Loading...
HomeMy WebLinkAbout20221750 Ver 1_Duke Roxboro Station_Self-Certification Package_08012022_Signed_20221213nr of ryFy� 0 �RRCH 1. ti$A9 United States Department of the Project Name FISH AND WILDLIFE SERVICE Raleigh Field Office P.O. Box 33726 Raleigh, NC 27636-3726 Date: 8/2/2022 Self -Certification Letter Duke Energy Roxboro Station Auxiliary Spillway and Dam Improvements Dear Applicant: IF UK s�scsv�c� Interior iT F Thank you for using the U.S. Fish and Wildlife Service (Service) Raleigh Ecological Services online project review process. By printing this letter in conjunction with your project review package, you are certifying that you have completed the online project review process for the project named above in accordance with all instructions provided, using the best available information to reach your conclusions. This letter, and the enclosed project review package, completes the review of your project in accordance with the Endangered Species Act of 1973 (16 U.S.C. 1531-1544, 87 Stat. 884), as amended (ESA), and the Bald and Golden Eagle Protection Act (16 U.S.C. 668-668c, 54 Stat. 250), as amended (Eagle Act). This letter also provides information for your project review under the National Environmental Policy Act of 1969 (P.L. 91-190, 42 U.S.C. 4321-4347, 83 Stat. 852), as amended. A copy of this letter and the project review package must be submitted to this office for this certification to be valid. This letter and the project review package will be maintained in our records. The species conclusions table in the enclosed project review package summarizes your ESA and Eagle Act conclusions. Based on your analysis, mark all the determinations that apply: "no effect" determinations for proposed/listed species and/or ❑ proposed/designated critical habitat; and/or "may affect, not likely to adversely affect" determinations for proposed/listed species and/or proposed/designated critical habitat; and/or 0 "may affect, likely to adversely affect" determination for the Northern long- eared bat (Myotis septentrionalis) and relying on the findings of the January 5, 2016, Programmatic Biological Opinion for the Final 4(d) Rule on the Northern long-eared bat; 0 "no Eagle Act permit required" determinations for eagles. Applicant Page 2 We certify that use of the online project review process in strict accordance with the instructions provided as documented in the enclosed project review package results in reaching the appropriate determinations. Therefore, we concur with the "no effect" or "not likely to adversely affect" determinations for proposed and listed species and proposed and designated critical habitat; the "may affect" determination for Northern long-eared bat; and/or the "no Eagle Act permit required" determinations for eagles. Additional coordination with this office is not needed. Candidate species are not legally protected pursuant to the ESA. However, the Service encourages consideration of these species by avoiding adverse impacts to them. Please contact this office for additional coordination if your project action area contains candidate species. Should project plans change or if additional information on the distribution of proposed or listed species, proposed or designated critical habitat, or bald eagles becomes available, this determination may be reconsidered. This certification letter is valid for 1 year. Information about the online project review process including instructions, species information, and other information regarding project reviews within North Carolina is available at our website http://www.fws.gov. If you have any questions, you can write to us at Raleigh@fws.gov or please contact Leigh Mann of this office at 919-856-4520, ext. 10. Sincerely, /s/Pete Benjamin Pete Benjamin Field Supervisor Raleigh Ecological Services Enclosures - project review package a> H W e O_ y 0 N � N v O 0 N C) ca 1 N Z O U U O N _O U) 0— Cl E U O � W m 0] U -U E w O \ ^ N m m O w ^' 00O