HomeMy WebLinkAboutSW6220202_Supplement-EZ Form_20221213 (2)SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
Name
Mject
ject Area acastal
Wetland Area
rface Water Area (a
Messer Parcels
12.25
5 1 Is this project High or Low Density? High
6 1 Does this protect use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks rovided feet
30 ft
8
Will the vegetated setback remain vegetated?
N/A
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration S stem
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
lBayfilter
26
1 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Landon M. Lovelace, PE
28
Or anization:
Underfoot Engineering, inc.
29
Street address:
1149 Executive Circle, Suite C
30
City, State, Zip:
Cary, NC 27511
31
Phone numbers :
919-576-9733
32
Email:
Iovelace@underfootengineering.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Signature of Designer
_ 032674 W
= r CJ
2022.11.28
Seal I Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this roiect have low densit areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
AREA INFORMATION
Entire Site
1
4
T pe of SCM
Wet Pond
Wet Pond
5
Total drainage area (sq ft
533635 sf
423247 sf
6
Onsite drainage area (sq ft
533635 sf
417370 sf
7
Offsite drainage area (sq ft
N/A
5877 sf
8
Total BUA in project (sq ft
157110 sf
158229 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
88200 sf
88200 sf
10permitting)
New BUA not on subdivided lots (subject to
s
68910 sf
68910 sf
11
Offsite BUA (sq ft
N/A
1119 sf
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
none
none
Sidewalk (sq ft
11042 sf
11042 sf
Roof (sq ft
none
none
Roadway s ft
57868 sf
57868 sf
Future (sq ft
none
none
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
none
none
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
none
none
15permitting)
Existing BUA that will remain (not subject to
s ft
none
none
16
Existing BUA that is already permitted (sq ft
none
none
17
Existing BUA that will be removed (sq ft
6494 sf
6494 sf
18
Percent BUA
29%
37%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
23088 cf
21
Calculation method for design volume
Simple Method
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
WET POND
area number
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC 9 ?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
Yes
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
151
Is there an O&M Plan that complies with General MDC 12 ?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
260.50
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
261.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
266.00
23
Elevation of the permanent pool (fmsl)
266.50
24
Elevation of the top of the vegetated shelf (fmsl)
267.00
25
Elevation of the temporary pool (fmsl)
267.75
26
Surface area of the main permanent pool (square feet)
13739
27
Volume of the main permanent pool (cubic feet)
53262 cf
28
Average depth of the main pool (feet)
4.00 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
542.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
32
Volume of the forebay (cubic feet)
10119 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
66 in
351
Design volume of SCM (cu ft)
23088 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
2.0 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
4.11
41
Are the inlet(s) and outlet located in a manner that avoids short-
arcuitin ?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
43
Depth of forebay at entrance (inches)
74 in
44
Depth of forebay at exit (inches)
72 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
ermanent pooI?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Bermuda
54
Hasa plantinq plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 3 5:17 PM 11/15/2022