Loading...
HomeMy WebLinkAbout20221325 Ver 1_More Info Received_20221207From: Williams, Kim To: Snider, Holley Cc: Henson, Scarlett; thomas.D.charlesCThusace.armv.mil; Elks, Katharine B SAW; Matthew Payne; Matthew Hook Subject: [External] Re: Richlands Forest DWR#20221325 & SAW#2022-01279 Date: Wednesday, December 7, 2022 9:18:32 AM Attachments: Richlands Forest Site Plans Rev 12-5-22.Ddf Richlands Forest Impact Tables Rev 12-05-22.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Holley Attached are revised site plan drawings and impact table for Richlands Forest. The drawings include the following revisions. • The site plan now includes an additional crossing into Phase 2 of the development (Impact D) and shows the proposed lot layout for Phase 2. • Underdrains have been added to Crossings B & C to maintain a hydrologic connection to wetlands on either side. These underdrains are 4" perforated pipes. This is a flat site with little to no hydraulic flow. The underdrain design allows water to pass through the perforated pipe and will mimic the wetland hydrology more closely than a single pipe. Additionally, placing larger pipes under these roads would require raising the roadbeds, which would result in additional wetland impacts. • The engineer reduced the width of Crossings A & B (road shoulders reduced from 8' to 6') and removed the riprap at Crossing A2 (determined not to be needed), which reduced wetland impacts. • The impact at Crossing C was also reduced since it was determined that no additional impact beyond the silt fence would be needed (original plan showed 2' beyond silt fence as being disturbed). This crossing includes both a 4" perforated pipe and a gravel layer as the hydrologic connection. Note that this is an emergency access road only and will be placed at grade. The placement of the underdrain is to allow water to pass through the soils. However, during flood events, the road will be overtopped. • Overall impacts are now 0.403 acre, which is less than what was originally proposed (0.436 ac). • To mitigate these impacts, the applicant proposes purchasing 0.8 acre of non -riparian wetland credits from the Bachelors Delight Mitigation Bank. Please review at your convenience and let me know if you have any questions. Also let me know if I need to submit the drawings and table via your interim portal and I would be happy to do that. Thanks! Kim On Tue, Nov 29, 2022 at 2:34 PM Williams, Kim <Kim.Williams@davey.com> wrote: Hi Holley Thanks for your comments. Yes- the applicant decided they want to move forward with Phase 2 of the project, which will require one additional crossing. The engineer also determined that they can narrow the other proposed crossings, so overall impacts are less than previously proposed. I will coordinate with the engineer to get you updated plans that also address your comment about the culverts. Thanks! Kim On Tue, Nov 29, 2022 at 1:35 PM Snider, Holley <holley.snider@ncdenr.gov> wrote: Good afternoon Kim, The DWR has reviewed the above referenced project and the information contained in the application lacks the information necessary to ensure that the project design has avoided and minimized impacts to surface waters and wetlands to ensure any remaining surface waters or wetlands, and any surface waters