L N o�— O �z2 Ua o Bo o 0 A N 70 mar ^ c s O U w v o U O LL X U O N Q y Q O d'OQ o_ O W cz a-+ L 0 4-1 cu (D Q A O Q cn w U s Q N � O O U co V CO LU Q cu CO O O cu w Z Z G (n N m E a) a to (n a) a +� is cu cu cu a)_ o U N O o Y o U cu U Z Z (A 0- Q a a� -a 70 U z m ca cu U_ al)O 2, cu ' _� L O NN Of oLU m cu L N U co N m 2 U Z-0 cu Y cu O cn U O cn L N O ^Q W O cu a) cn D L U N O � to cU m � c 0 cu O 0) Q E O �+ L O cn cu cu .O — N cu cu " N O E E > N O cu C: N cn U CU Q W N O N N O co Cl co �_ 05 United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: Project Code: 2022-0069656 Project Name: Duke Energy Labyrinth Weir August 01, 2022 Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). If your project area contains suitable habitat for any of the federally -listed species on this species list, the proposed action has the potential to adversely affect those species. If suitable habitat is present, surveys should be conducted to determine the species' presence or absence within the project area. The use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys. New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et sea.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered 08/01/2022 species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see https://www.fws.gov/birds/policies-and-regulations.php. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures see https://www.fws.gov/birds/bird-enthusiasts/threats-to- birds.php. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/birds/policies-and-regulations/ executive-orders/e0-13186.php. 08/ov2022 We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • Migratory Birds 08/ov2022 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 08/01/2022 Project Summary Project Code: 2022-0069656 Project Name: Duke Energy Labyrinth Weir Project Type: Dam - Operations Project Description: Construction of a Labyrinth Weir (auxiliary spillway) at the Duke Energy Roxboro Station site. Project Location: Approximate location of the project can be viewed in Google Maps: https: www.google.com/maps/@36.5166193,-79.0063566389214,14z � y+'o fiaulkr►prF,2d }44 �f c Counties: Person County, North Carolina 08/ov2022 Endangered Species Act Species There is a total of 1 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesl, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Insects NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9743 Critical habitats THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. 08/ov2022 Migratory Birds Certain birds are protected under the Migratory Protection Acts. Bird Treaty Act! and the Bald and Golden Eagle Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The gyratory Birds Treater of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. BREEDING NAME SEASON Bald Eagle Haliaeetus leucocephalus This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https:Hecos.fws.gov/ecp/species/1626 Chimney Swift Chaetura pelagica This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Breeds Sep 1 to Jul 31 Breeds Mar 15 to Aug 25 08/ov2022 BREEDING NAME SEASON Eastern Whip -poor -will Antrostomus voci ferns Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 20 and Alaska. Kentucky Warbler Oporornis formosus Breeds Apr 20 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 20 and Alaska. Prairie Warbler Dendroica discolor Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul 31 and Alaska. Prothonotary Warbler Protonotaria citrea Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 10 and Alaska. Rusty Blackbird Euphagus carolinus Breeds This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions elsewhere (BCRs) in the continental USA Wood Thrush Hylocichla mustelina Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. Probability Of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: 1. The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee 08/01/2022 was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season ( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. ■ probability of presence breeding season 1 survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Non-BCCe IIII IIII IIII III IIII IIII IIII'--- IIII IIII IIII IIII Vulnerable Chimney Swift BCC Rangewde — — — - - — — — III IIII IIII IIII IIII IIII ---- ---- ------- (CON) Eastern �_-- __-- ���� ��— Will BCC Rangewide (CON) 08/01/2022 4 Kentucky Warbler -- . — . . . . — BCC Rangewide (CON) Prairie BCC Rangewide -- . — — — — - ---1 IIII IIII III (CON) Prothonotary IIII Warbler I . . . . — IIII IIII IIII — — — - - — — - - — — - - — — - - — — — BCC Rangewide (CON) Woodpecker ---- �'-- — — — - - BCC Ran ide--- (CON) Rusty Blackbird . . . -- . -- — — — — —+++ — — — — — BCC -BCR Wood Thrush BCC Rangewide (CON) Additional information can be found using the following links: • Birds of Conservation Concern https://www.fws.gov/program/migratory-birds/species • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/ collections/avoidin u-and-minimizin u-incidental-take-miuratorv-birds • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.Ddf Migratory Birds FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the list of migratory birds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCQ and other species that may warrant special attention in your project location. 08/01/2022 5 The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL)Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the ale Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). 08/ov2022 Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Lorin. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. 08/ov2022 IPaC User Contact Information Agency: Three Oaks Engineering, Inc. Name: James Mason Address: 324 Blackwell St, Suite 1200 City: Durham State: NC Zip: 27701 Email james.mason@threeoaksengineering.com Phone: 7046048358 Roy Cooper, Governor ■■■■ NC DEPARTMENT OF i■.■■ NATURAL AND CULTURAL RESOURCES 1 ■■■ August 1, 2022 Three Oaks Three Oaks Engineering 324 Blackwell Street Durham, NC 27701 RE: Duke Roxboro Station Labyrinth Weir Dear Three Oaks: D_ Reid Wilson, Secretary Misty Buchanan Deputy Director, Natural Heritage Program N CN H DE-18832 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. A query of the NCNHP database indicates that there are records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. These results are presented in the attached 'Documented Occurrences' tables and map. The attached 'Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is documented within the project area or indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: httl2s://www.fws.ciov/offices/Di rectory/ListOffices.cfm?statecode=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. Also please note that the NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Land and Water Fund easement, or an occurrence of a Federally -listed species is documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rod nev.but Ier(o-)ncdcr.aov or 919-707-8603. Sincerely, NC Natural Heritage Program DEPARTMENT OF NATURAL AND CULTURAL RESOURCES 121 W. JONES STREET, RALEIC.H. NC 27603 • 1651 MAIL SERVICE CEINTEP. RALEIGH. NC 27699 OFC 919.707.9120 • FAx 919.707.5121 \ ) e-Y t = z » / / / / \ 6 ® 2 ^ \ a 2 _ \ \ / \ ^ 2 e r r e g ± O O O \ \ n \ \e/ e/ t_ » « / e \_ � , , % a ~ \ / CD \ / _ G 2 \ \/ 2«\§ 3 =g 2 & 3 / i e /% ©&\9 " \-\\ $ »y > o a a a % e uC [ y/ z 2 e e e E e$ e e / / ® c { \ \ \ u & & & o § e > © ®\ / } ° \ » t e 4/\ j 7 s® t © U U U o e g o»> u e/ C:ID Q) = /\ E rn 2 y)-Cf / ® \ % - ` \ \ \ � \ o \ :5=\ m m .c a = & & % © y //gig g \ \ 2\: s 2 ( ± m ® e ® \ ± w E j Co \\\ / 1-0 \Q`\\ \ \ \ \ 0 ^ ^ ^ y 0 \ { } \ \ fu � y o ofu o % u J / D/\_\ z = 0 - 2 2 : ±G ° m �22 D U } / �\\\\(�/ \ / / \ { f 9 { \ / 2 2 \ [j} t / E / § / / E / / 'CO j \j E < \ \ E ® 0 `/ ® / \U . . gO \ e fu 0 \ \\0 0 \ \\\ e = [/ c \ ate,\ \ ° / / �.