Loading...
HomeMy WebLinkAboutWQCS00005_RSP NOV-2022-DV-0327_20221215WATER MANAGEMENT CITY OF DURHAM Date: December 15, 2022 To: Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office NCDEQ, Division of Water Resources 3500 Barrett Drive Raleigh, N.C. 27609 From: Don Greeley, P.E., P.L.S., Director Subject. NOV-2022-DV-0327, Permit No. WCS00005 City of Durham Collection System, Durham County I LI t 6 received the document addressed to (please print N E) Raleigh Regional Office on Thursday, December 15, 2022. U/l ktLd - Signature . Date NC Dept of Environmental Quality DEC 15 2622 Raleigh Regional Office 1600 Mist Lake Dr. Durham, NC 27704 919.560.4381 DurhamNC.gov 1 Follow Us @CO o© rhhaamNC WATER MANAGEMENT CITY OF DURHAM City of Durham Department of Water Management 1100 Martin Luther King Jr Parkway Durham, NC 27707 919-560-4344 December 15, 2022 Mr. Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office NCDEQ, Division of Water Resources 3800 Barrett Drive Raleigh, NC 27609 Subject: NOV-2022-DV-0327 Permit No. WQCS00005 Dated: November 14, 2022; Received: December 2, 2022 City of Durham Collection System, Durham County Dear Mr. Vinson, NC Dept of Environmental Quality DEC 15 ?02? Raleigh Regional Office The above referenced letter states that the City of Durham is provided an opportunity to present evidence and justification to demonstrate that the proposed civil penalties for the Notice of Violation (NOV) should not be assessed for the sanitary sewer overflow (SSO) which occurred in the City's sewer collection system between October 1, 2022 and October 31, 2022. For the purposes of supporting the City's position that this event was exceptional, unintentional, temporary, and beyond its reasonable control, the Durham Department of Water Management (DWM) is providing information about the requested incident that occurred during this timeframe. All conditions of the City's Collection System permit are met by the Department, including system cleaning, site visits, inspections, and easement maintenance. Incident# 202202599 - 5 Benwick Court- 10/19/2022 11:15 AM On 10/19/2022 at 11:15 AM, an overflow occurred near 5 Benwick Court releasing an estimated 4,200 gallons of wastewater into an unnamed tributary of Little Creek. Crews discovered a pipe failure on the force main just outside the Downing Creek Lift Station as the cause of the overflow. Our Lift Station Maintenance (LSM) staff make weekly inspections of the lift station and noted no signs of the pipe failure in the inspection 2 days prior. LSM staff used a bypass pump to stop the flow while City contractors were brought in to make the infrastructure repairs to the force main. After assessing the extent of the spill, crews dammed the downstream creek with sandbags, set up pumps to pump the untreated wastewater back into the collection system, and flushed the area using a nearby hydrant (dechlorinated water). Page 2 of 3 Department staff conducted ammonia testing along the downstream marshland areas to help determine the spill's extent. No visible adverse environmental impacts or hazards to persons or property were observed. Crews have observed no lasting effects to persons, property, or the environment during the following weekly inspections completed at the lift station. A news release was issued within the 24-hour window. The cost to remediate this spill was $ 51,604.46. Ongoing City -Wide Measures to Reduce the Occurrence of SSOs The City has several programs in place to prevent and reduce the occurrence of SSOs. The City has implemented a Collection System Management, Operations & Maintenance (CMOM) plan that expands and enhances its existing programs. ■ System Flushing and Inspection: The City routinely contracts cleaning, CCTV inspection, smoke testing, and manhole inspections of portions of the sewer collection system. The City completes the inspection of the collection system systematically based on City defined geographical basins. The City ensures the requirements of the collection system permit are met by deploying City crews to clean at least 10% of the collection system annually with a goal of exceeding the requirement by 2% to 5% each year. The City measures the cleaning on a fiscal year basis starting July 1. As of October 31, 2022, 1.76% of the City's collection system had been cleaned by City staff and contractors. Sewer Rehabilitation Program: The City has an active Sewer Rehabilitation Program. The program includes flow monitoring (25 permanent monitors), CCTV inspection, manhole inspection, easement mowing, field inspections and investigations, point repairs, line replacement, root and grease abatement and cured -in -place manhole and line rehabilitation. There are four full-time equivalents (FTEs) employees dedicated to the City's system rehabilitation programs in the Utility Engineering Division of DWM. This workgroup handles flow monitoring and system data management and contract preparation, administration, and inspections. There are 21 FTEs in the City's Collections Systems Maintenance (CSM) workgroup in the Water and Sewer Maintenance (WSM) Division of