or wetlands downstream, continue to support existing uses during and after project completion, in accordance 15A NCAC 02H .0506 (b)(1). Specifically the wetlands crossings B & C have not been designed with pipes to ensure the hydrologic connectivity of the wetlands is maintained. As proposed the road and associated wetland fill will sever connectivity in the wetlands and therefore is not consistent with the wetlands standards found in 15A NCAC 02B .0231. Additionally discussions with your staff indicate the scope of the project is changing and additional impacts may be proposed that are not presented in this permit application. The DWR is placing the project on hold until the above requested information is provided. Any updated impact maps and associated application documents should also be submitted that demonstrate the full scope of work proposed. Please feel free to call or email me if you have any questions. Sincerely, Holley Snider . • , • ,><((((°>• , • „••><((((°>• • Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 b E W 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties PROGRESS PLOT DATE: 12-03-2022 SITE INFORMATION: LOCATION: COW HORN RD COUNTY: ONSLOW PARENT PIN: 033395 54-56 DB/PG: DB 1150, PG 388 ZONING: R-15 ACREAGE: ACREAGE TRACK 1: 4,064,284 SF (93.30 AC) ACREAGE TRACK 2: 6,207,934 SF (142.51 AC) TOTAL ACREAGE: 10,272,218 SF (235.81 AC) LAND CLASS: MINIMUM BUILDING SETBACKS: FRONT YARD: SIDE YARD: REAR YARD: CORNER YARD: RESIDENTIAL 20' 8' 15' 20' RIGHT OF WAY & OTHER AREAS: NATURAL WETLANDS: 3,061,898 SF (70.29 AC) LOT ACREAGE: TOTAL NUMBER PROPOSED LOTS: TOTAL ALLOWABLE LOTS : PROPOSED DENSITY: MINIMUM PROPOSED LOT SIZE: MAXIMUM PROPOSED LOT SIZE: AVERAGE PROPOSED LOT SIZE: MINIMUM ALLOWABLE LOT WIDTH: MINIMUM PROPOSED LOT WIDTH: IMPERVIOUS AREAS: ROADWAYS / PARKING: LOTS (3,600 SF/LOT): TOTAL ON -SITE IMPERVIOUS AREA: TOTAL ON -SITE IMPERVIOUS PERCENT: 407 LOTS 598 LOTS 1.73 DU/AC 7,200 SF 24,484 SF (LOT 98/TRACT 2) 8,896 SF 60' 60' 492,320 SF (11.30 AC) 1,465,200 SF (33.64 AC) 1,957,520 SF (44.94 AC) 19.06% OPEN SPACE: OPEN SPACE AREA: 2,626,960 SF (60.31 AC) STREET TYPE SUMMARY: 50' ROW SECTION: 19,985 LF TOTAL PERMANENT WETLAND IMPACT - TRACT 1 & 2 (SF) 17,564 SF (0.403 ac) VICINITY MAP SHEET INDEX 01 E-1 COVER SHEET 02 E-2 OVERALL IMPACT MAP - TRACT 1 03 E-3 OVERALL IMPACT MAP - TRACT 2 04 E-4 IMPACT AREA "A" 05 E-5 IMPACT AREA "A" 06 E-6 IMPACT AREA "B" 07 E-7 IMPACT AREA "B" 08 E-8 IMPACT AREA "C" 09 E-9 IMPACT AREA "C" 10 E-10 IMPACT AREA "D" 11 E-11 IMPACT AREA "D" STRONGRCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN COVER SHEET E-1 01 OF 11 REVISION : SCALE: HORZ 1:1000 PROGRESS PLOT DATE: 12-03-2022 IMPACT AREA "A" 0 0 o�Z 133 �l r Z� C 1 'A 'A .\ 0 co On T • 7p Z. TOTAL PERMANENT WETLAND IMPACT - TRACT 1 (SF) 16,318 SF (0.375 ac) LEGEND: SF/LD WTLD EXISTING ADJOINER PROPERTY LINE ROADWAY CENTER LINE PROPOSED LOT LINE EX. MAJOR CONTOURS EX. MINOR CONTOURS SILT FENCE/ LIMITS OF DISTURBANCE EXISTING WETLAND LINE WETLAND AREA PERMANENT WETLAND IMPACT 01 )( N r OW OR FORMERLY, / / - l \/ \. r / U `' J ^ V DONALD R. & KATHY I. SWINGLERr IMPACT AREA "B" ONWASA PUMP STATION PARCEL (TO BE \ PIN No. 051054 < DEEDED TO ONWASA AT FINAL PLAT) DEED BOOK 1627 PAGE 753 PLAT BOOK 56 PAGE 225 i 10.03 ACRES TO BE