Loading...
HomeMy WebLinkAbout20221686 Ver 1_Change WL impacts_20221214Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... I 1 1 1II1 1 DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information Pre -Filing Meeting Date Request was submitted on: * 6/22/2022 If this is a courtesy copy, please fill in this with the submission date. County (or Counties) where the project is located:* Lincoln Is this a NCDMS Project* Yes No Click Yes, only if NCDMS is the applicant or co -applicant. 1 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... Is this project a public transportation project?* Yes - No This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project. la. Type(s) of approval sought from the Corps: * Q Section 404 Permit (wetlands, streams and waters, Clean Water Act) O Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization?* Nationwide Permit (NWP) ❑ Regional General Permit (RGP) n Standard (IP) lc. Has the NWP or GP number been verified by the Corps?* Yes No Nationwide Permit (NWP) Number: 18 - Minor Fill NWP Numbers (for multiple NWPS): List all NW numbers you are applying for not on the drop down list. 1 d. Type(s) of approval sought from the DWR: * check all that apply El 401 Water Quality Certification - Regular ❑ Non-404 Jurisdictional General Permit ❑ Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 2 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... If. Is this an after -the -fact permit application? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. Yes No Acceptance Letter Attachment Click the upload button or drag and drop files here to attach document FILE TYPE MUST BE PDF lh. Is the project located in any of NC's twenty coastal counties?* Yes No 1 j. Is the project located in a designated trout watershed?* Yes No Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination /Trout.aspx B. Applicant Information la. Who is the Primary Contact? Bryan Blythe of Crescent Communities 1 b. Primary Contact Email:* BBLYTHE@CrescentCom munities.com Id. Who is applying for the permit?* Owner (Check all that apply) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: * J H Heafner Company Inc c/o American Tire Real Estate lc. Primary Contact Phone:* (xxx)xxx-xxxx (980)321-6167 Applicant (other than owner) 3 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... 2b. Deed book and page no.: 925 / 382 2c. Contact Person: (for Corporations) 2d. Address* Street Address 12200 Herbert Wayne Ct Ste 150 Address Line 2 City State / Province / Region Huntersville North Carolina Postal / Zip Code Country 28078-6397 Mecklenburg 2e. Telephone Number: * (xxx)xxx-xxxx (000)000-0000 2f. Fax Number: (000)000-0000 (xxx)xxx-xxxx 2g. Email Address:* unknown@gmail.com 3. Applicant Information (if different from owner) 3a. Name: * Bryan Blythe 3b. Business Name: (if applicable) Crescent Communities 3c. Address* 4 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... Street Address 601 South Tryon Street, Suite 800 Address Line 2 City State / Province / Region Charlotte North Carolina Postal / Zip Code Country 28202 Mecklenburg 3d. Telephone Number:* 3e. Fax Number: (980)321-6167 (xxx)xxx-xxxx 3f. Email Address: * BBLYTHE@CrescentCommunities.com (000)000-0000 (xxx)xxx-xxxx 5 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... 4. Agent/Consultant (if applicable) 4a. Name: * Jennifer L Robertson 4b. Business Name: (if applicable) Atlas Environmental, Inc. 4c. Address* Street Address 338 S. Sharon Amity Road #411 Address Line 2 City State / Province / Region Charlotte North Carolina Postal / Zip Code Country 28211 Mecklenburg 4d. Telephone Number:* (704)512-1206 (xxx)xxx-xxxx 4f. Email Address:* jrobertson@atlasenvi.com 4e. Fax Number: (000)000-0000 (xxx)xxx-xxxx C. Project Information and Prior Project History 1. Project Information 1 a. Name of project: * Finger Mill Road lb. Subdivision name: (if appropriate) 1c. Nearest municipality / town: * Lincolnton 6 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... 2. Project Identification 2a. Property Identification Number: 2b. Property size: (tax PIN or parcel ID) (in acres) 3635888860 24.81 2c. Project Address Street Address 3075 Finger Mill Road Address Line 2 City State / Province / Region Lincolnton North Carolina Postal / Zip Code Country 28092 Lincoln 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.539965 -81.220756 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Larkard Creek (Gladdens Lake) 3b. Water Resources Classification of nearest receiving water: * Class C Surface Water Lookup 7 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12-digit HUC in which the project is located.* 030501020303 River Basin Lookup 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The review area currently consists of forested land, previously used farmland, and a service road that runs along a sewer line. This service road runs Northeast and Southwest through the Southern region of the property and leads to a sewage pump station which is located outside of the review area. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.107 4g. List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 1,524 4h. Explain the purpose of the proposed project: * The project purpose is for the construction of an industrial building that is approximately 172,720 square feet under the roof. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The project will require mechanized land clearing for grading to remove existing vegetation and to prepare the ground surface for construction. Heavy equipment will be used for grading and clearing activities. The development will also require the construction of parking areas, storm water treatment, utilities, and additional infrastructure. 5. Jurisdictional Determinations 8 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.dcq.nc.gov/Forms/Form/showformsubmission/b7d0ac13-7... 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: Delineation was completed March 03, 2022 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: Example: SAW-2017-99999 SAW-2022-01039 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Jennifer Robertson Atlas Environmental, Inc. Delineation by Atlas Staff 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR. AJD issued on 06/28/2022 by Krysta Stygar 6. Future Project Plans 6a. Is this a phased project? * Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre - construction notification. No D. Proposed Impacts Inventory 9 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Open Waters Pond Construction Buffers 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". 2a. Site 2a1 Reason* 2b. Impact 2c. Type of W. * 2d. W. name * 2e. 2f. Type of 2g. #* (?) (?) type* (?) Forested*Jurisdicition* (?) Impact area* W1 Parking/gradi ng P Headwater Forest 1 WL 1200 Yes Both 0.011 (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.011 2g. Total Wetland Impact 0.011 2i. Comments: Wetland 1200 totals 0.016 acre and only 0.013 acre is proposed to be impacted for the industrial development. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* 10 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.dcq.nc.gov/Forms/Form/showformsubmission/b7d0ac13-7... The site layout, positing, and sizing of the proposed industrial development is designed and engineered to avoid and minimize impacts to the greatest extent possible. There are no proposed impacts to streams. The upper Northern region of one wetland (WL 1200) will be impacted for parking and grading. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: * The French drain is a construction technique that will provide continuous flow and minimize downstream impacts. The finished floor elevation was selected to minimize side slopes. The square footage of the building was also downsized when compared to conceptual drawings. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The wetland impacts are under the mitigation threshold for DWR and the Corps. NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No For a list of options to meet the diffuse flow requirements, click If no, explain why: The project is not located within or adjacent to waters which include Riparian Buffer Protection Rules. 11 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.dcq.nc.gov/Forms/Form/showformsubmission/b7d0ac13-7... 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* Yes No To look up low density requirement click here 15A NCAC 02H .1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? * Yes No N/A - project disturbs < 1 acre Hint: projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer no to this question. 2d. Which of the following stormwater management program(s) apply (check all that apply): * Local Government State If you have a local government approval please include the SMP on their overall impact map. State Stormwater Programs* Phase II Coastal Counties HWQ or ORW Other Comments: Greater than 24% impervious cover G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* Yes No 2. Violations (DWR Requirement) 12 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.dcq.nc.gov/Forms/Form/showformsubmission/b7d0ac13-7... 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. The project is a complete project which is not phased and has no reasonable anticipated future impacts. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. We are connecting to municipal sewer 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* Yes No Unknown 13 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... 5e. Is this a DOT project located within Division's 1-8?* Yes (• No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?** Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* IPAC, NHP, and conducted a field assessment 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: httpt//gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* Yes No 14 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * The NC HPO buffer map identified a house (Finger House) Northeast of the review area. The site is considered not eligible for listing in the NRHP within the survey limits. These comments were received from the State Historical Preservation Office on 09/16/2022. TRC conducted a survey of the review area and identified no cultural resources. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: Project engineers are coordinating all FEMA requirements. 8c. What source(s) did you use to make the floodplain determination?* FEMA NFHL google earth .kml layer Miscellaneous Comments Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Finger Mill Road_NWP 18 Attachments Compressed.pdf File must be PDF or KMZ Signature * By checking the box and signing below, I certify that: 3.98MB 15 of 16 12/1/2022, 11:04 AM Submission Completed https://edocs.deq.nc.gov/Forms/Form/showformsubmission/b7d0ae13-7... • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name:* Jacob Sinclair Signature* Date 12/14/2022 16 of 16 12/1/2022, 11:04 AM