HomeMy WebLinkAboutNCC213962_NOT Closeout Documents_20221215HENDERSON COUNTY SITE DEVELOPMENT DEPARTMENT
240 SECOND AVENUE EAST
HENDERSONVILLE, NC 28792
(828) 694-6553
December 9, 2022
The Cottages at Windy Knoll, LLC
Attn: Rick Moore
103 McDowell Rd
Mills River, NC 28759
RE: Project Name: The Cottages at Windy Knoll
Project ID: SESC 2018-06-01
County: Henderson
Please see the attached Final Site Inspection Report for The Cottages at Windy Knolls project. The
project is in compliance and released under SPCA. Termination of coverage under the NPDES General
Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a
Notice of Termination (NOT). Please feel free to contact us at your convenience if you have any
questions.
Sincerely,
Deb Johnston, PE
Assistant Engineer Site Development
Enclosures: Sedimentation Inspection Report
Henderson County (Unicorporated Areas)
240 SecondAvenue East, Suite 118, Hendersonville, NC 28792
County: Henderson Co. Project: Cottages at Windy Knoll
River basin: French Broad River
Person financially responsible: The Cottages at Windy Knoll, LLC Project # SESC 2018-06-01
Address: 103 McDowell Road, Mills River, NC 28759 Case # n/a
1. Project location: 99999 N. Allen Road
Pictures: No: ❑ Yes: 0 Video: ❑ Digital: 0 Other:❑
2. Weather and soil conditions: 40 degrees, cloudy, wet conditions
3. Is site currently under notice of violation? Yes: ❑ No: 0
4. Is the site in compliance with S.P.C.A. and rules? Yes: ED No: ❑
5. Violations:
❑a. No approved plan, G.S. 113A-57 (4) and 15A N.C.A.0 413.0107(c)
❑ b. Failure to follow approved plan, G.S. 113A-57(5)
❑ c. Failure to submit revised plan, G.S. I I3A-54.1(b) and
15A N.C.A.C. 413.0118(a)
❑d. Failure to provide adequate groundcover, G.S. 113A-57(3) and
15A N.C.A.C. 413.0107(b)
❑ e. Insufficient measures to retain sediment on site, G.S. 113A-57(3)
❑ f. Failure to take measures to protect property, 15A N.C.A.C. 413.0105
6. Potential NPDES Permit Violation under NCG 010000? Yes: ❑ No:O
❑ m. Failure to manage construction site pollutants, NCG 010000 Sec. 11, 13.1
p n. Failure to provide ground stabilization, NCG 010000 Sec. 11, 132
❑ o. Failure to maintain the rain gauge or record daily rainfall, NCG 010000
Sec. 11, B.1(ab)
❑ p. Failure to meet self -inspection and reporting requirements,
NCG 010000 Sec. II, B.1(c-i)
First inspection: Yes: ❑ No: ❑✓
❑ g. Inadequate buffer zone, G.S. 113A-57(1)
❑ h. Graded slopes and fills too steep,
G.S. 113A-57(2) or 15A N.C.A.C. 4B.0124(e)
❑i. Unprotected exposed slopes, G.S. 113A-57(2)
ED j. Failure to install and maintain measures,
15A N.C.A.C. 4B.0113
❑k.Failure to self -inspect G.S. I I3A-54.1(e) and 15A
N.C.A.C. 413.0131
❑ 1. Other (describe)
Not Applicable: ❑
❑ r. Failure to have approved plan and NPDES
permit on site, NCG 010000 Sec. III, 3 (d)
❑ s. Failure to install and maintain BMP's,
NCG 010000 Sec. III, 4
❑ t. Failure to operate and maintain control
measures, NCG 010000 Sec. IV, NCG
010000, Sec. IV, 3
❑ q. Failure to dewater sediment basin from surface, NCG 010000 Sec. II, B.4 ❑ u. Bypass of stormwater control facilities,
❑ v. Other (describe)
7. Has sedimentation damage occurred since last inspection or at 11 inspection? Yes: ❑ If yes, where? (check all that apply) NoEl
Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: ❑
Description:
Stormwater Discharge Outfall with sediment loss:
8. Degree of damage: slight: ❑ moderate : ❑ severe :❑
9. Contact made with (name):
Title: N/A
Inspection report given: ❑ or sent: 0 to person financially responsible. Date given/sent: 12-09-2022
10. Corrective actions needed: None needed, at this time.
Report by: Deb Johnston
Date of inspection: 12/05/2022
cc:
Others present: N/A
Time arriving on site: 10:20 am
Time leaving site: 10:35 am
Page 1 of 4
Revised 07-08-2021
240 SecondAvenue East, Suite 118, Hendersonville, NC 28792
County : Henderson Co. project: Cottages at Windy Knoll project # SESC 2018-06-01
9. Corrective actions needed (continued)
E3 Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed.
0 Install all sedimentation and erosion control measures as shown on the approved plan.
C3 Submit a revised sedimentation and erosion control plan for approval for the following areas:
C3 Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the approved
plan, including the following areas:
El Install erosion and sediment control devices sufficient to retain sediment on the tract at the following areas:
0 Install temporary sediment traps or basins and associated diversions as shown on the approved plan, including the following locations:
C3 Install adequate drop inlet protection as shown on the approved plan, including the following locations:
IZI Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25% of the buffer nearer the land
disturbance using natural or artificial means (minimum 25-foot width in Trout Waters) including the following areas:
C3 Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established including the following locations:
C3 For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes where rough or fine
grading has been completed for 21 calendar days, including the following locations:
C3 Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage
including the following locations
❑ Properly handle concrete to avoid contact with surface waters, wetlands or buffers and prevent discharge from site.
0 Relocate soil stockpiles at least 50 feet away from storm drain inlets or surface waters.
0 Provide adequate temporary or permanent ground cover on areas where land -disturbing activity has ceased in 7 or 14 days according to
NCG 01000 permit conditions at the following areas:
❑ Provide sediment basins with a drainage area of one acre or greater with a skimmer or flash board riser.
0 Inspect all erosion and sedimentation control measures and storm discharge outfalls at least weekly and within 24 hours of a rainfall event
of 1 inch or greater and complete self -monitoring reports.
❑ Maintain a rain gauge in good working order and record daily rainfall amounts.
10. Comments: Site is ready for SESC closure.
Revised 07-08-2021
MI Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are
required. Project is released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated.
MI Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are
required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater
Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is
available at: deg.nc.gov/NCGO1. Please note that this correspondence must be uploaded as part of completing the NOT process.
Deb Johnston 12/05/2022 3 4
Report by: Date of inspection: Page of _
Revised 07-08-2021
Inspection Report Photos
u
• J
-
sC �^
✓•r F
Current site conditions. Remove silt fences. Remove excess sediment from inlets and remove inlet protection.
Deb Johnston
Report by:
Revised 07-08,
12/05/2022 4 4
Date of inspection: Page of _