HomeMy WebLinkAboutSite Inspection 12.12.22 NC 69 Follow UpWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190210
NCDOT - NC 69 Widening (A-0011C)
Clay
NCDOT - NC 69 Widening (A-0011C)
NC DOT Division 14 - Sylva
12/16/2022
Follow-up
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-83° 49' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
This is a follow up to a non-compliant inspection report issued on December 12, 2022. Follow up photographs were
received on December 12, 2022 with additional correspondence received on December 15, 2022.
Sediment at stations 149+50 LT, 186+50 RT, and 188+00 LT were removed and documented with photographs.
Site is compliant with the 401 WQC.
Please note that deficiencies associated with the channel change (159+00 LT) will still need to be addressed.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190210
12/16/2022
Blazer, Keith
Site Inspection (DOT)Follow-up
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2