\ 00 ( \ \0)/2\ \ \\\U \ 0 / \ \ \ � \ / j / 2 2 « \ \ e \ \ ° , G \\{/ E \ \ \ \ \ \ / s = ue u 2 ELL o.g * a \ CO /6 e t \\D o © y e 2 0\ e E y: \ e \ g @ \ m Co g E ° ± //\ b 4s \ \{\\ / / / \ \ / \ / © / \ 2 \ E y cm/ \/ co 0CL $»C u u u > > 0 y t\ 4 4 e»£ s- 0 \ \ \ \ 4 \ / m -0 ro 0 \ \ / E \ / \ / \ \ / \ \ \ 9 ® %» E° E 2 E% D O e = e o c z s\ E r n z \ \ \ \ e/ o ) / / / / / / T / / / T,� \ \ \ _ ±\ ° a e 7 \ a 7 3 e r m a m m 2 e %E e e r e a e 3 r e 3 e 3 e e e e CD 2 t e t t t e r t t t 0 / / Z / / / / / \ \ \ \ \ \ \ 3® © O O 2 O O O O O 3 O m 2t 2t — 2± £% m % aE e, \ / . / e % / e % ac: e § / e e e 6 / % e e e / % e m e / % e e G % C o , , , , , ± ± o wE Ez2 Ez2 Ez m / / / © / .2 / e = e 7 e m \ � \ \ ± /e e \ E E E E / � 0) � � 0) g \ \ \ \ e j e ƒ Y e Y Y Y e Y Y e Y 9 Y = u 4 » G m & x G & & & x 6 & & » G & & & 2 \\ / \, G a E// c m e g m U U co 4 U m e g U a g e < e m m \/ �� /f/� m / 2 c x o e & & @ / \ Co \ 1 g 0 o 2\ 3/ mr O o J e m o \ 0 3 $ \ e $ $ $ 6 I2 t 0 0 0 \ \ \ 0 0 » 0 0 0 6 0 0 §® Z o s g <e e$ o 3 0 / / 3 0 0 $ 0 6 0 0 6 0 0 \ \ z U 0 / / / (N / / / / (N /E e e e 2 2 2 \ \ 0 e \ 0 0 \ / / / \ \ // \ 3 2 \ ° c \ c \ c \ 2 \ c a m e e g 3 a © s 20 s 20 s 20 2 ± e° y 3% e m e c e c e c s/ j J } \ \\ \\ \ D � \ \/ / //// \ / ƒ /////0 c \ � ) E \ D e\\ E { { { e \ c 2 \ \ / (S E \ \ \ u \ e D ƒ ƒ \ \ ( \ \ \ / 0 / j > / / / \ } e g 9 o m e a/ e 3 y y y \ \ \ \ ° »- = c j j j / \ \ �~ 5 \ \ / \ E \ E.9 0 E } \ © \ \ \ \ 4 \ e E c g 3 % o u '- e> m ' C s± a s= s Lo 6 E E / e 0 E LL E LL \ / \ 0 \ / \ y ƒ % / $ co / \ \ \ co co 9 coa / _@ » ® m 7 7 m 7 \ \ $ ® \ ® \ / � & & a a a a a \ \ \ \ \ \ \ \ cm / / / / / / e ± o 0/ / / . c 6 6 6 6 6 6 5 5 _ s — _ — s — s — s m % % % % % % �\\ \[/�/�/�/�/�\ \ \ \ \ \ \ E E» E E» E //\ \ \\\////////// m \ \ \ \ \ \ r \ 2 CD fu \ \ \ E _ / z \ \ CD \(D <9 5i \ \ \ \ ± ± 2 [ ±2727a D /2 e e % e % % > > © & ± s= s c c ' o e o e e + o O y > s u x y } 7 eg \/\/\\ ƒ u m //% &g 32 23 _\ / \ \ E :E E \C8 ` / \ \y e 4a u } �% elu >y ` .R ± � � C 02Y 2Y2 a[>2\>/ /\ \\ e e Q) 0% e 3 ° > 2 2 > O c/ \ \ /§ _0 \ 2/ 0 / / \ 7 / / f / \ / ^ / 5 (2 \ \ �} \\ e \ E 6 0> / / \e O co?/ � � / 2 E »e / \e 2 c cm � \ E / / \ \ \ 2 2 e / \ ®» ± _ / \ \ \ s e \ ± © } / ( E o / / \ / e = { \ \ 2 \ \ �^ e m/\ 0 2 s Z O= e 3[ ro : \ § § j S y \ \ \ / m > %///\ �E //0 \ ° \ \ \ \ / m § / \ C\ Z I y 2 2 e x x a 2 \/ § \ 2 \ 0 e _ 2 Z U Z Three Oaks Engineering, Inc. 324 Blackwell Street, Suite 1200 Durham, NC 27701 (919) 732-1300 August 2, 2022 Samuel Kees, PE Associate Schnabel Engineering South, PC I IA Oak Branch Drive Greensboro, NC 27407 336.274.9456 skees@schnabel-eng.com SUBJECT: Bald Eagle Survey Memorandum: Duke Energy Roxboro Station —Proposed Auxiliary Spillway Construction and Dam Improvements, Hyco Lake Afterbay Reservoir, Person County, North Carolina. Three Oaks Engineering, Inc. (Three Oaks), as a sub -consultant to Schnabel Engineering South, PC (Schnabel), was contracted to assess habitat and provide survey results for the bald eagle (Haliaeetus leucocephalus) associated with the subject project, and to synthesize the results into a Bald Eagle Survey Memorandum. Schnabel is being contracted by Duke Energy. Please see the following survey report. 1.0 METHODOLOGY The project study area is defined as the limits of disturbance associated with the auxiliary spillway and dam improvement work, as well as the limits of disturbance associated with the proposed project stockpile areas (Figure 1; the existing road is shown as part of the study area on the map but was not considered for this survey since it will remain the same during this project). A review of the United States Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) database on May 10 and August 2, 2022 identified the bald eagle as the only federally protected species associated with the project study area. Therefore, no additional protected species surveys were required for the project. The bald eagle is protected under the Bald and Golden Eagle Protection Act (BGPA), which is enforced by the USFWS. Golden