Loading...
HomeMy WebLinkAboutSite Inspection 12.12.22 NC 69 Follow UpWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190210 NCDOT - NC 69 Widening (A-0011C) Clay NCDOT - NC 69 Widening (A-0011C) NC DOT Division 14 - Sylva 12/16/2022 Follow-up Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-83° 49' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) This is a follow up to a non-compliant inspection report issued on December 12, 2022. Follow up photographs were received on December 12, 2022 with additional correspondence received on December 15, 2022. Sediment at stations 149+50 LT, 186+50 RT, and 188+00 LT were removed and documented with photographs. Site is compliant with the 401 WQC. Please note that deficiencies associated with the channel change (159+00 LT) will still need to be addressed. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 12/16/2022 Blazer, Keith Site Inspection (DOT)Follow-up Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2