DWM. This group performs CCTV inspections, hydraulic cleaning activities, mowing, manhole inspections, and manhole repairs. They respond to all reported concerns including blockages and overflows. In addition, the CSM crews are supported by the Excavation Services workgroup of WSM who perform identified point repairs, line replacements, and cured -in -place lining. In 2018, the department established the Lift Station Maintenance Division (LSM) to focus on oversight and maintenance of the 63 lift stations throughout the service area and the 136 air relief valves (ARVs) in the system. This workgroup of 21 FTEs conducts required daily, weekly, monthly, and annual inspections and associated preventive maintenance activities. The City spends more than $5,000,000 on Sewer Rehabilitation projects annually as a part of its Capital Improvements Programs. Fats, Oils, and Grease Program (FOG): The department's FOG education and outreach effort is conducted by three FTEs (staff shared between the Industrial Pretreatment, Septage and FOG Programs). In addition to working with the Durham County Health Department, staff routinely inspect over 800 food service establishments (FSEs) annually to ensure appropriate cleaning and maintenance of grease interceptors. Staff participate in several community events, such as Earth Day, Center Fest and Bimbe, as well as neighborhood meetings. Department staff deliver residential Fat Trappers to increase awareness of the proper disposal methods for waste. FOG staff also conducts post-SSO follow-up education and enforcement as necessary. The City invests over $50,000 per year in advertising the proper disposal of FOG on television. Staff post to the City's quarterly newsletter, The Durham Digest, along with multiple mentions in the City Manager's Report known as City Connect, to reach a broad range of Durham residents. Page 3 of 3 Summary: Based upon the documented information provided above regarding this incident, the City believes that this SSO was exceptional, unintentional, temporary, and caused by factors beyond the City and Department's control. The City actively manages, operates, and maintains its system in such a manner as to meet or exceed all the requirements of the Collection System permit. As detailed above, the City systematically inspects, flushes, and rehabilitates its wastewater collection system. The Department also actively works to educate the community regarding what should and should not be discharged into the City's sewer collection system. The department staff welcomes the opportunity to meet with you and your staff to review our program and discuss constructive ways to improve what we are already doing in the City of Durham. If you have any questions or need any additional information please do not hesitate to contact me at (919) 560-4381 or via email at Don.Greelev@durhamnc.eov. Sincerely, Donald F. Greeley Director Attachments c: Jason Robinson, DEQ— Water Quality Regional Operations Section, Raleigh Regional Office Junior Mobley, Superintendent, Water & Sewer Maintenance Scott Smart, Assistant Director Jerry Morrone, Utility Engineering Manager, Sr. NC Dept of Environmental Quality State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources Division of Water Resources DEC 15 RCotlection System Sanitary Sewer Overflow Reporting Form Form CS-SSO PART I: Raleigh Regional Office This form shall be submitted to the appropriate DW R Regional Office within five business days of the first knowledge of the sanitary sewer overflow (SSO). Permit Number: WQCS00005 (WQCS# if active, otherwise use WQCSD#) Facility: Downing Creek Force Main Incident #: Owner: City of Durham Region: Raleigh City: Durham County: Durham Source of SSO (check applicable): ❑ Sanitary Sewer ® Pump Station / Lift Station SPECIFIC location of the SSO (be consistent in description from past reports or documentation - i.e. Pump Station 6, Manhole at Westall & Bragg Street, etc.): Force Main broke at the Downing Creek Lift Station Property, Fore Main Asset ID #00038, broke at a 90 degree joint Manhole #: Latitude (degrees/minute/second): Longitude (degrees/minute/second): Incident Started Dt: 10-19-2022 Time: 11:15AM Incident End Dt: 10-19-2022 Time: 12:15PM (mm-dd-yyyy) (hh:mm) AM/PM (mm-dd-yyyy) (hh:mm) AM/PM Estimated volume of the SSO: 4,200 gallons Estimated Duration (round to nearest hour): 1.0 hour(s) Describe how the volume was determined: Lift Station ran 7 times at 3 minutes each time, GPM 200 X 21 MIN. _ 4,200gal Weather conditions during the SSO event: Clear Did the SSO reach surface waters? ® Yes Volume reaching surface waters: 4,200 gallons ❑ No ❑ unknown Surface water name: Little Creek Watershed Did the SSO result in a fish kill? ❑ Yes ® No ❑ unknown If Yes, what is the estimated number of fish killed? SPECIFIC cause(s) of the SSO: ❑Severe Natural Conditions ❑ Grease [—]Pump Station Equipment Failure ❑ Power Outage [--]Other (Please explain in Part II) ❑Roots ❑Inflow & Infiltration []Vandalism ❑ Debris in line ®Pipe Failure (Break) 24-hour verbal notification (name of person contacted): Curtis Tyree ®DWR []Emergency