =
Q4 30/��S rON
.......... I
ITH OF
Seat
seal,
JI
My commission expires 1'
STORM-EZ 12/5/2022
Version 1.5 0&M Agreement Page 1 of 3
...
Bioretenton Maintenance Requirements `
Important operation and maintenance procedures:
Immediately after the bioretention cell is established, the plants will be watered twice weekly if
needed until the plants become established (commonly six weeks).
Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell.
- Heavy equipment will NEVER be driven over the bloretention cell.
- Special care will be taken to prevent sediment from entering the bioretention cell.
Once a year, a soil test of the soil media will be conducted.
Remove top layer of fill media when the pool does not drain quickly. Based on the media
specification, the pool should drain within 24 hours.
After the bioretention cell is established, it will be inspected quarterly and within 24 hours after every storm event
greater than 1.0 inches (or 1.6 inches if in a Coastal County). Records of operation and maintenance shall be kept
in a known set location and shall be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potential problem:
How to remediate the problem:
The entire bioretention
Trash/debris is present.
Remove the trash/debris.
cell
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, plant ground
The perimeter of the
erosive gullies have
cover and water until it is established_ Provide lime and a one -
bioretention cell
formed,
time fertilizer application.
The structure is clogged.
Unclog the structure and dispose of any sediment off -site.
The flow diversion
Make any necessary repairs or replace if the damage is too
structure (if applicable)
The structure is damaged.
much for repair.
The inlet pipe is clogged iUnclog
the pipe and dispose of any sediment in a location
(if applicable).
where it will not cause impacts to streams or the SCM.
The inlet pipe is cracked
or otherwise damaged (if
Repair or replace the pipe.
applicable).
Regrade the Swale if necessary and provide erosion control
The inlet device
Erosion is occurring in the
devices such as reinforced turf matting or riprap to avoid future
Swale (if applicable),
erosion problems.
Stone verge is clogged or
Remove sediment and clogged stone and replace with clean
covered in sediment (if
stone.
applicable).
Flow is bypassing
Regrade if necessary to route all flow to the pretreatment area.
pretreatment area and/or
Restabilize the area after grading.
gullies have formed.
Sediment has
Search for the source of the sediment and remedy the problem
accumulated to a depth
if possible. Remove the sediment and dispose of it in a location
The pretreatment area
greater than three inches,
where it will not cause impacts to streams or the SCM.
Provide additional erosion protection such as reinforced turf
Erosion has occurred.
matting or riprap if needed to prevent future erosion problems.
Remove the weeds, preferably by hand. If pesticide is used,
Weeds are present.
wipe it on the plants rather than spraying.
121 '.*dnfinn Maintanarfra F!A_enafrarna11t3 thantlnt{ed, , . - .
Potential problem:
How to remediate the problem:
SCM element:
Best professional
practices show that
pruning is needed to
maintain optimal plant
prune according to best professional practices. Maintain lines
of sight between 2'-6'.
health.
Determine the source of the problem: soils, hydrology, disease,
Bioretention cell
vegetation
Plants are dead, diseased
or dying.
etc. Remedy the problem and replace plants. Provide a one-
time fertilizer application to establish the ground cover if a soil
test indicates it is necessary. If sod was used, check to see
that it was not grown on clay or impermeable soils. Replace
sod if necessary.
Weeds are present.
Remove the weeds, preferably by hand. If pesticide is used,
wipe it on the plants rather than spraying.
Tree stakes/wires are
present six months after
planting.
Remove tree stake/wires (which can kill the tree if not
removed).
Spot mulch if there are only random void areas. Replace whole
Mulch is breaking down or
mulch layer if necessary. Remove the remaining mulch and
has floated away.
replace with triple shredded hard wood mulch at a maximum
depth of four inches.
Determine the extent of the clogging - remove and replace
either just the top layers or the entire media as needed.
Bioretention cell mulch
and media
Soils and/or mulch are
clogged with sediment,
Dispose of the spoil in an appropriate off -site location. Use
triple shredded hard wood mulch at a maximum depth of four
inches. Search for the source of the sediment and remedy the
problem if possible.
An annual soil test shows
that pH has dropped or
heavy metals have
Dolomitic lime shall be applied as recommended per the soil
test and toxic soils shall be removed, disposed of properly and
accumulated in the soil
replaced with new planting media.
media.
The underdrtfilter
, and
fabric element,
Clogging has occurred.
Wash out the underdrain system.
Clogging has occurred.
Clean out the drop inlet. Dispose of the sediment in a location
where it will not cause impacts to streams or the SCM..
outlet system
The drop inlet is damaged
Repair or replace the drop inlet.
Erosion or other signs of
damage have occurred at
Repair the damage and improve the flow dissipation structure.
the outlet.
Discharges from the
bioretention cell are
The receiving water
causing erosion or
Contact the local NCDEQ Regional Office.
sedimentation in the
,receiving water.