DEDICATED TO DANIEL & VICTORIA CARROLL IN PLAT RECOMBINATIO to �o i / �o N6W OR FORMERLY DANIEL &VICTORIA CARROLL ))\J /PIN No. 003610 DEED BOOK 5366 PAGE 741 NON -JURISDICTIONAL PONI \ I / 1' ROPERTY BOUNDARY (TYP.) °'A > - -� NOW OR'FORMERLY J DONALD R. & KATHY I. SWINGLER 1 6 1 \ PIN No. 032414 DEED BOOK 4812 PAGE 082 ' , ~v� PLAT BOQK 75 PAGE 20 ILT FENCE/ LIMITS OF DISTURBANCE (TYP.) OQ p4-3 ) ti O44�5� otio 0'• Q � et` �o• 9�� 5 / .ice czy, 20' FIRE ACCESS ROAD IMPACT AREA "C" ,/• J�1 <o N Yoe O�\ ° oAFoeeo r� opR�SoRMF o f ol�4rpior63•<gR<Y N°p782jA'� NG4 �) r lgccF Y0 \ 603 741 �� VA `4\ 2 STRONGROCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN OVERALL IMPACT MAP - TRACT 1 E-2 02 OF 11 REVISION : SCALE: HORZ 1:300 PROGRESS PLOT DATE: 12-03-2022 TOTAL PERMANENT WETLAND IMPACT - TRACT 2 (SF) 1,246 SF (0.028 ac) LEGEND: SF/LD WTLD EXISTING ADJOINER PROPERTY LINE ROADWAY CENTER LINE PROPOSED LOT LINE EX. MAJOR CONTOURS EX. MINOR CONTOURS SILT FENCE/ LIMITS OF DISTURBANCE EXISTING WETLAND LINE WETLAND AREA PERMANENT WETLAND IMPACT lir --\\--/� �J1 �1� 1 \ J y 1 n / ri } `i`l l�r,_ �. / /t r Mq 1�[O '\ `� ,,;((� igV -, ✓ L,,))-` (..✓7/ v \ sk, g7 mom � / L 1. I mi En ) A IMPACT AREA "D" N" — L., ,.._ . lin ii l I r r7 C ° ° 2/7 Jof0 AC\° /////I J JJ Ilf � c STRONGROCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN OVERALL IMPACT MAP - TRACT 2 E-3 03 OF 11 REVISION : SCALE: HORZ 1:400 PROGRESS PLOT DATE: 12-03-2022 III 1 1 PERMANENT WETLAND — IMPACT AREA (363 SF) CO SF/ CO _A - \I WETLAND (\ WETLAND \O ),e'11 SILT FENCE/ LIMITS OF DISTURBANCE (TYP. OzzM PLAN VIEW - IMPACT AREA "A" HORIZONTIAL: 1" = 50' WETLAND 11.r<O r- 0 I-/LD WETLAND PERMANENT WETLAND IMPACT AREA (1,628 SF) V LEGEND: SF/LD WTLD EXISTING ADJOINER PROPERTY LINE ROADWAY CENTER LINE PROPOSED LOT LINE EX. MAJOR CONTOURS EX. MINOR CONTOURS PROP. MAJOR CONTOURS PROP. MINOR CONTOURS SILT FENCE/ LIMITS OF DISTURBANCE EXISTING WETLAND LINE WETLAND AREA PERMANENT WETLAND IMPACT PERMANENT WETLAND IMPACT (SF) 1,991 SF STRONGROCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "A" E-4 04 OF 11 REVISION : SCALE: HORZ 1:50 PROGRESS PLOT DATE: 12-03-2022 60 55 — 50 — 45 40 PROPOSED GRADE NCDOT- HEADWALL NCDOT HEADWALL 37 LF 24" CLASS IV RCP @ 0.50% EXISTING GRADE 60 — 55 — 50 — 45 O O co cc) O O O 40 -0+50 0+00 0+50 1+00 1+50 PROFILE VIEW - IMPACT AREA "A" HORIZONTIAL: 1" = 50'; VERTICAL: 1" = 5' STRONGRCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "A" E-5 05 OF 11 REVISION : SCALE: HORZ 1:50; VERT 1:5 PROGRESS PLOT DATE: 12-03-2022 SILT FENCE/ LIMITS OF DISTURBANCE (TYP.) MARSHWOOD STREET SF/LD s) I �o \ ``j / \ / / PERMANENT WETLAND / IMPACT AREA (9,589 SF) o � WTL PLAN VIEW - IMPACT AREA "B" HORIZONTIAL: 1" = 50' -PROPERTY BOUNDARY (TYP.) LEGEND: SF/LD WTLD EXISTING ADJOINER PROPERTY LINE ROADWAY CENTER LINE PROPOSED LOT LINE EX. MAJOR CONTOURS EX. MINOR CONTOURS PROP. MAJOR CONTOURS PROP. MINOR CONTOURS SILT FENCE/ LIMITS OF DISTURBANCE EXISTING WETLAND LINE WETLAND AREA PERMANENT WETLAND IMPACT PERMANENT WETLAND IMPACT (SF) 9,589 SF STRONGRCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "B" E-6 06 OF 11 REVISION : SCALE: HORZ 1:50 PROGRESS PLOT DATE: 12-03-2022 60 55 50 45 40 EXISTING GRADE y 20' EOP 2% 2% PROPOSED GRADE 48.03 MATCH EXISTING: 26 LF 4" PERFORATED 