Loading...
HomeMy WebLinkAboutNCC205329_Annual Fee NOD Letter_20221216ROY COOPER curemor ELIZABETH S. BISEIL Serre7ary DOUGLAS IL ANSEL krmrn bfrl.rw 12/16/2022 The Drees Homes Company Attn: Jerry Dean 7701 Six Forks Road Raleigh, NC 27615-5050 NORTM CAROLINA ER'AF n MfalQuality Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC205329-2022 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 11/1/2022 and was due on 1211/2022. The annual fee applies to the following construction site: Bloomfield Subdivision, Phase 6, Lot 1 7061 Leando Drive, Willow Springs, NC Wake County Certificate of Coverage No. NCC205329 NC Reference No. NCG01-2020-5329 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Danny Smith at danny.smith@ncdenr.gov or me at toby.vinson@ncdenr.gov. Sincerely, William E. Vinson, Jr. Chief of Program Operations Division of Energy, Mineral, and Land Resources NmhCarnllna Urpanmem eP EnwenrnenealRWllly I Wslm& Energy. Weral and Land P�sdrres SQ North Salisbury 5lrae! 11412 Abil 5ern Cemew I ILeko. Nw4h Cerdin927699-W12 414.7D7.9200