Management Date (mm-dd-yyy): 10-20-2022Time: (hh:mm AM/PM): 8:25AM Per G.S. 143-215.1 C(b), the owner or operator of any wastewater collection system shall: In the event of a discharge of 1,000 gallons or more of untreated wastewater to the surface waters of the State, issue a press release to all print and electronic news media that provide general coverage in the county where the discharge occurred setting out the details of the discharge. The press release shall be issued within 24 hours after the owner or operator has determined that the discharge has reached surface waters of the State. In the event of a discharge of 15,000 gallons or more of untreated wastewater to the surface waters of the State, publish a notice of the discharge in a newspaper having general circulation in the county in which the discharge occurs and in each county downstream from the point of discharge that is significantly affected by the discharge. The Regional Office shall determine which counties are significantly affected by the discharge and shall approve the form and content of the notice and the newspapers in which the notice is published. WHETHER OF NOT PART II IS COMPLETED, A SIGNATURE IS REQUIRED SEE PAGE 13 Form CS-SSO Page 1 Severe Natural Conditions hurricane tornado etc. Describe the "severe natural condition" in detail: How much advance warning did you have and what actions were taken in preparation for the event? Comments: Form CS-SSO Pagc Roots Do you have an active root control program on the line 1 area in question? ❑ Yes ❑ No Describe: Have cleaning and inspections ever been increased at this location because of roots? ❑ Yes ❑ No Explain: What corrective actions have been accomplished at the SSO location (and surrounding system if associated with the SSO)? What corrective actions are planned at the SSO location to reduce root intrusion? Has the line been smoke tested or videoed within the past year? ❑ Yes ❑ No If Yes, when? Comments: ®NA ❑ NE ®NA ❑ NE RR Mm Form CS-SSO Fags 6 Pump Station Equipment Failure (Documentation of testing records, etc should be provided upon request) What kind of notification/alarm systems are present? Auto-dialer/telemetry (one-way communication) ❑ Yes Audible ® Yes Visual ® Yes SCADA (two-way communication) ® Yes Emergency Contact Signage ® Yes Other ❑ Yes If Yes, explain: Describe the equipment that failed: No Failure at the Lift Station What kind of situations trigger an alarm condition at this station (i.e. pump failure, power failure, high water, etc.)? Were notification/alarm systems operable? ® Yes ❑ No ❑NA ❑ NE In no, explain: If a pump failed, when was the last maintenance and/or inspection performed? What specifically was checked/maintained? If a valve failed, when was it last exercised? Were all pumps set to alternate? ❑ Yes ❑ No ❑NA ❑ NE Did any pump show above normal run times prior to and during the SSO event? ❑ Yes ® No ❑NA ❑ NE Were adequate spare parts on hand to fix the equipment Was a spare or portable pump immediately available? If a float problem, when were the floats last tested? How? If an auto -dialer or SCADA, when was the system last tested? How? Comments: manually tested every week ® Yes ❑ No ❑NA ❑ NE ® Yes ❑ No ❑NA ❑ NE Form CS-SSO Pa7c Vandalism Provide police report number: Was the site secured? ❑ Yes ❑ No If Yes, how? Have there been previous problems with vandalism at the SSO location? If Yes, explain: What security measures have been put in place to prevent similar ❑ Yes ❑ No occurrences in the future? Comments: ❑NA ❑NA ❑ NE ❑ NE Form CS-SSO Page 10 Other pictures and police report, as applicable, must be available upon request.) Describe: Were adequate equipment and resources available to fix the problem? If Yes, explain: If the problem could not be immediately repaired, what actions were taken to lessen the impact of the SSO? Comments: ❑ Yes ❑ No ❑NA ❑ Yes ❑ No ❑NA ❑ NE ❑ NE Form CS-SSO Page 12 System Visitation ORC Backup Name: George Kepic Certification Number: 995866 Date visited: 10-19-2022 Time visited: 12:20pm How was the SSO remediated (i.le. Stopped and cleaned up)? ❑ Yes ® Yes Lift Station was turned off and we colsed the force main valve. set up a bypass pump, bypassing the broken section of force main and opened the bypass valve a head of the brake and pumped the lift station wet well while the contractor made the repair. City Crews traced how far the sanitary sewer went and set out a pump and pued the sewer back into the Collection system while we flushed the tributary. As a representative for the responsible party. I certify that the information contained in this report is true and accurate to the best of my knowledge. Person submitting claim: Kenny Willard Date: 11-8-2022 Signat Title.., — Telephone Number: 9/4)_ S& Any additional information desired to be submitted should be sent to the appropriate Division Regional Office within five business days of first knowledge of the SSO with reference to the incident number (the incident number is only generated when electronic entry of this form is completed, if used). Form CS-SSO Page 14 ly-j o La o CL >-x un . N6 -. ,''` ti --*