eagles do not nest in North Carolina. Survey data was collected in accordance with BGPA survey protocols. Surveys were completed by Three Oaks staff members Jim Mason, PWS and Nancy Oberle on May 11, 2022. Qualifications of contributors are as follows: Three Oaks Engineering threeoaksengineering.com 0 Principal Investigator: James Mason, PWS Education: B.A. Biology, Colby College, 2000 M.S. Biology/Ecology, UNC-Charlotte, 2004 Experience: Environmental Senior Scientist, Three Oaks Engineering, April 2018-Present Environmental Program Consultant, NCDOT, 2006-2018 Responsibilities: Bald eagle surveys, document preparation Investigator: Nancy Oberle Education: M.E.M. Water Resources, Duke University, 2011 B.S. Environmental Science, University of Delaware, 2006 Experience: Environmental Scientist, Three Oaks Engineering, June 2015-present Environmental Scientist, The Catena Group, April 2012-June 2015 Responsibilities: Bald eagle surveys, document review 2.0 SURVEY RESULTS Habitat for the bald eagle primarily consists of mature forests in proximity to large bodies of open water for foraging. Large dominant trees are utilized for nesting sites, typically within 1.0 mile of open water. A desktop-GIS assessment of the project study area, as well as the area within a 1.0-mile radius of the project limits, was performed on May 10, 2022, using the most recent color aerials. Water bodies large enough or sufficiently open to be considered potential feeding sources were identified. These included the Hyco Lake Afterbay Reservoir and the Hyco River. Since there was foraging habitat within the review area, a survey of the project study area and the area within 660 feet of the project limits was conducted. No bald eagles individuals or nests were observed within the survey area surrounding either the existing dam or the stockpile areas. One adult bald eagle was observed via binoculars across the reservoir from the dam portion of the study area, approximately 1,300 feet away from the edge of the study area. However, this was well outside of the survey limits required for the species. Additionally, no nests were observed in proximity to the adult individual's location. A review of the April 2022 North Carolina Natural Heritage Program (NCNHP) dataset on August 2, 2022, revealed no known occurrences of this species within 1.0 mile of the project study area. A review of the Cornell Lab of Ornithology eBird website revealed observations of adult bald eagles on the reservoir between McGhees Mill Road and the afterbay dam; however, none of these records include identification of a nest. Due to the lack of known nesting occurrences, individuals and nests within the survey area, and minimal impact anticipated for this project, it has been determined that this project will not affect this species. 3.0 REFERENCES Cornell Lab of Ornithology. eBird [Web Application]. https://ebird.org/home. North Carolina Natural Heritage Program. 2022. Natural Heritage Data Explorer, April 2022 Quarterly Dataset [Web Application]. NCDNCR, Raleigh, NC. http://ncnhde.natureserve.org. United States Fish and Wildlife Service. Environmental Conservation Online System (ECOS). https://ecos.fws.gov/ecp/. United States Fish and Wildlife Service. Information for Planning and Consultation (IPaC). https://ipac.ecosphere.fws.gov. Three Oaks Engineering threeoaksengineering.com 0 If you have any questions or require additional information, please contact me by email at james.masongthreeoaksen ing eering com or by phone at (704) 604-8358. Sincerely, (�Electronically am/signed by: V James Mason Senior Environmental Scientist/Project Manager Three Oaks Engineering, Inc. Three Oaks Engineering threeoaksengineering.com 0 Figure Three Oaks Engineering threeoaksengineering.com Prepared For: Schnabel ENGINEEPING Duke Roxboro Station Project Study Area Person County, North Carolina Date: August 2022 Scale: a O 330 o a O rear Job No.: 20-624 Drawn By: Checked By: JSM NSO Figure