HomeMy WebLinkAboutNCC205232_Annual Fee NOD Letter_20221216ROY COOPER
curemor
ELIZABETH S. BISEIL
Serre7ary
DOUGLAS IL ANSEL
krmrn bfrl.rw
12/16/2022
MPG Arden, LLC
Attn: Martin Fridy
31 Wade Hampton Blvd
Greenville. SC 29609
NORTM CAROLINA
ER'AF n MfalQuality
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC205232-2022
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 11/1/2022 and was due on 1211/2022. The annual fee applies to the following construction site:
83,000sf Retail Development
49 Northridge Commons Parkway, Weaverville, NC
Buncombe County
Certificate of Coverage No. NCC205232
NC Reference No. NCG01-2020-5232
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Danny Smith at danny.smith@ncdenr.gov or me at toby.vinson@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
NmhCarnllna Urpanmem eP EnwenrnenealRWllly I Wslm& Energy. Weral and Land P�sdrres
SQ North Salisbury 5lrae! 11412 Abil 5ern Cemew I ILeko. Nw4h Cerdin927699-W12
414.7D7.9200