48.35 - PIPE @ 0.00%- -MATCH EXISTING: 48.88 I 48.22 1,-- co 0 Lo I 48.00 -0+50 0+00 0+50 1+00 PROFILE VIEW - IMPACT AREA "B" HORIZONTIAL: 1" = 50'; VERTICAL: 1" = 5' 60 55 50 45 40 1+50 STRONGRCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "B" E-7 07 OF 11 REVISION : SCALE: HORZ 1:50; VERT 1:5 PROGRESS PLOT DATE: 12-03-2022 WETLAND PERMANENT WETLAND IMPACT AREA (2,161 SF) H WETLAND PLAN VIEW - IMPACT AREA "C" HORIZONTIAL: 1" = 50' / \ ILT FENCE/LIMITS OF DISTURBANCE (TYP.) 20' FIRE ACCESS ROAD LEGEND: SF/LD WTLD EXISTING ADJOINER PROPERTY LINE ROADWAY CENTER LINE PROPOSED LOT LINE EX. MAJOR CONTOURS EX. MINOR CONTOURS PROP. MAJOR CONTOURS PROP. MINOR CONTOURS SILT FENCE/ LIMITS OF DISTURBANCE EXISTING WETLAND LINE WETLAND AREA PERMANENT WETLAND IMPACT PERMANENT WETLAND IMPACT (SF) 2,161 SF STRONGROCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "C" E-8 08 OF 11 REVISION : SCALE: HORZ 1:50 PROGRESS PLOT DATE: 12-03-2022 60 55 50 45 40 MATCH EXISTING: 49.63 EXISTING GRADE 20' PROPOSED GRADE MATCH EXISTING: 49.74 1 1/2" S9.5B 8" ABC OR STBC, TYPE B 12" EARTH COVER 16" X 16" COARSE AGGREGATE WRAPPED IN FILTRATION GEOTEXTIL 6" 19 LF 4" PERFORATED PIPE @ 0.00% N 0) r 0) -0+50 0+00 0+50 1+00 PROFILE VIEW - IMPACT AREA "C" HORIZONTIAL: 1" = 50'; VERTICAL: 1" = 5' 60 55 50 45 40 1+50 STRONGR CK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "C" E-9 09 OF 11 REVISION : SCALE: HORZ 1:50; VERT 1:5 PROGRESS PLOT DATE: 12-03-2022 ILU _, = 8+00 1 38+51 MARSHWOOD STREET PROPERTY BOUNDARY (TYP.) �1�0 Wrt SF I\D El SILT FENCE/ LIMITS OF � \c3PERMANENT WETLAND DISTURBANCE (TYP.) `IMPACT AREA (3,823 SF) WTLD ----- \\.„..„), WETLAND PLAN VIEW - IMPACT AREA "D" HORIZONTIAL: 1" = 50' TRACT 2 r- 6 T LEGEND: SF/LD WTLD EXISTING ADJOINER PROPERTY LINE ROADWAY CENTER LINE PROPOSED LOT LINE EX. MAJOR CONTOURS EX. MINOR CONTOURS PROP. MAJOR CONTOURS PROP. MINOR CONTOURS SILT FENCE/ LIMITS OF DISTURBANCE EXISTING WETLAND LINE WETLAND AREA PERMANENT WETLAND IMPACT PERMANENT WETLAND IMPACT (SF) 3,823 SF STRONGROCK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "D" E-10 10 OF 11 REVISION : SCALE: HORZ 1:50 PROGRESS PLOT DATE: 12-03-2022 60 55 — 50 — 6' HEA EXISTING GRADE MATCH EXISTING: 49.00 SHOULDER NCDOT DWALL 20' EOP 2% 2% 6' SHOULDER PROPOSED GRADE NCDOT HEADWALL 60 — 55 — 50 35 LF 15" CLASS IV RCP @ 0.50% 45 — — 45 40 rn co -0+50 0+00 40 1+00 1+50 PROFILE VIEW - IMPACT AREA "D" HORIZONTIAL: 1" = 50'; VERTICAL: 1" = 5' STRONGR CK ENGINEERING GROUP STRONG ROCK ENGINEERING GROUP, PLLC COMPANY LICENSE # P-2166 6801 FALLS OF NEUSE RD. SUITE 108 RALEIGH, NC 27615 JOSH@STRONGROCKENGINEERING.COM RICHLANDS FOREST - PLANNED RESIDENTIAL DEVELOPMENT - PHASE ONE CONCEPT PLAN AND PRELIMINARY PLAN IMPACT AREA "D" E-11 11 OF 11 REVISION : SCALE: HORZ 1:50; VERT 1:5 Richlands Forest Wetland Impacts (Rev 12-5-22) 2. Wetland Impacts 2a. Site # 2a1 Reason 2b. Impact Type 2c. Type of Wetland 2d. W Name 2e. Forested 2f. Type of Jurisdiction 2g. Impact area Al Road Crossing P Non-Riverine Swamp Forest Al Yes Both 0.008 A2 Road Crossing P Non-Riverine Swamp Forest A2 Yes Both 0.037 B Road Crossing P Non-Riverine Swamp Forest B Yes Both 0.22 C Road Crossing P Non-Riverine Swamp Forest C Yes Both 0.05 D Road Crossing P Non-Riverine Swamp Forest D Yes Both 0.088 TOTAL 0.403