Loading...
HomeMy WebLinkAboutPCN_U-6018 Buffer Info Carpenter,Kristi From:Conchilla, Ryan Sent:Tuesday, December 13, 2022 10:52 AM To:Parker, Jerry A Subject:PCN_U-6018 Buffer Info Attachments:20210663 Ver 2_ePCN Application_20221110.pdf PCN Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8) Division of Water Resources, NC Department of Environmental Quality 919-707-9111 office Ryan.Conchilla@ncdenr.gov From: Parker, Jerry A <japarker3@ncdot.gov> Sent: Monday, December 12, 2022 4:13 PM To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Subject: FW: \[External\] FW: U-6018 Buffer Info Ryan, See if this clears things up. Jerry From: Kayla Poulos <kpoulos@rameykemp.com> Sent: Monday, December 12, 2022 4:10 PM To: Parker, Jerry A <japarker3@ncdot.gov> Subject: \[External\] FW: U-6018 Buffer Info CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jerry, 1 Please see below. Please let me know if you have any questions or need anything additional. Thanks! — Kayla M. Poulos, PE Transportation Design Engineer D 919 872 3949 | C 919 398 0063 From: Karen Hefner <khefner@mi-engineers.com> Sent: Monday, December 12, 2022 4:05 PM To: Kayla Poulos <kpoulos@rameykemp.com> Cc: Linda Johns <ljohns@mi-engineers.com> Subject: Re: U-6018 Buffer Info Kayla, If one were to review the Buffer & Permit drawings, side by side, one might see that there are 3 buffer impacts on Y3Rev and only 1 impact to Stream/Wetland on Y3Rev, which would indicate that there should be 2 less impacts associated with the permit drawings. There is also a site on Y8 that has stream/wetland impacts, but no buffer impacts and there are buffer impacts, but no stream impact at L 44+97 - 46+10 Rt - therefore, those 2 areas are canceling out each other. Kinda summarized below.  Site 1 on Buffer Drawings - has 3 buffer impacts  Site 1 on Permit Drawings – as impacts at same buffer sites  Site 2 Permit Drawings, has NO BUFFER IMPACTS and does not correspond to Buffer Site 2  Site 2 on Buffer Drawing – has impacts but are not associated with Site 2 Permit Drawing  Site 3 on Permit Drawings has only ONE impact, which corresponds to Buffer Site 4 that has 2 impacts – where the little pond is within the buffer on Site 4. There is one impact on Site 4 Buffer that doesn’t have a stream impact and Site 5 on the Buffer has no stream impacts.  Site 3 on Buffer Drawings is at the large pond  Site 4, 5, & 6 on the Permit Drawings are Sites 6, 7, & 8 on the Buffer Drawings  So, there ARE 2 less stream/wetland impacts vs the buffer permit drawings. If there are any other questions, please let me know. Thanks, Karen Hefner, PE Hydraulics Project Engineer 2 MI Engineering, PLLC 1011 Schaub Drive, Suite 100 Raleigh, NC 27606 Cell: 919-333-8976 Office: 919-851-6606 website: www.mi-engineers.com email: khefner@mi-engineers.com From: Kayla Poulos <kpoulos@rameykemp.com> Sent: Monday, December 12, 2022 1:46 PM To: Karen Hefner <khefner@mi-engineers.com> Cc: Linda Johns <ljohns@mi-engineers.com> Subject: Re: U-6018 Buffer Info Karen, Have you had a chance to look into this? I just talked to Jerry and he said that he’s going to have to put the permit/project on hold if he doesn’t have an answer by first thing tomorrow morning. Could we get them something today? Thanks! — Kayla M. Poulos, PE Transportation Design Engineer D 919 872 3949 | T 919 872 5115 | C 919 398 0063 On Dec 8, 2022, at 5:40 PM, Karen Hefner <khefner@mi-engineers.com> wrote: I’ll try to look at this in the morning, hopefully… Sent from my iPhone On Dec 8, 2022, at 4:35 PM, Kayla Poulos <kpoulos@rameykemp.com> wrote: See below/attached from Jerry on U6018. Let me know if you have any questions. 3 Thanks! — Kayla M. Poulos, PE Transportation Design Engineer D 919 872 3949 | C 919 398 0063 \[Text Description automatically generated\] <https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Frameykemp.co m%2F&amp;data=05%7C01%7Ckpoulos%40rameykemp.com%7C04861ab7774048069c 5e08dad96d319b%7C0a14eb0718334f149619a5b18eac28cf%7C0%7C0%7C6380613602 62206363%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLC JBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=58yVOK%2Fm0zTl SSEcjiLIHxfN3bXMIKGJVUBHBdw6rCo%3D&amp;reserved=0> From: Parker, Jerry A <japarker3@ncdot.gov> Sent: Thursday, December 8, 2022 7:18 AM To: Kayla Poulos <kpoulos@rameykemp.com> Subject: FW: U-6018 Buffer Info Kayla, Per our conversation, can you provide clarification for the DWR rep. Thanks. Jerry From: Conchilla, Ryan <ryan.conchilla@ncdenr.gov<mailto:ryan.conchilla@ncdenr.gov>> Sent: Wednesday, December 7, 2022 1:57 PM To: Parker, Jerry A <japarker3@ncdot.gov<mailto:japarker3@ncdot.gov>> Subject: FW: U-6018 Buffer Info Jerry, Thanks for the additional info. In the updated buffer drawings attached, the impact table on page 12 lists 8 impact sites. In the revised permit drawings forwarded yesterday, the impact table listed on page 10 of 11 has 6 impact sites. Can you provide clarification to the difference? 4 Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8) Division of Water Resources, NC Department of Environmental Quality 919-707-9111 office Ryan.Conchilla@ncdenr.gov<mailto:Ryan.Conchilla@ncdenr.gov> \[cid:image002.png@01D90A42.DDCA4400\] From: Parker, Jerry A <japarker3@ncdot.gov<mailto:japarker3@ncdot.gov>> Sent: Wednesday, December 7, 2022 12:39 PM To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov<mailto:ryan.conchilla@ncdenr.gov>> Subject: U-6018 Buffer Info Ryan, See attached. Jerry Jerry Parker Environmental Supervisor Division 7 North Carolina Department of Transportation 336 256 2063 office jparker@ncdot.gov<mailto:jparker@ncdot.gov> 1584 Yanceyville St. P.O. Box 14996 Greensboro, NC. 27415-4996 \[cid:image001.png@01D90A38.E619B0F0\] 5 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 6